{"id":1140,"date":"2023-05-30T16:47:06","date_gmt":"2023-05-30T16:47:06","guid":{"rendered":"https:\/\/clients.bolton-menk.com\/hopkinsavenuesproject\/?page_id=1140"},"modified":"2026-05-29T18:43:14","modified_gmt":"2026-05-29T18:43:14","slug":"updates","status":"publish","type":"page","link":"https:\/\/clients.bolton-menk.com\/hopkinsavenuesproject\/updates\/","title":{"rendered":"Project Updates"},"content":{"rendered":"<div class=\"wpb-content-wrapper\"><p>[vc_row][vc_column][vc_column_text css=&#8221;&#8221;]<\/p>\n<h2>Project Updates<\/h2>\n<p>[\/vc_column_text][vc_empty_space height=&#8221;20px&#8221;][vc_column_text css=&#8221;&#8221;]<\/p>\n<h4>May 29, 2026<\/h4>\n<p><strong>12th Avenue Detour Adjustment Next Week<\/strong><\/p>\n<p><span style=\"text-decoration: underline\"><strong>Week of May 25<\/strong><\/span><\/p>\n<ul>\n<li>Sidewalks on Phases 2A (11th Ave N from 3rd St N to Minnetonka Mills Rd and 4th St N from 12th Ave N to 11th Ave N) and 2B (12th Ave N from 1st St N to 2nd St N) were completed<\/li>\n<li>Utility work continued on Phase 2C (12th Ave N from 2nd St N to Hwy 7)<\/li>\n<\/ul>\n<p><span style=\"text-decoration: underline\"><strong>Week of June 1<\/strong><\/span><\/p>\n<ul>\n<li>Topsoil will be installed on Phases 2A and 2B<\/li>\n<li>Utility work will continue on Phase 2C<\/li>\n<li>Houses on the 200 block of 12th Avenue N may be switched off the temporary water system and onto city water early to mid-week<\/li>\n<li>Starting Wednesday June 3, the 12th Avenue detour will be shifted slightly from Mainstreet to 1st Street N. See <a href=\"https:\/\/clients.bolton-menk.com\/hopkinsavenuesproject\/wp-content\/uploads\/sites\/296\/2026\/05\/Hopkins-Central-Ave-12th-Ave-N-5-29-Detour.jpg\" target=\"_blank\" rel=\"noopener\">detour map<\/a> below for more details.<\/li>\n<\/ul>\n<p><span style=\"text-decoration: underline\"><strong>Additional Notes<\/strong><\/span><\/p>\n<ul>\n<li>Driveway access, sidewalk accessibility, and on-street parking will not be accessible along Phase 2A, 2B, and 2C during the working day (7 a.m. to 7 p.m.)<\/li>\n<li>Please try to avoid work zones for the safety of the contractor and the public.<\/li>\n<li>Garbage, recycling, and organics pickup for 12<sup>th<\/sup>\u00a0Avenue properties between 1<sup>st<\/sup>\u00a0and 2<sup>nd<\/sup>\u00a0St N can be set out in the alley Monday nights so the contractor can wheel them over to a side street to be collected. Bins will then be brought back after pickup on Tuesdays.<\/li>\n<\/ul>\n<p>[\/vc_column_text][vc_column_text css=&#8221;&#8221;]<\/p>\n<h4>12th Avenue Detour Map<\/h4>\n<p>[\/vc_column_text][vc_empty_space height=&#8221;10px&#8221;][vc_single_image image=&#8221;1504&#8243; img_size=&#8221;large&#8221; css=&#8221;&#8221;][vc_empty_space height=&#8221;20px&#8221;][vc_column_text css=&#8221;&#8221;]<\/p>\n<h4>May 22, 2026<\/h4>\n<p><strong>Phase 2A and 2B Concrete Sidewalk Work Starting This Week<\/strong><\/p>\n<p><span style=\"text-decoration: underline\"><strong>Week of May 18<\/strong><\/span><\/p>\n<ul>\n<li>Final grading for road construction on Phases 2A (11th Ave N from 3rd St N to Minnetonka Mills Rd and 4th St N from 12th Ave N to 11th Ave N) and 2B (12th Ave N from 1st St N to 2nd St N) was completed<\/li>\n<li>The contractor installed the first layer of pavement on phases 2A and 2B<\/li>\n<li>Concrete driveways and alleys on Phase 2A and 2B were poured and have been opened to access<\/li>\n<li>The contractor completed grading for sidewalks on Phases 2A and 2B.<\/li>\n<li>Utility work started on Phase 2C (12th Ave N from 2nd St N to Hwy 7)<\/li>\n<\/ul>\n<p><span style=\"text-decoration: underline\"><strong>Week of May 25<\/strong><\/span><\/p>\n<ul>\n<li>No work will occur on Memorial Day (Monday, May 25)<\/li>\n<li>The contractor will complete grading for sidewalks on Phase 2B<\/li>\n<li>Concrete will be poured for sidewalks on Phase 2A and 2B<\/li>\n<li>Utility work will continue on Phase 2C<\/li>\n<\/ul>\n<p>[\/vc_column_text][vc_empty_space height=&#8221;20px&#8221;][vc_column_text css=&#8221;&#8221;]<\/p>\n<h4>Lake Minnetonka Regional Trail Detour Map<\/h4>\n<p>[\/vc_column_text][vc_empty_space height=&#8221;10px&#8221;][vc_single_image image=&#8221;1491&#8243; img_size=&#8221;large&#8221; css=&#8221;&#8221;][vc_empty_space height=&#8221;20px&#8221;][vc_column_text css=&#8221;&#8221;]<\/p>\n<h4>May 15, 2026<\/h4>\n<p><strong>Phase 2A and 2B First Layer of Paving Later Next Week<\/strong><\/p>\n<p><span style=\"text-decoration: underline\"><strong>Week of May 11<\/strong><\/span><\/p>\n<ul>\n<li>Initial grading for road construction on Phases 2A (11th Ave N from 3rd St N to Minnetonka Mills Rd and 4th St N from 12th Ave N to 11th\u00a0Ave N)\u00a0and 2B (12th Ave N from 1st St N to 2nd St N)\u00a0was completed.<\/li>\n<li>Curb and gutter was\u00a0completed on Phase 2A and 2B<\/li>\n<li>Phase 2B initial roadway grading was completed<\/li>\n<li>Removals on Phase 2C\u00a0(12th Avenue N from 2<sup>nd<\/sup>\u00a0St N to Hwy 7) were completed<\/li>\n<li>The contractor started connecting houses on Phase 2C to the temporary waster system and will continue Monday, May 18.<\/li>\n<li>Detours for both <a href=\"https:\/\/clients.bolton-menk.com\/hopkinsavenuesproject\/wp-content\/uploads\/sites\/296\/2026\/05\/Hopkins-Central-Ave-12th-Ave-N-Detour-Map_May-11-Closure.jpg\" target=\"_blank\" rel=\"noopener\">12<sup>th<\/sup>\u00a0Avenue N<\/a> and the <a href=\"https:\/\/clients.bolton-menk.com\/hopkinsavenuesproject\/wp-content\/uploads\/sites\/296\/2026\/05\/Hopkins-Central-Ave-12th-Ave-N-Trail-Detour-Map.jpg\" target=\"_blank\" rel=\"noopener\">Lake Minnetonka Regional Trail<\/a> were set up<\/li>\n<\/ul>\n<p><span style=\"text-decoration: underline\"><strong>Week of May 18<\/strong><\/span><\/p>\n<ul>\n<li>Driveways and alleys on Phase 2A and 2B will be poured and will be opened later in the week<\/li>\n<li>Final grading for road construction on Phase 2A and 2B will occur<\/li>\n<li>Grading for sidewalks on Phase 2A and 2B will take place<\/li>\n<li>The first layer of pavement on Phases 2A and 2B is scheduled to be paved on Friday, May 22.<\/li>\n<li>Utility work will start on Phase 2C, starting with sanitary sewer.<\/li>\n<\/ul>\n<p>[\/vc_column_text][vc_empty_space height=&#8221;20px&#8221;][vc_column_text css=&#8221;&#8221;]<\/p>\n<h4>May 8, 2026<\/h4>\n<p align=\"left\"><strong>12th Avenue Closure Starting Monday, May 11<\/strong><\/p>\n<p><span style=\"text-decoration: underline\"><strong>Week of May 4<\/strong><\/span><\/p>\n<ul>\n<li>CenterPoint Energy completed work on 12th Avenue N<\/li>\n<li>Utility work on Phases 2A (11th Ave N from 3rd St N to Minnetonka Mills Rd and 4th St N from 12th Ave N to 11th Ave N) and 2B (12th Ave N from 1st St N to 2nd St N) were completed<\/li>\n<li>Phase 2B roadway grading was completed<\/li>\n<li>The contractor completed initial concrete punch list work on year 1 phases<\/li>\n<\/ul>\n<p><span style=\"text-decoration: underline\"><strong>Week of May 11<\/strong><\/span><\/p>\n<ul>\n<li>Grading for road construction on Phase 2B will begin and be completed by mid to late-week.<\/li>\n<li>Roadway, curb, sidewalk, and driveway removals on Phase 2C (12th Avenue N from 2<sup>nd<\/sup>\u00a0St N to Hwy 7) will start on Monday, May 11.\n<ul>\n<li>Please remove any private items or landscaping features from the public right-of-way that will be affected by construction. Affected properties have been notified of upcoming construction impacts.<\/li>\n<\/ul>\n<\/li>\n<li>Phase 2C includes a full closure of 12<sup>th<\/sup>\u00a0Avenue N at Hwy 7, a detour route (see detour map below) will be set up Monday, May 11 using 5<sup>th<\/sup>\u00a0Avenue N and 17<sup>th<\/sup>\u00a0Avenue N.