Project Overview
Project Objectives
- Improve street surface conditions
- Reduce sewer inflow, infiltration, and obstructions
- Increase water system flow capacity
- Replace deteriorating infrastructure
- Improve reliability and decrease maintenance
- Improve surface drainage conditions
Proposed Improvements – Reconstruction
- Street reconstruction: subsurface drains
- Driveway aprons, curb & gutter
- Sanitary sewer mains, pipes, and manholes
- Storm sewer mains, pipes, and manholes
- Replace watermain, hydrants, valves, and fittings
- Water and sewer lines to property lines
- Concrete sidewalk
Contractor
Holtmeier Construction, Inc.
Click below to sign up for project updates!
Contact Us!
Wade Bartz
On-Site Inspector | Bolton & Menk, Inc.
(507) 848-4439
Wade.Bartz@bolton-menk.com
Ben Rosol
Project Engineer | Bolton & Menk, Inc.
(507) 236-6357
Benjamin.Rosol@bolton-menk.com
Wes Brown
City Engineer | Bolton & Menk, Inc.
(507) 381-0380
wesley.brown@bolton-menk.com