10th & Nicollet Street Improvements
Project Objectives
- Improve street surface conditions
- Reduce sewer inflow, infiltration and obstructions
- Increase water system flow capacity
- Replace deteriorating infrastructure
- Improve reliability and decrease maintenance
- Improve surface drainage conditions
Proposed Improvements – Reconstruction
- Street Reconstruction; Subsurface Drains
- Bituminous Street Restoration
- Concrete Street Restoration
- Driveway Aprons, Curb & Gutter
- Concrete Sidewalk Along 10th Street
- Sanitary Sewer Mains, Pipes and Manholes
- Water and Sewer Lines to Property Lines
- Replace Watermain, Hydrants, Valves and Fittings
- Storm Sewer Mains, Pipes, Manholes, and Catch Basins
Anticipated Start Date
May 13
Contractor
Ulland Brothers, Inc.
Click below to sign up for project updates!
Contact Us!
Ben Rosol
On-Site Inspector
Bolton & Menk, Inc.
(507) 236-6357
Benjamin.Rosol@bolton-menk.com
Wes Brown
Bolton & Menk, Inc.
(507) 381-0380
wesley.brown@bolton-menk.com