<\/li>\n<li>A detour for the Lake Minnetonka Regional Trail (see detour map below) will be set up Monday, May 11 using 9<sup>th<\/sup>\u00a0Avenue N and 14<sup>th<\/sup>\u00a0Avenue N.<\/li>\n<li>The temporary water system on Phase 2C will be set up, and residences will be connected later in the week of May 11, or early the following week.<\/li>\n<li>Concrete for curb and gutter in Phases 2A and 2B is scheduled to be poured later in the week. Residents will be notified of concrete pouring prior to work beginning.<\/li>\n<\/ul>\n<p>[\/vc_column_text][vc_empty_space height=&#8221;20px&#8221;][vc_column_text css=&#8221;&#8221;]<\/p>\n<h4>May 4, 2026<\/h4>\n<p align=\"left\"><strong>Alley Closure\u00a0between 8<sup>th<\/sup>\u00a0and 9<sup>th<\/sup>\u00a0Avenue 200 Block<\/strong><\/p>\n<ul>\n<li>Starting the afternoon of Tuesday, May 5, the contractor will be removing and replacing defective concrete alley panels in the alley between 8<sup>th<\/sup>\u00a0and 9<sup>th<\/sup>\u00a0Street within the 200 block.\n<ul>\n<li>The closure will be taking place in the middle of the block. Access will be available from each side of the alley on 2<sup>nd<\/sup>\u00a0St and 3<sup>rd<\/sup>\u00a0St.<\/li>\n<\/ul>\n<\/li>\n<li>Some alley access driveways will be impacted, but on-street parking will be available<\/li>\n<li>The alley is scheduled to re-open on Monday, May 11.<\/li>\n<\/ul>\n<p>[\/vc_column_text][vc_empty_space height=&#8221;20px&#8221;][vc_column_text css=&#8221;&#8221;]<\/p>\n<h4>May 1, 2026<\/h4>\n<p><strong>Phases 2A and 2B Utility Work Wrapping Up Next Week<\/strong><\/p>\n<p><span style=\"text-decoration: underline\"><strong>Week of April 27<\/strong><\/span><\/p>\n<ul>\n<li>CenterPoint Energy started work on replacing gas service lines on the north end of 12th Avenue N<\/li>\n<li>Utility work continued on Phase 2A (11th Ave N from 3rd St N to Minnetonka Mills Rd and 4th St N from 12th Ave N to 11th Ave N) and 2B (12th Ave N from 1st St N to 2nd St N)<\/li>\n<li>Concrete punch list repair work started on 9th Avenue N, 10th Avenue N, and 11th Avenue N<\/li>\n<\/ul>\n<p><strong><u>Week of May 4<\/u><\/strong><\/p>\n<ul>\n<li>CenterPoint Energy will finish gas service replacement work on the north end of 12th Avenue N<\/li>\n<li>Utility work on Phases 2A and 2B will be Completed.<\/li>\n<li>Concrete punch list work will continue on Monday April 4, which includes a closure of the alley entrance on the southern side of 2nd St N between 10th and 11th Avenue N. Affected properties with alley access have been notified.<\/li>\n<li>Grading for road construction may start later in the week on Phases 2A and 2B.<\/li>\n<\/ul>\n<p><span style=\"text-decoration: underline\"><strong>Week of May 11<\/strong><\/span><\/p>\n<ul>\n<li>Grading for road construction on Phases 2A and 2B will continue<\/li>\n<li>Roadway, curb, sidewalk, and driveway removals on Phase 2C (12th Avenue N from 2<sup>nd<\/sup>\u00a0St N to Hwy 7) will start on Monday, May 11.\n<ul>\n<li>Please remove any private items or landscaping features from the public right-of-way that will be affected by construction. Affected properties have been notified of upcoming construction impacts.<\/li>\n<\/ul>\n<\/li>\n<li>The temporary water system on Phase 2C will be set up, and residences will be connected later in the week of May 11, or early the following week.<\/li>\n<li>Concrete for curb and gutter in Phases 2A and 2B is scheduled to be poured, residents will be notified of concrete pouring prior to work beginning.<\/li>\n<\/ul>\n<p><strong><span style=\"text-decoration: underline\">Additional Notes<\/span><\/strong><\/p>\n<ul>\n<li>Driveway access, sidewalk accessibility, and on-street parking will not be accessible along Phase 2A and 2B during the working day (7 a.m. to 7 p.m.)<\/li>\n<li>Please try to avoid work zones for the safety of the contractor and the public.<\/li>\n<li>Garbage, recycling, and organics pickup for 12<sup>th<\/sup>\u00a0Avenue properties between 1<sup>st<\/sup>\u00a0and 2<sup>nd<\/sup>\u00a0St N can be set out in the alley Monday nights so the contractor can wheel them over to a side street to be collected. Bins will then be brought back after pickup on Tuesdays.<\/li>\n<\/ul>\n<p>[\/vc_column_text][vc_empty_space height=&#8221;10px&#8221;][vc_column_text css=&#8221;&#8221;]<strong>12th Avenue Detour Map<\/strong>[\/vc_column_text][vc_empty_space height=&#8221;10px&#8221;][vc_single_image image=&#8221;1473&#8243; img_size=&#8221;large&#8221; css=&#8221;&#8221;][vc_empty_space height=&#8221;20px&#8221;][vc_column_text css=&#8221;&#8221;]<\/p>\n<h4>April 30, 2026<\/h4>\n<p><strong>Concrete Repairs on 11th Avenue <\/strong><strong>Starting Soon<\/strong><\/p>\n<ul>\n<li>Due to the contractor completing concrete repairs quicker than anticipated, concrete repairs will be starting on 11th Avenue between 1st Street and 3rd Street on Thursday, April 30.<\/li>\n<li>The concrete subcontractor will be sawing concrete panels, chipping off excess concrete, removing panels, and conducting other concrete repair tasks.<\/li>\n<li>Replacement of concrete panels and stairs is anticipated to begin shortly after.<\/li>\n<\/ul>\n<p>[\/vc_column_text][vc_empty_space height=&#8221;20px&#8221;][vc_column_text css=&#8221;&#8221;]<\/p>\n<h4>April 29, 2026<\/h4>\n<p align=\"left\"><strong>Concrete Repairs on 10th Avenue\u00a0<\/strong><strong>Start Today<\/strong><\/p>\n<ul>\n<li>Starting Wednesday April 29, the concrete subcontractor will be sawing concrete panels, chipping off excess concrete, removing panels, and conducting other concrete repair tasks.<\/li>\n<li>Replacement of concrete panels and stairs will begin shortly after.<\/li>\n<li>The concrete removal and replacement process will take approximately 1 week to complete once the removals begin, depending on weather conditions.<\/li>\n<\/ul>\n<p>[\/vc_column_text][vc_empty_space height=&#8221;20px&#8221;][vc_column_text css=&#8221;&#8221;]<\/p>\n<h4>April 24, 2026<\/h4>\n<p class=\"elementtoproof\"><strong>Utility Work Continuing Next Week<\/strong><\/p>\n<p><strong><u>Week of April 20<\/u><\/strong><\/p>\n<ul>\n<li>CenterPoint Energy finished gas service work on 13<sup>th<\/sup>\u00a0Avenue N<\/li>\n<li>Phase 2A (11th Ave N from 3rd St N to Minnetonka Mills Rd and 4th St N from 12th Ave N to 11th Ave N) and 2B (12th Ave N from 1st St N to 2nd St N) properties were connected to the temporary water system<\/li>\n<li>Utility work started on Phases 2A and 2B<\/li>\n<li>A water shutdown was completed for 12th Avenue N on Tuesday, April 21. The project team would like to thank everyone for their patience and flexibility during this shutdown!<\/li>\n<li>Concrete punch list work started on 9<sup>th<\/sup>\u00a0Avenue N, including sawing concrete panels and chipping excess concrete<\/li>\n<\/ul>\n<p><strong><u>Week of April 27<\/u><\/strong><\/p>\n<ul>\n<li>CenterPoint Energy will start work on gas service replacements on the north end of 12<sup>th<\/sup>\u00a0Avenue N<\/li>\n<li>Utility work on Phases 2A and 2B will continue<\/li>\n<li>Concrete punch list work on 9<sup>th<\/sup>\u00a0Avenue N will continue, including concrete removal and replacement<\/li>\n<\/ul>\n<p>[\/vc_column_text][vc_empty_space height=&#8221;20px&#8221;][vc_column_text css=&#8221;&#8221;]<\/p>\n<h4>April 22, 2026<\/h4>\n<p align=\"left\"><strong>Concrete Repairs on 9th Avenue Start Tomorrow<\/strong><\/p>\n<p align=\"left\"><strong><u>April 23<\/u><\/strong><\/p>\n<ul>\n<li>Starting Thursday April 23, the concrete subcontractor will be sawing concrete panels, chipping off excess concrete, and conducting other concrete repair tasks.<\/li>\n<li>Removal and replacement of marked concrete panels and stairs will begin next week, on Monday April 27, or Tuesday April 28.