South Sailor Street Improvements

Project Objectives

  • Improve street surface conditions
  • Reduce sewer inflow, infiltration and obstructions
  • Increase water system flow capacity
  • Replace deteriorating infrastructure
  • Improve reliability and decrease maintenance
  • Improve surface drainage conditions

Proposed Improvements – Reconstruction

  • Street Reconstruction; Subsurface Drains
  • Driveway Aprons, Curb & Gutter
  • Sanitary Sewer Mains, Pipes and Manholes
  • Water and Sewer Lines to Property Lines
  • Replace Watermain, Hydrants, Valves and Fittings
  • Concrete Sidewalk along 5th  Street

Proposed Improvements – Mill and Overlay

  • Curb Repair where needed
  • Milling off some of the existing pavement where curb exists
  • Paving a 2-inch bituminous mat over the entire roadway surface
  • City Hall Parking Lot – full pavement removal and regrading to improve drainage

Anticipated Start Date

April 27

Contractor

Dirt Merchant, Inc

South Sailor Street Updates
To sign up for updates, please enter your contact information below.

What's Under My Street?

Contact Us!

Ben Rosol
On-Site Inspector
Bolton & Menk, Inc.
(507) 236-6357
Benjamin.Rosol@bolton-menk.com

Wes Brown
Bolton & Menk, Inc.
(507) 381-0380
wesley.brown@bolton-menk.com