The City of Foley is regionalizing their wastewater system with the City of St. Cloud. The improvements include two regionalization lift stations, rehabilitation of two existing city lift stations, force main, sanitary sewer, and other minor improvements. Some general information about the proposed system is:
- Total length of force main – 15.8 miles
- Force main diameter – 12 inches, nominal
- Approximate force main volume when full – 489,850 gallons
- Number of air & vacuum release manholes – 42
- Wastewater travel time from Foley to St. Cloud – approximately 20 hours
- Elevation difference Foley to St. Cloud – drop of 106 feet