<\/li>\n<li>The concrete removal and replacement process will take approximately 1 week to complete once the removals begin, depending on weather conditions.<\/li>\n<\/ul>\n<p>[\/vc_column_text][vc_empty_space height=&#8221;20px&#8221;][vc_column_text css=&#8221;&#8221;]<\/p>\n<h4>April 17, 2026<\/h4>\n<p><strong>Utility Work Starting Next Week<\/strong><\/p>\n<p align=\"left\"><strong><u>Week of April 13<\/u><\/strong><\/p>\n<ul>\n<li>CenterPoint Energy continued with their gas main and gas service work on 4th Street N (11th Ave N to 12th Ave N) and 12<sup>th<\/sup>\u00a0Ave N\u00a0(3rd Street N to Hwy 7).<\/li>\n<li>Traffic control devices and sidewalk closure signage was installed along Phase 2A (11th Ave N from 3rd St N to Minnetonka Mills Rd and 4th St N from 12th Ave N to 11th Ave N) and 2B (12th Ave N from 1st St N to 2nd St N)<\/li>\n<li>12<sup>th<\/sup>\u00a0Avenue N detour was posted and is currently active<\/li>\n<li>Tree removals for all 2026 phases are complete<\/li>\n<li>Phase 2A and 2B removals, such as existing sidewalks, curb, driveways, and street pavement are complete<\/li>\n<li>Phase 2A and 2B temporary water system was set up<\/li>\n<\/ul>\n<p>[\/vc_column_text][vc_empty_space height=&#8221;20px&#8221;][vc_column_text css=&#8221;&#8221;]<\/p>\n<p align=\"left\"><strong><u>Week of April 20<\/u><\/strong><\/p>\n<ul>\n<li>CenterPoint Energy will start work on gas service replacements<\/li>\n<li>Phase 2A and 2B properties will be hooked up to the temporary water supply on Monday and Tuesday<\/li>\n<li>Utility work on Phases 2A and 2B will start, starting with sanitary sewer replacements<\/li>\n<li><strong>A water shutdown is scheduled for Tuesday, April 21 from 12:00 to 3:30 pm for 12<sup>th<\/sup>\u00a0Avenue N utility work.<\/strong>\u00a0Affected properties will be notified.<\/li>\n<\/ul>\n<p align=\"left\"><span style=\"text-decoration: underline\">\u00a0<strong>Additional Notes<\/strong><\/span><\/p>\n<ul>\n<li>Starting April 13, driveways, sidewalks, and on-street parking will not be accessible along Phase 2A and 2B during the working day (7 a.m. to 7 p.m.)<\/li>\n<li>Please try to avoid work zones for the safety of the contractor and the public<\/li>\n<\/ul>\n<p>[\/vc_column_text][vc_empty_space height=&#8221;20px&#8221;][vc_column_text css=&#8221;&#8221;]<\/p>\n<h4>April 10, 2026<\/h4>\n<p><strong>Road Removals Starting Next Week<\/strong><\/p>\n<p align=\"left\"><strong><u>Week of April 13<\/u><\/strong><\/p>\n<ul>\n<li>CenterPoint Energy will start gas main and gas service\u00a0work on 4th Street N (11th Ave N to 12th Ave N) and 12<sup>th<\/sup>\u00a0Ave N\u00a0(3rd Street N to Hwy 7)<\/li>\n<li>Traffic control devices and sidewalk closure signage will be installed along Phase 2A and 2B\n<ul>\n<li>There will be a detour around 12<sup>th<\/sup>\u00a0Ave during construction, local access to properties will be maintained during this work.\u00a0<a href=\"https:\/\/clients.bolton-menk.com\/hopkinsavenuesproject\/wp-content\/uploads\/sites\/296\/2026\/04\/Hopkins-Central-Ave-12th-Ave-N-Detour-Map.jpg\" target=\"_blank\" rel=\"noopener\">See detour map<\/a>\u00a0(below) for travel routes.<\/li>\n<li>The Minnetonka Regional Trail is planned to remain open and accessible until further notice<\/li>\n<\/ul>\n<\/li>\n<li>Tree removals will occur in all 2026 Phases.<\/li>\n<li>Phase 2A (11th Ave N from 3rd St N to Minnetonka Mills Rd and 4th St N from 12th Ave N to 11th Ave N) and 2B (12th Ave N from 1st St N to 2nd St N)\u00a0removals, such as existing sidewalks, curb, driveways, and street pavement will occur<\/li>\n<li>Phase 2A and 2B temporary water system will be set up and houses will be hooked up to the temporary water supply towards the end of the week and into the following week.<\/li>\n<\/ul>\n<p>[\/vc_column_text][vc_column_text css=&#8221;&#8221;]<\/p>\n<p align=\"left\"><strong><u>Week of April 20<\/u><\/strong><\/p>\n<ul>\n<li>CenterPoint Energy will continue gas main and gas service work<\/li>\n<li>Utility work on Phases 2A and 2B will start, beginning with sanitary sewer replacements<\/li>\n<li>A water shutdown will be scheduled early in the week during the workday for utility work on 12<sup>th<\/sup>\u00a0Avenue N. Affected properties will be notified when the water shutdown is scheduled.<\/li>\n<\/ul>\n<p align=\"left\"><span style=\"text-decoration: underline\">\u00a0<strong>Additional Notes<\/strong><\/span><\/p>\n<ul>\n<li>The contractor will have their material storage for 2026 work isolated to one side of the road on various streets throughout the project area, including future phases and streets that will be under construction later this summer.<\/li>\n<\/ul>\n<p>[\/vc_column_text][vc_empty_space height=&#8221;20px&#8221;][vc_column_text css=&#8221;&#8221;]<\/p>\n<h4>April 3, 2026<\/h4>\n<p><strong>Construction will resume on April 13<\/strong><\/p>\n<p><u>Week of April 6<\/u><\/p>\n<ul>\n<li>Trees on all 2026 Phases will be marked for removal with a pink ribbon (Phase 2A through Phase 2E)<\/li>\n<li>Advanced notice signage for work scheduled to start on April 13 will be placed at Phases 2A (11th Ave N from 3rd St N to Minnetonka Mills Rd and 4th St N from 12th Ave N to 11th Ave N)\u00a0and 2B (12th Ave N from 1st St N to 2nd St N)<\/li>\n<\/ul>\n<p><u>Week of April 13<\/u><\/p>\n<ul>\n<li>CenterPoint Energy will start gas main and gas service\u00a0work on 4th Street N (11th Ave N to 12th Ave N) and 12<sup>th<\/sup> Ave N\u00a0(3rd Street N to Hwy 7)<\/li>\n<li>Traffic control devices and sidewalk closure signage will be installed along Phase 2A and 2B\n<ul>\n<li>There will be a detour around 12<sup>th<\/sup>\u00a0Ave during construction, local access to properties will be maintained<\/li>\n<li>Detour for Minnetonka Regional Trail closure will use 14<sup>th<\/sup>\u00a0Ave N, 1<sup>st<\/sup>\u00a0St N, and 9<sup>th<\/sup>\u00a0Ave<\/li>\n<\/ul>\n<\/li>\n<li>Tree removals will occur in all 2026 Phases.<\/li>\n<li>Phase 2A\u00a0and 2B removals, such as existing sidewalks, curb, driveways, and street pavement will occur<\/li>\n<li>Phase 2A and 2B temporary water system will be set up and houses will be hooked up to the temporary water supply towards the end of the week<\/li>\n<\/ul>\n<p><u>Week of April 20<\/u><\/p>\n<ul>\n<li>CenterPoint Energy will continue gas main and gas service work<\/li>\n<li>Utility work on Phases 2A and 2B will start, starting with sanitary sewer replacements<\/li>\n<\/ul>\n<p>[\/vc_column_text][vc_empty_space height=&#8221;20px&#8221;][vc_column_text css=&#8221;&#8221;]<\/p>\n<h4>November 21, 2025<\/h4>\n<p><strong>Last Update of the Year!<\/strong><\/p>\n<p><u>Week of November 17<\/u><\/p>\n<ul>\n<li>Permanent signage installation completed on all year 1 phases<\/li>\n<li>Pavement crosswalk blocks were installed on all year 1 phases<\/li>\n<\/ul>\n<p><u>Week of November 24<\/u><\/p>\n<ul>\n<li>Final restoration will take place near the 9<sup>th<\/sup> Avenue Alley as well as a few other areas<\/li>\n<\/ul>\n<p><u>Additional Notes:<\/u><\/p>\n<ul>\n<li class=\"xxelementtoproof\">Additional sanitary sewer lining work will take place in December on 11<sup>th<\/sup> Avenue, south of 1<sup>st<\/sup> Street N.<\/li>\n<li class=\"xxelementtoproof\">Punch list work may occur this fall and will continue into the spring.<\/li>\n<li class=\"xxelementtoproof\">Sod warranty work will occur in the spring.<\/li>\n<li class=\"xxelementtoproof\">Gas main and gas service work on 12th Avenue N from 3rd Street N to Highway 7 and 13th Avenue N will be completed in the spring of 2026.<\/li>\n<li class=\"xxelementtoproof\">Weekly updates will resume when construction begins in spring 2026.<\/li>\n<\/ul>\n<p>[\/vc_column_text][vc_empty_space height=&#8221;20px&#8221;][vc_column_text css=&#8221;&#8221;]<\/p>\n<h4>November 14, 2025<\/h4>\n<p><strong>Pavement Crosswalk Blocks Next Week<\/strong><\/p>\n<p><u>Week of November 10<\/u><\/p>\n<ul>\n<li>The final layer of asphalt paving on Phase 1E (11th Avenue N between 2nd and 3rd Street N) was completed<\/li>\n<li>Permanent signage installation started<\/li>\n<\/ul>\n<p><u>Week\u00a0of November 17<\/u><\/p>\n<ul>\n<li>Permanent signage installation will be completed<\/li>\n<li>Pavement crosswalk block and striping will be taking place on all year 1 phases<\/li>\n<\/ul>\n<p><u>Additional Notes:<\/u><\/p>\n<p>Sod warranty work will occur in the spring. Gas main and gas service work on 12th Avenue N from 3rd Street N to Highway 7 and 13th Avenue N will be completed in the spring of 2026.[\/vc_column_text][vc_empty_space height=&#8221;20px&#8221;][vc_column_text css=&#8221;&#8221;]<\/p>\n<h4>November 7, 2025<\/h4>\n<p><strong>Final Paving on Phase 1E<\/strong><\/p>\n<p align=\"left\"><u>Week of November 3<\/u><\/p>\n<ul>\n<li>Alleyway patches were poured and will be opened in the morning on Monday, November 10<\/li>\n<li>Tree planting was completed on year 1 phases. The remaining few trees that weren&#8217;t in stock will be planted when next year&#8217;s phases receive their trees. Those homeowners have been notified.<\/li>\n<li>Phase 1D (11th Avenue N from 1st to 2nd Street N)\u00a0and 1E (11th Avenue N from 2<sup>nd<\/sup>\u00a0to 3<sup>rd<\/sup>\u00a0Street N)\u00a0concrete work wrapped up. Any remaining items have been added to the project punch list and will be addressed during construction next year<\/li>\n<li>Phase 1E topsoil was completed<\/li>\n<li>Phase 1E sodding was completed<\/li>\n<\/ul>\n<p align=\"left\"><u>Week\u00a0of November 10<\/u><\/p>\n<ul>\n<li>The final layer of asphalt paving on Phase 1E will occur on Tuesday, November 11. Reminder \u2013 No parking is allowed on the street during paving operations.<\/li>\n<li>Permanent signage for all year 1 phases may be installed later in the week<\/li>\n<\/ul>\n<p>[\/vc_column_text][vc_empty_space height=&#8221;20px&#8221;][vc_column_text css=&#8221;&#8221;]<\/p>\n<h4>October 31, 2025<\/h4>\n<p><strong>Final Paving on Phases 1A, 1B, 1C, 1D, 1F, and 1G<\/strong><\/p>\n<p><u>Week of October 27<\/u><\/p>\n<ul>\n<li>The final layer of asphalt was paved on phases 1A, 1B, 1C, 1D, 1F, and 1G<\/li>\n<li>Tree planting started in year 1 phases<\/li>\n<li>Phase 1D (11th Avenue N from 1st to 2nd Street N) and 1E (11th Avenue N from 2<sup>nd<\/sup>\u00a0to 3<sup>rd<\/sup>\u00a0Street N) pavers and retaining walls were completed<\/li>\n<li>Phase 1D and 1E concrete work continued<\/li>\n<li>CenterPoint\u00a0Energy started work on patching roadways and sidewalks<\/li>\n<\/ul>\n<p><u>Week of November 3<\/u><\/p>\n<ul>\n<li>Alleyway patches are scheduled for this week, properties affected by this work will be notified before the work occurs<\/li>\n<li>Tree Planting will continue on all year 1 phases<\/li>\n<li>Phase 1D and 1E concrete work will continue<\/li>\n<li>Phase 1E topsoil will be finished once the concrete work is complete<\/li>\n<li>Phase 1F (2<sup>nd<\/sup> Street N from 8<sup>th<\/sup> to 12<sup>th<\/sup> Avenue N) spot concrete sidewalk work will occur<\/li>\n<li>Permanent signage for all year 1 phases may be installed<\/li>\n<li>CenterPoint\u00a0Energy will wrap up with their roadway and sidewalk patches<\/li>\n<\/ul>\n<p><u>Additional Notes:<\/u><\/p>\n<p>The final layer of asphalt paving on the Phase 1E is tentatively scheduled for the week of November 10. Sod warranty work will occur in the spring. Gas main and gas service work on 12th Avenue N from 3rd Street N to Highway 7 and 13th Avenue N will be completed in the spring of 2026.[\/vc_column_text][vc_empty_space height=&#8221;20px&#8221;][vc_column_text css=&#8221;&#8221;]<\/p>\n<h4>October 24, 2025<\/h4>\n<p><strong>Final Paving on all Roads East of 11th Avenue N.<\/strong><\/p>\n<p><u>Week of October 20<\/u><\/p>\n<ul>\n<li>Phase 1A (9th Avenue N from 1st to 3rd Street N) and 1B (10th Avenue N from 1st to 3rd Street N) sod touch-up work was completed<\/li>\n<li>Phase 1C (10<sup>th<\/sup>\u00a0Avenue N between 3<sup>rd<\/sup>\u00a0and 4<sup>th<\/sup>\u00a0Street\u00a0and 4<sup>th<\/sup>\u00a0Street\u00a0between 9<sup>th<\/sup>\u00a0and 10<sup>th<\/sup>\u00a0Avenue)\u00a0sod was completed<\/li>\n<li>Phase 1D (11th Avenue N from 1st to 2nd Street N) sod was installed\n<ul>\n<li>Phase 1D manholes and gate valves were raised in the road to the finished grade<\/li>\n<\/ul>\n<\/li>\n<li>Phase 1E (11th Avenue N from 2<sup>nd<\/sup>\u00a0to 3<sup>rd<\/sup>\u00a0Street N) and 1G (3<sup>rd<\/sup>\u00a0Street N from 9<sup>th<\/sup>\u00a0to 11<sup>th<\/sup>\u00a0Avenue N)\u00a0topsoil placement started<\/li>\n<li>Phase 1F (2<sup>nd<\/sup>\u00a0Street N from 8<sup>th<\/sup>\u00a0to 12<sup>th<\/sup>\u00a0Avenue N) roadway milling occurred\u00a0and street patches were filled<\/li>\n<li>Phase 1G (3<sup>rd<\/sup>\u00a0Street N from 9<sup>th<\/sup>\u00a0to 11<sup>th<\/sup>\u00a0Avenue N) sod was installed<\/li>\n<li>CenterPoint\u00a0Energy worked on replacing gas services on 12<sup>th<\/sup>\u00a0Avenue N from 1<sup>st<\/sup>\u00a0to 3<sup>rd<\/sup> Street N.<\/li>\n<li>Xcel Energy reinstalled light poles on both 10<sup>th<\/sup>\u00a0and 11<sup>th<\/sup>\u00a0Avenue N<\/li>\n<\/ul>\n<p><u>Week of October 27<\/u><\/p>\n<ul>\n<li>The final layer of asphalt paving on all streets east of 11<sup>th<\/sup>\u00a0Avenue N is scheduled to occur on Monday, October 27 weather depending. This includes all of Phases 1A, 1B, 1C, 1G, and 1F. During paving, on-street parking won\u2019t be allowed in the areas they will be paving. No parking signs will be installed prior or the paving dates. Once the final layer of asphalt has been rolled and compacted cars are able to access the road. We ask that you try to minimize abrupt turning of the cars wheels if you see the roadway was compacted very recently.<\/li>\n<li>Alleyway patches may be poured this week, properties affected by this work will be notified<\/li>\n<li>Tree Planting will start on all year 1 phases<\/li>\n<li>Phase 1D and 1E concrete work should be wrapped up<\/li>\n<li>Phase 1F spot concrete sidewalk work may occur<\/li>\n<li>CenterPoint\u00a0Energy will continue\u00a0with their gas work and will be continuing with installing services along 12<sup>th<\/sup>\u00a0Avenue N<\/li>\n<\/ul>\n<p><strong>Note:<\/strong> The final layer of asphalt paving on the Phase 1E and potentially 1D if that doesn\u2019t get paved on October 27<sup>th<\/sup>, will occur the following week. Sod warranty work will occur in the spring. Gas main and gas service work on 12th Avenue N from 3rd Street N to Highway 7 and 13th Avenue N will be completed in the spring of 2026.[\/vc_column_text][vc_empty_space height=&#8221;20px&#8221;][vc_column_text css=&#8221;&#8221;]<\/p>\n<h4>October 17, 2025<\/h4>\n<p><strong>Roadway Milling on Phase 1F<\/strong><\/p>\n<p><u>Week of October 13<\/u><\/p>\n<ul>\n<li>Phase 1E (11th Avenue N from 2<sup>nd<\/sup>\u00a0to 3<sup>rd<\/sup>\u00a0Street N) and 1G (3<sup>rd<\/sup>\u00a0Street N from 9<sup>th<\/sup>\u00a0to 11<sup>th<\/sup>\u00a0Avenue N)\u00a0driveway tie-ins were completed and sidewalk work started and is close to being completed<\/li>\n<li>Phase 1F (2<sup>nd<\/sup>\u00a0Street N from 8<sup>th<\/sup>\u00a0to 12<sup>th<\/sup>\u00a0Avenue N) spot concrete curb was completed along with the northern alley entrance between 9<sup>th<\/sup>\u00a0and 10<sup>th<\/sup>\u00a0Avenue N.<\/li>\n<li>Centerpoint\u00a0Energy completed their gas main replacement work on 11<sup>th<\/sup>\u00a0Avenue N from 4<sup>th<\/sup>\u00a0Street N to Minnetonka Mills Road and on 12<sup>th<\/sup>\u00a0Avenue N from 1<sup>st<\/sup>\u00a0Street N to 3<sup>rd<\/sup>\u00a0Street N<\/li>\n<\/ul>\n<p><u>Week of October 20<\/u><\/p>\n<ul>\n<li>Alleyway patches may be poured this week, properties affected by this work will be notified<\/li>\n<li>Work will continue on punch-list items in Phases 1A, 1B, and 1C<\/li>\n<li>Phase 1A (9th Avenue N from 1st to 3rd Street N) and 1B (10th Avenue N from 1st to 3rd Street N) sod touch-up work will occur<\/li>\n<li>Phase 1C (10<sup>th<\/sup>\u00a0Avenue N between 3<sup>rd<\/sup>\u00a0and 4<sup>th<\/sup>\u00a0Street\u00a0and 4<sup>th<\/sup>\u00a0Street\u00a0between 9<sup>th<\/sup>\u00a0and 10<sup>th<\/sup>\u00a0Avenue)\u00a0sod will be completed<\/li>\n<li>Phase 1D (11th Avenue N from 1st to 2nd Street N) sod will be installed<\/li>\n<li>Phase 1E concrete sidewalk work may be completed and topsoil will be placed<\/li>\n<li>Phase 1F spot concrete sidewalk work may occur<\/li>\n<li>Phase 1F roadway milling (removing the top 2 inches of asphalt pavement) will occur on Wednesday, October 22<\/li>\n<li>Centerpoint Energy will continue with their gas work and will be working on installing services along the roads where they just installed the new gas main<\/li>\n<\/ul>\n<p class=\"xxmsonormal\" style=\"margin: 0in;background: white\"><span style=\"font-size: 11.0pt;color: black\"><strong>Note:<\/strong> The final layer of asphalt paving on all streets east of and including 10<sup>th<\/sup>\u00a0Avenue N is tentatively scheduled to occur on Monday, October 27. This includes all of Phases 1A, 1B, 1C, along with half of phases 1G and 1F. During paving, on-street parking won\u2019t be allowed in the areas they will be paving. No parking signs will be installed prior or the paving dates. Gas main and gas service work on 12th Avenue N from 3rd Street N to Highway 7 and 13th Avenue N will be completed in the spring of 2026.<\/span><\/p>\n<p>[\/vc_column_text][vc_empty_space height=&#8221;20px&#8221;][vc_column_text css=&#8221;&#8221;]<\/p>\n<h4>October 10, 2025<\/h4>\n<p><strong>Sidewalks on Phase 1E<\/strong><\/p>\n<p><u>Week of October 6<\/u><\/p>\n<ul>\n<li>Phase 1C (10<sup>th<\/sup>\u00a0Avenue N between 3<sup>rd<\/sup>\u00a0and 4<sup>th<\/sup>\u00a0Street\u00a0and 4<sup>th<\/sup>\u00a0Street\u00a0between 9<sup>th<\/sup>\u00a0and 10<sup>th<\/sup>\u00a0Avenue)\u00a0and 1D (11th Avenue N between 1<sup>st<\/sup>\u00a0and 2<sup>nd<\/sup>\u00a0Street N)\u00a0irrigation was completed<\/li>\n<li>Phase 1E (11th Avenue N from 2<sup>nd<\/sup>\u00a0to 3<sup>rd<\/sup>\u00a0Street N) and 1G (3<sup>rd<\/sup>\u00a0Street N from 9<sup>th<\/sup>\u00a0to 11<sup>th<\/sup>\u00a0Avenue N)\u00a0roadway paving was completed<\/li>\n<\/ul>\n<p><u>Week of October 13<\/u><\/p>\n<ul>\n<li>Alleyway patches may be poured this week, properties affected by this work will be notified<\/li>\n<li>Work will continue on concrete punchlist items in Phases 1A and 1B<\/li>\n<li>Phase 1A (9th Avenue N from 1st to 3rd Street N) and 1B (10th Avenue N from 1st to 3rd Street N) sod touch up work will occur<\/li>\n<li>Phase 1C sod will be completed<\/li>\n<li>Phase 1D (11th Avenue N from 1st to 2nd Street N) concrete sidewalk work will wrap up, and sod will be installed<\/li>\n<li>Phase 1E concrete sidewalk work will begin<\/li>\n<li>Phase 1E and 1G driveway tie-ins will be paved<\/li>\n<li>Phase 1F spot concrete work will continue, properties will be notified if their access gets restricted due to any of these spot patches<\/li>\n<li>Centerpoint Energy will have their contractor, Michels Corporation, start gas main replacement work on 11<sup>th<\/sup>\u00a0Avenue N from 4<sup>th<\/sup>\u00a0Street N to Minnetonka Mills Road and then start work on 12th Avenue N at 1st Street N, working north from there. As timing and weather allows, they will finish 12<sup>th<\/sup>\u00a0Avenue N to Highway 7 and continue onto 13<sup>th<\/sup>\u00a0Avenue N. Regardless of if this work is completed this fall, work will still be done in the spring of 2026 to connect services and finish any remaining gas main work.<\/li>\n<\/ul>\n<p>[\/vc_column_text][vc_empty_space height=&#8221;20px&#8221;][vc_column_text css=&#8221;&#8221;]<\/p>\n<h4>October 3, 2025<\/h4>\n<p><strong>Paving on Phase 1E and 1G<\/strong><\/p>\n<p><u>Week of September 29<\/u><\/p>\n<ul>\n<li>Concrete punch list work started on Phase 1A and 1B (9th Avenue N between 1<sup>st<\/sup>\u00a0and 3<sup>rd<\/sup>\u00a0Street and 10<sup>th<\/sup>\u00a0Avenue N between 1<sup>st<\/sup>\u00a0and 3<sup>rd<\/sup>\u00a0Street)<\/li>\n<li>Phase 1C (10<sup>th<\/sup>\u00a0Avenue N between 3<sup>rd<\/sup>\u00a0and 4<sup>th<\/sup>\u00a0Street\u00a0and 4<sup>th<\/sup>\u00a0Street\u00a0between 9<sup>th<\/sup>\u00a0and 10<sup>th<\/sup>\u00a0Avenue) sod was installed<\/li>\n<li>Phase 1D (11th Avenue N between 1<sup>st<\/sup>\u00a0and 2<sup>nd<\/sup>\u00a0Street N) sidewalk work continued and topsoil was added<\/li>\n<li>Phase 1C and 1D irrigation work started<\/li>\n<li>Phase 1E (11th\u00a0Avenue N between 2nd\u00a0and 3rd\u00a0Street N) final roadway grading was completed<\/li>\n<li>Phase 1E driveway aprons were poured and will open on Monday<\/li>\n<li>Phase 1G (3<sup>rd<\/sup>\u00a0Street N from 9<sup>th<\/sup>\u00a0to 11<sup>th<\/sup>\u00a0Avenue N)\u00a0final roadway grading was completed<\/li>\n<li>Phase 1G alley ways aprons have been opened, and the driveways will open on Monday<\/li>\n<li>Phase 1F (2<sup>nd<\/sup>\u00a0Street N from 8<sup>th<\/sup>\u00a0to 12<sup>th<\/sup>\u00a0Avenue N) spot concrete work started which included pouring a few of the alley way entrances<\/li>\n<\/ul>\n<p><u>Week of October 6<\/u><\/p>\n<ul>\n<li>Alleyway patches may be poured this week, properties affected by this work will be notified.<\/li>\n<li>Concrete punch list work on Phase 1A and 1B will continue<\/li>\n<li>Phase 1A and 1B sod touch up work will occur<\/li>\n<li>Phase 1D concrete sidewalk work will wrap up, and sod will be installed<\/li>\n<li>Phase 1E concrete sidewalk work may start<\/li>\n<li>Phase 1E and 1G roadway paving will occur along with driveway tie-ins<\/li>\n<li>Phase 1F spot concrete work will continue, properties will be notified if their access gets restricted due to any of these spot patches.<\/li>\n<\/ul>\n<p>Note: The week of October 13, Centerpoint Energy plans on having their contractor, Michels Corporation, continue gas main replacement work on 11<sup>th<\/sup> Avenue N from 4<sup>th<\/sup> Street N to Minnetonka Mills Road. As weather allows, they will then start gas main replacement work on 12<sup>th<\/sup> and 13<sup>th<\/sup> Avenue N.[\/vc_column_text][vc_empty_space height=&#8221;20px&#8221;][vc_column_text css=&#8221;&#8221;]<\/p>\n<h4>September 26, 2025<\/h4>\n<p><strong>Sod Being Placed in Phase 1C<\/strong><\/p>\n<p><u>Week of September 22<\/u><\/p>\n<ul>\n<li>The alley off 9<sup>th<\/sup>\u00a0Avenue N on Phase 1A (9th Avenue N between 1<sup>st<\/sup>\u00a0and 2<sup>nd<\/sup>\u00a0Street N) was poured and will open soon<\/li>\n<li>Phase 1C (10<sup>th<\/sup>\u00a0Avenue N between 3<sup>rd<\/sup>\u00a0and 4<sup>th<\/sup>\u00a0Street\u00a0and 4<sup>th<\/sup>\u00a0Street\u00a0between 9<sup>th<\/sup>\u00a0and 10<sup>th<\/sup>\u00a0Avenue) boulevard grading occurred, and topsoil was placed<\/li>\n<li>Phase 1D (11th Avenue N between 1<sup>st<\/sup>\u00a0and 2<sup>nd<\/sup>\u00a0Street N) sidewalk work began<\/li>\n<li>Pouring for driveway aprons began on Phase 1E (11th\u00a0Avenue N between 2nd\u00a0and 3rd\u00a0Street N)<\/li>\n<li>Phase 1G (3<sup>rd<\/sup>\u00a0Street N from 9<sup>th<\/sup>\u00a0to 11<sup>th<\/sup>\u00a0Avenue N)\u00a0roadway grading was completed<\/li>\n<li>Phase 1G alley way aprons were poured and should be opened sometime early to mid-next week<\/li>\n<li>Phase 1E and 1G curb and gutter was poured<\/li>\n<\/ul>\n<p><u>Week of September 29<\/u><\/p>\n<ul>\n<li>Alleyway patches may be poured later in the week. Affected properties will be notified.<\/li>\n<li>Phase 1A and 1B (9th Avenue N between 1<sup>st<\/sup>\u00a0and 3<sup>rd<\/sup>\u00a0Street and 10<sup>th<\/sup>\u00a0Avenue N between 1<sup>st<\/sup>\u00a0and 3<sup>rd<\/sup>\u00a0Street) topsoil touch up work will occur along with sod touch ups<\/li>\n<li>Phase 1C sod will be installed and potentially Phase 1D after sidewalk work is completed<\/li>\n<li>Phase 1C and 1D irrigation work may occur sometime this week<\/li>\n<li>Phase 1E and 1G driveway aprons will be finished early in the week and final grading will occur later in the week in preparation for paving the following week<\/li>\n<li>Phase 1F (2<sup>nd<\/sup>\u00a0Street N from 8<sup>th<\/sup>\u00a0to 12<sup>th<\/sup>\u00a0Avenue N) spot concrete removal work may occur<\/li>\n<\/ul>\n<p>[\/vc_column_text][vc_empty_space height=&#8221;20px&#8221;][vc_column_text css=&#8221;&#8221;]<\/p>\n<h4>September 19, 2025<\/h4>\n<p><u>Week of September 15<\/u><\/p>\n<ul>\n<li>Patches of alleyways between 8<sup>th<\/sup>\u00a0and 9<sup>th<\/sup>\u00a0Avenue N as\u00a0well as 9<sup>th<\/sup>\u00a0and 10<sup>th<\/sup>\u00a0Avenue N were removed<\/li>\n<li>Phase 1D (11<sup>th<\/sup>\u00a0Avenue N between 1<sup>st<\/sup>\u00a0and 2<sup>nd <\/sup>Street)\u00a0roadway final grading was completed and was paved<\/li>\n<li>Phase 1D sidewalks were graded<\/li>\n<li>Phase 1E (11<sup>th<\/sup>\u00a0Avenue N between 2<sup>nd<\/sup>\u00a0and 3<sup>rd<\/sup>\u00a0Street) roadway grading was completed<\/li>\n<li>Phase 1F (2<sup>nd<\/sup>\u00a0Street\u00a0from 8<sup>th<\/sup>\u00a0to 12<sup>th<\/sup>\u00a0Avenue) storm sewer was completed<\/li>\n<li>Phase 1G (3<sup>rd<\/sup>\u00a0Street\u00a0from 9<sup>th<\/sup>\u00a0Avenue N to 11<sup>th<\/sup>\u00a0Avenue N) storm sewer was completed<\/li>\n<li>Phase 1G roadway grading was started<\/li>\n<li>Sanitary sewer lining work was completed on 9<sup>th<\/sup>\u00a0Avenue N, 2<sup>nd<\/sup>\u00a0Street N, and 3<sup>rd<\/sup>\u00a0Street N<\/li>\n<\/ul>\n<p><u>Week of September 22<\/u><\/p>\n<ul>\n<li>Alleyway patches will be poured later in the week, affected properties will be notified.<\/li>\n<li>Phase 1A and 1B (9th Avenue N between 1<sup>st<\/sup>\u00a0and 3<sup>rd<\/sup>\u00a0Street and 10<sup>th<\/sup>\u00a0Avenue N between 1<sup>st<\/sup>\u00a0and 3<sup>rd<\/sup>\u00a0Street) topsoil touch up work will occur<\/li>\n<li>The alley west of 9<sup>th<\/sup>\u00a0Avenue N on Phase 1A may get poured this week<\/li>\n<li>Phase 1C (10<sup>th<\/sup>\u00a0Avenue N between 3<sup>rd<\/sup>\u00a0and 4<sup>th<\/sup>\u00a0Street\u00a0and 4<sup>th<\/sup>\u00a0Street\u00a0between 9<sup>th<\/sup>\u00a0and 10<sup>th<\/sup>\u00a0Avenue) boulevard grading\u00a0will start later in the week, and topsoil will be installed after<\/li>\n<li>Phase 1D sidewalks will begin to be poured<\/li>\n<li>Phase 1E curb will be poured<\/li>\n<li>Phase 1G roadway grading will wrap up early in the week<\/li>\n<\/ul>\n<p>[\/vc_column_text][vc_empty_space height=&#8221;20px&#8221;][vc_column_text css=&#8221;&#8221;]<\/p>\n<h4>September 12, 2025<\/h4>\n<p><strong>Paving on Phase 1D<\/strong><\/p>\n<p><u>Week of September 8<\/u><\/p>\n<ul>\n<li>Phase 1C (10<sup>th<\/sup>\u00a0Avenue N between 3<sup>rd<\/sup>\u00a0and 4<sup>th<\/sup>\u00a0Street\u00a0and 4<sup>th<\/sup>\u00a0Street\u00a0between 9<sup>th<\/sup>\u00a0and 10<sup>th<\/sup>\u00a0Avenue) concrete sidewalk work was completed<\/li>\n<li>Phase 1D (11<sup>th<\/sup>\u00a0Avenue N between 1<sup>st<\/sup>\u00a0and 2<sup>nd<\/sup>Street) curb was poured<\/li>\n<li>Phase 1E (11<sup>th<\/sup>\u00a0Avenue N between 2<sup>nd<\/sup>\u00a0and 3<sup>rd<\/sup>\u00a0Street) utility work wrapped up<\/li>\n<li>Phase 1E houses were taken off the temporary water system<\/li>\n<li>Phase 1F (2<sup>nd<\/sup>\u00a0Street\u00a0from 8<sup>th<\/sup>\u00a0to 12<sup>th<\/sup>\u00a0Avenue) storm sewer was completed<\/li>\n<li>Phase 1G (3<sup>rd<\/sup>\u00a0Street\u00a0from 9<sup>th<\/sup>\u00a0Avenue N to 11<sup>th<\/sup>\u00a0Avenue N) removals occurred and storm sewer work started<\/li>\n<\/ul>\n<p><u>Week of September 15<\/u><\/p>\n<ul>\n<li>The alley west of 9<sup>th<\/sup>\u00a0Avenue N on Phase 1A may get poured late week depending on other concrete work getting completed<\/li>\n<li>Phase 1C boulevard grading\u00a0will start later in the week, and topsoil will be installed after<\/li>\n<li>Phase 1D roadway final grading will occur, paving will follow<\/li>\n<li>Phase 1E roadway grading may occur later in the week<\/li>\n<li>Phase 1G storm sewer will wrap up<\/li>\n<li>Phase 1G roadway grading may occur later in the week<\/li>\n<\/ul>\n<p>[\/vc_column_text][vc_empty_space height=&#8221;20px&#8221;][vc_column_text css=&#8221;&#8221;]<\/p>\n<h4>September 5, 2025<\/h4>\n<p><strong>Utility Work on Phase 1E Wrapping Up<\/strong><\/p>\n<p><u>Week of September 1<\/u><\/p>\n<ul>\n<li>Manhole castings and gate valves were raised to final grade on multiple early phases<\/li>\n<li>Phase 1C (10<sup>th<\/sup>\u00a0Avenue N between 3<sup>rd<\/sup>\u00a0and 4<sup>th<\/sup>\u00a0Street and 4<sup>th<\/sup>\u00a0Street between 9<sup>th<\/sup>\u00a0and 10<sup>th<\/sup>\u00a0Avenue) concrete sidewalk work began<\/li>\n<li>Phase 1E (11<sup>th<\/sup>\u00a0Avenue N between 2<sup>nd<\/sup>\u00a0and 3<sup>rd<\/sup> Street) utility work continued<\/li>\n<\/ul>\n<p><u>Week of September 8<\/u><\/p>\n<ul>\n<li>The alley west of 9<sup>th<\/sup> Avenue N on Phase 1A may get poured late in the week, depending on other concrete work getting completed<\/li>\n<li>Phase 1C concrete sidewalk work will wrap up<\/li>\n<li>Phase 1C boulevard grading will start later in the week, and topsoil will be installed after<\/li>\n<li>Phase 1D (11th Avenue N) curb may get poured this week depending on other concrete work getting completed, residents will be notified accordingly<\/li>\n<li>Phase 1F (2<sup>nd<\/sup>\u00a0Street from 8<sup>th<\/sup>\u00a0to 12<sup>th<\/sup> Avenue) storm sewer will be installed<\/li>\n<li>Phase 1E utility work should be wrapping up including services to individual properties and storm sewer<\/li>\n<li>Phase 1G (3<sup>rd<\/sup>\u00a0Street from 9<sup>th<\/sup>\u00a0Avenue N to 11<sup>th<\/sup>\u00a0Avenue N) storm sewer will be installed<\/li>\n<li>Phase 1G removals may occur, residents affected by any alley access restrictions will be notified accordingly<\/li>\n<\/ul>\n<p>[\/vc_column_text][vc_empty_space height=&#8221;20px&#8221;][vc_column_text css=&#8221;&#8221;]<\/p>\n<h4>August 29, 2025<\/h4>\n<p><strong>No Work Scheduled for Holiday Weekend<\/strong><\/p>\n<p><u>Week of August 25<\/u><\/p>\n<ul>\n<li>The alley west of 9<sup>th<\/sup> Avenue N on Phase 1A (9<sup>th<\/sup> Avenue N) was removed and graded in preparation for concrete placement<\/li>\n<li>Manhole castings and gate valves were raised to final grade on multiple early phases<\/li>\n<li>Phase 1D (11<sup>th<\/sup> Avenue N between 1<sup>st<\/sup> and 2<sup>nd<\/sup> Street) roadway grading finished up in preparation for curbing<\/li>\n<li>Phase 1E (11<sup>th<\/sup> Avenue N between 2<sup>nd<\/sup> and 3<sup>rd<\/sup> Street) utility work began, including a scheduled water shutdown that affected multiple adjacent residential properties<\/li>\n<li>Phase 1G (3<sup>rd<\/sup> Street from 9<sup>th<\/sup> Avenue N to 11<sup>th<\/sup> Avenue N) was planned to start this week but now has been rescheduled, affected residents will be notified accordingly<\/li>\n<li>The pedestrian flasher system at 11<sup>th<\/sup> Avenue S just north of Landmark Trail N was installed<\/li>\n<li>There will <strong><u>NOT<\/u> <\/strong>be any scheduled work planned over the Labor Day holiday weekend. However, project contacts will be available to respond in case of any major issues\/emergencies<\/li>\n<\/ul>\n<p><u>Week of September 01<\/u><\/p>\n<ul>\n<li>The alley west of 9<sup>th<\/sup> Avenue N on Phase 1A may get poured late week depending on other concrete work getting completed<\/li>\n<li>Phase 1C concrete sidewalk work is scheduled to start early next week after Labor Day<\/li>\n<li>Phase 1D curb may get poured late week depending on other concrete work getting completed, residents will be notified accordingly<\/li>\n<li>Phase 1E utility work will continue including watermain installation as well as services to individual properties<\/li>\n<li>Phase 1G removals may occur next week, residents affected by any alley access restrictions will be notified accordingly<\/li>\n<\/ul>\n<p>[\/vc_column_text][vc_empty_space height=&#8221;20px&#8221;][vc_column_text css=&#8221;&#8221;]<\/p>\n<h4>August 22, 2025<\/h4>\n<p><strong>The Intersection of 5<sup>th<\/sup> Avenue N and Minnetonka Mills Road Has Been Reopened<\/strong><\/p>\n<p><u>Week of August 18<\/u><\/p>\n<ul>\n<li>Manhole castings and gate valves were raised to final grade on multiple early phases<\/li>\n<li>With the school year starting soon, the intersection of 9<sup>th<\/sup> Avenue N and 4<sup>th<\/sup> Street N was paved with final layer of asphalt, and the decorative crosswalk was painted.<\/li>\n<li>Phase 1C (10<sup>th<\/sup> Avenue N and 4<sup>th<\/sup> Street N) sidewalk grading and topsoil placement continued progressing<\/li>\n<li>Utility work finished up on Phase 1D (11<sup>th<\/sup> Avenue between 1<sup>st<\/sup> Street N &amp; 2<sup>nd<\/sup> Street N)<\/li>\n<li>Houses on Phase 1E (11<sup>th<\/sup> Avenue between 2<sup>nd<\/sup> Street N &amp; 3<sup>rd<\/sup> Street N) were connected to the temporary water system<\/li>\n<li>To complete the pedestrian crossing improvements at 11<sup>th<\/sup> Avenue S and Landmark Trail, a closure and detour of 11<sup>th<\/sup> Avenue S started Monday, August 18 and has reopened today, August 22, after roadway striping was completed.\n<ul>\n<li>Flashing pedestrian crossing units will be installed in the near future, which will help to alert vehicular traffic of pedestrians trying to cross over 11<sup>th<\/sup> Avenue S.<\/li>\n<\/ul>\n<\/li>\n<li>The work at the intersection of 5<sup>th<\/sup> Avenue N and Minnetonka Mills Road to change the old signalized intersection into a four-way stop was completed and has reopened today, Friday August 22 after roadway striping was completed.<\/li>\n<\/ul>\n<p><u>Week of August 25<\/u><\/p>\n<ul>\n<li>Phase 1C sidewalk grading will continue<\/li>\n<li>Phase 1D roadway grading will begin early next week<\/li>\n<li>Phase 1E utility work will begin<\/li>\n<li>A water shutdown will occur on Monday, August 25 for some blocks on 11<sup>th<\/sup>\u00a0and 12<sup>th<\/sup>\u00a0Avenue N. Affected properties have been notified<\/li>\n<li>Removals on Phase 1G (3<sup>rd<\/sup> Street from 9<sup>th<\/sup> Avenue N to 11<sup>th<\/sup> Avenue N) removals may occur later in the week<\/li>\n<\/ul>\n<p><em>Thank you for your patience and understanding while 11<sup>th<\/sup> Avenue S and the intersection of 5<sup>th<\/sup> Avenue North and Minnetonka Mills Road were closed and detoured!<\/em>[\/vc_column_text][vc_empty_space height=&#8221;20px&#8221;][vc_column_text css=&#8221;&#8221;]<\/p>\n<h4>August 15, 2025<\/h4>\n<p><b>11<sup>th<\/sup>\u00a0Avenue South Road Closure Starting August 18<\/b><\/p>\n<p><u>Week of August 11<\/u><\/p>\n<ul>\n<li>Phase 1D (11th\u00a0Avenue N between 1st\u00a0and 2nd\u00a0Street\u00a0N) utility work continued<\/li>\n<li>Paver and retaining wall work started on Phases 1A (9<sup>th<\/sup>\u00a0Avenue N from 1<sup>st<\/sup>\u00a0St\u00a0N to 3<sup>rd<\/sup>\u00a0St\u00a0N) and 1B (10<sup>th<\/sup>\u00a0Avenue N from 1<sup>st<\/sup>\u00a0St\u00a0N to 3<sup>rd<\/sup>\u00a0St\u00a0N)<\/li>\n<li>Phase 1C (10<sup>th<\/sup>\u00a0Avenue N and 4<sup>th<\/sup>\u00a0Street\u00a0N) paving occurred<\/li>\n<li>Minnetonka Mills and 5th\u00a0Avenue N construction started to remove the signal system and replace storm sewer, curb and gutter, and concrete pedestrian ramps<\/li>\n<li>Phase 1E (11<sup>th<\/sup>\u00a0Avenue N between 2<sup>nd<\/sup>\u00a0and 3<sup>rd<\/sup>\u00a0Street\u00a0N) removals occurred<\/li>\n<li>Topsoil was added to 4<sup>th<\/sup>\u00a0Street\u00a0N from 9<sup>th<\/sup>\u00a0Avenue N to 10<sup>th<\/sup>\u00a0Avenue N<\/li>\n<\/ul>\n<p><u>Week of August 18<\/u><\/p>\n<ul>\n<li>Final layer of paving will occur on 4<sup>th<\/sup> Street from 9<sup>th<\/sup> Avenue N to 10<sup>th<\/sup> Avenue N<\/li>\n<li>Phase 1D utilities will be wrapping up mid-week<\/li>\n<li>Construction at 5<sup>th<\/sup>\u00a0Avenue N and Minnetonka Mills will continue with asphalt paving, crosswalk striping, and sign installation. The new 4-way stop controlled intersection\u00a0is scheduled to be opened end of day <strong>Friday, August 22<\/strong>.<\/li>\n<li>Grading for sidewalks on Phase 1C will occur<\/li>\n<li>Houses on Phase 1E will be set up to the temporary water system<\/li>\n<li>Phase 1E utility work will start<\/li>\n<li>There will be a full closure on 11<sup>th<\/sup>\u00a0Ave S just north of Landmark Trail N <strong>starting August 18<\/strong>\u00a0due to construction of a new and improved pedestrian flasher system and crosswalk. See attachment for the posted detour and work zone. This work is scheduled to be completed with the road opened by the end of day <strong>Friday, August 22<\/strong>.<\/li>\n<li>A water shutdown will occur for some blocks on 11<sup>th<\/sup>\u00a0and 12<sup>th<\/sup>\u00a0Avenue N. Affected properties will be notified early next week<\/li>\n<\/ul>\n<p>*Please limit parking on roads that have recently received sod if possible so that the water truck can reach all areas of the sod. This currently includes Phases 1A and 1B.[\/vc_column_text][vc_empty_space height=&#8221;20px&#8221;][vc_column_text css=&#8221;&#8221;]<\/p>\n<h4>11th Avenue South Closure and Detour Map<\/h4>\n<p>[\/vc_column_text][vc_single_image image=&#8221;1435&#8243; img_size=&#8221;Large&#8221; onclick=&#8221;img_link_large&#8221; css=&#8221;&#8221;][vc_empty_space height=&#8221;20px&#8221;][vc_column_text css=&#8221;&#8221;]<\/p>\n<h4>August 8, 2025<\/h4>\n<p><strong>Phase 1C Paving Next Week<\/strong><\/p>\n<p><u>Week of August 4<\/u><\/p>\n<ul>\n<li>Majority of Phase 1A (9th\u00a0Avenue North) concrete sidewalks were completed. There will be some replacements of concrete sidewalk and step defects in Phase 1A in the coming weeks.<\/li>\n<li>Majority of sod was completed on Phase 1A<\/li>\n<li>Final pavement grading occurred on Phase 1C (10th Avenue N and 4th Street N)<\/li>\n<li>Asphalt driveway tie backs were completed on Phases 1A, 1B, and 1C<\/li>\n<li>Majority of concrete work on Phase 1B (10th Avenue N between 1st and 3rd Street N) wrapped up<\/li>\n<li>Phase 1D (11th\u00a0Avenue N between 1st\u00a0and 2nd\u00a0Street\u00a0N) utility work continued<\/li>\n<li>The water shutdown was completed for some blocks of 11th Avenue N. The project team appreciates everyone\u2019s cooperation with this shutdown.<\/li>\n<li>Trees were removed on Phase 1E (11th\u00a0Avenue N between 2nd\u00a0Street\u00a0N and 3rd\u00a0Street\u00a0N)<\/li>\n<\/ul>\n<p><u>Week of August 11<\/u><\/p>\n<ul>\n<li>Paver\/retaining wall work will start on phases 1A and 1B<\/li>\n<li>First layer of asphalt on Phase 1C will be paved<\/li>\n<li>Phase 1D utility work will continue<\/li>\n<li>Sod work will start on Phase 1B<\/li>\n<li>Pavement and sidewalk removals on Phase 1E will start August 13<\/li>\n<li>Houses on Phase 1E will be set up to the temporary water system at the end of this week or early the following week<\/li>\n<li>There will be a full closure at 5<span style=\"font-size: 13.3333px\">th<\/span> Avenue N and Minnetonka Mills Road starting August 11 due to construction in the intersection. See <a href=\"https:\/\/clients.bolton-menk.com\/hopkinsavenuesproject\/wp-content\/uploads\/sites\/296\/2025\/08\/Hopkins-Central-Ave_5th-Minnetonka-Mills-Closure-scaled.jpg\">detour map<\/a> (below) for more information.<\/li>\n<\/ul>\n<p>[\/vc_column_text][vc_empty_space height=&#8221;20px&#8221;][vc_column_text css=&#8221;&#8221;]<\/p>\n<h4>5th Avenue N and Minnetonka Mills Road Closure and Detour Map<\/h4>\n<p>[\/vc_column_text][vc_single_image image=&#8221;1432&#8243; img_size=&#8221;Large&#8221; css=&#8221;&#8221;][vc_empty_space height=&#8221;20px&#8221;][vc_column_text css=&#8221;&#8221;]<\/p>\n<h4>August 1, 2025<\/h4>\n<p><strong>Phase 1C Paving Next Week<\/strong><\/p>\n<p><u>Week of July 28<\/u><\/p>\n<ul>\n<li>Majority of Phase 1A (9th\u00a0Avenue North) concrete sidewalks were completed. There will be some replacements of concrete sidewalk and step defects in Phase 1A in the coming weeks.<\/li>\n<li>Concrete work on Phase 1B (10<sup>th<\/sup>\u00a0Avenue N and 3<sup>rd<\/sup>\u00a0Street N) continued<\/li>\n<li>Topsoil was added on Phases 1A and 1B<\/li>\n<li>Phase 1C (10th\u00a0Avenue N and 4th\u00a0Street N) curb and gutter was completed<\/li>\n<li>Phase 1D (11th\u00a0Avenue N between 1st\u00a0and 2nd\u00a0Street N) utility work continued<\/li>\n<li>The intersection of 11<sup>th<\/sup>\u00a0Ave N\/1<sup>st<\/sup>\u00a0Street N has been reopened<\/li>\n<\/ul>\n<p><u>Week of August 4<\/u><\/p>\n<ul>\n<li>Sod, retaining walls, and asphalt driveway tie backs will start on Phases 1A and 1B<\/li>\n<li>Final pavement grading will occur on Phase 1C<\/li>\n<li>First layer of asphalt on Phase 1C will be getting paved<\/li>\n<li>Concrete sidewalk pouring on Phase 1B should wrap up<\/li>\n<li>Phase 1D utility work will continue with the sanitary sewer work wrapping up<\/li>\n<li>A water shutdown that will affect some blocks of 11th Ave N will occur on 8\/04, affected properties have been notified<\/li>\n<li>Tree removals will occur on Phase 1E (11th\u00a0Avenue N between 2nd\u00a0Street N and 3rd\u00a0Street N)<\/li>\n<\/ul>\n<p><u>Reminder to properties on 11th\u00a0Ave N and surrounding streets:<\/u><\/p>\n<p>During Phase 1A sanitary sewer work, 11th\u00a0Ave N (between 1st\u00a0Street N &amp; 2nd\u00a0Street N) will be closed with some trenches left open overnight due to the depth of the sewer main. Any open trench left overnight will be safely contained and blocked\/barricaded off[\/vc_column_text][vc_empty_space height=&#8221;20px&#8221;][vc_column_text css=&#8221;&#8221;]<\/p>\n<h4>July 25, 2025<\/h4>\n<p><strong>11th Ave &amp; 1st Street Reopens Next Week<\/strong><\/p>\n<p><u>Week of 7\/21\/25<\/u><\/p>\n<ul>\n<li>Majority of Phase 1A (9th Avenue N) concrete sidewalks were completed. There will however be some replacements of some Phase 1A concrete sidewalk and step defects that will occur the Week of July 28.<\/li>\n<li>Concrete sidewalk pouring continued on Phase 1B (10thAvenue N and 3rd Street N)<\/li>\n<li>Roadway grading was completed on Phase 1C (10th Avenue N and 4th Street N)<\/li>\n<li>Utility work started on Phase 1D (11th Avenue N between 1st and 2nd Street N)<\/li>\n<li>The water shutdown on 11th Ave N south of 1st Street N was completed. The project team appreciates everyone\u2019s cooperation with this after-hours shutdown.<\/li>\n<\/ul>\n<p><span style=\"text-decoration: underline\">Week of 7\/28\/25<\/span><\/p>\n<ul>\n<li>Remaining Phase 1A concrete work will wrap up<\/li>\n<li>Preparation work for Phase 1A yards and boulevards will occur. Irrigation repairs and topsoil placement to follow<\/li>\n<li>Preparation work for Phase 1B yards and boulevards will occur following Phase 1A work. Irrigation repairs and topsoil placement to follow<\/li>\n<li>Retaining wall work on Phase 1A and 1B will occur<\/li>\n<li>Asphalt driveway tie backs on Phase 1A and 1B will occur<\/li>\n<li>Concrete sidewalk pouring on Phase 1B should wrap up<\/li>\n<li>Phase 1C curb and gutter placement may occur around the middle of the week, affected properties will be notified in advance<\/li>\n<li>Phase 1D utility work will continue<\/li>\n<li>The intersection of 11th Ave N\/1st Street N is planned to be reopened on Tuesday, 7\/29<\/li>\n<li>A water shutdown that will affect some blocks of 11th Ave N will occur, affected properties will be notified beforehand<\/li>\n<li>Tree removals will occur on Phase 1E (11th Avenue N between 2nd Street N and 3rd Street N)<\/li>\n<\/ul>\n<p>The city\u2019s contractor RL Larson has provided confirmation that the first flex phase (Phase 1E) will be the only flex phase to be completed in 2025. Phase 2A will be the first phase started in Spring of 2026.[\/vc_column_text][vc_empty_space height=&#8221;20px&#8221;][vc_column_text css=&#8221;&#8221;]<\/p>\n<h4>July 18, 2025<\/h4>\n<p><strong>Phase 1D Utility Work Starts Next Week<\/strong><\/p>\n<p><u>Week of 7\/14\/25<\/u><\/p>\n<ul>\n<li>Majority of Phase 1A (9<sup>th<\/sup> Avenue N) concrete sidewalks were completed. There will be some replacements of some Phase 1A concrete sidewalk and step defects that will occur the Week of July 21.<\/li>\n<li>Concrete sidewalk pouring continued on Phase 1B (10<sup>th<\/sup> Avenue N and 3<sup>rd<\/sup> Street N)<\/li>\n<li>Roadway grading work began on Phase 1C (10<sup>th<\/sup> Avenue N and 4<sup>th<\/sup> Street N)<\/li>\n<li>Pavement removals occurred on Phase 1D (11<sup>th<\/sup> Avenue N between 1<sup>st<\/sup> and 2<sup>nd<\/sup> Street N)<\/li>\n<li>Dewatering system was set up on Phase 1D to combat high groundwater levels on Phase 1D. The dewatering wells will be powered by a generator that will need to run 24\/7, audible noise from the running generator should be minor and shouldn\u2019t cause any disturbance.<\/li>\n<li>No scheduled work will be occurring this weekend during Raspberry Festival<\/li>\n<\/ul>\n<p><span style=\"text-decoration: underline\">Week of 7\/21\/25<\/span><\/p>\n<ul>\n<li>Remaining Phase 1A concrete work will wrap up<\/li>\n<li>Preparation work for Phase1A yards and boulevards will occur. Irrigation repairs and topsoil placement to follow<\/li>\n<li>Concrete sidewalk pouring on Phase 1B should wrap up<\/li>\n<li>Roadway grading on Phase 1C will wrap up<\/li>\n<li>Phase 1C curb and gutter placement may occur at the end of the week, affected properties will be notified in advance<\/li>\n<li>Phase 1D temporary water hookups are scheduled to occur on Monday, July 21<\/li>\n<li>Phase 1D utility work will begin\n<ul>\n<li>Starting Monday, July 21, the intersection of 11<sup>th<\/sup> Ave N\/1<sup>st<\/sup> Street N will be closed to complete all the utility work and bring the intersection back up to a gravel surface. This closure is anticipated to be in-place for 1.5-2 weeks (see <u>detour map<\/u> included in this update)<\/li>\n<li>A water shutdown that affects businesses on 11<sup>th<\/sup> Ave N south of 1<sup>st<\/sup> Street N is scheduled for Monday night, starting at 8:30 PM. This late-night work is necessary to avoid impacts during business hours and is expected to be completed Monday night around 11:30 PM. The project team appreciates everyone\u2019s\u2019 understanding and patience with this required after-hours work<\/li>\n<li>As a reminder to properties on 11<sup>th<\/sup> Ave N and surrounding streets, during Phase 1A sanitary sewer work, 11<sup>th<\/sup> Ave N (between 1<sup>st<\/sup> Street N &amp; 2<sup>nd<\/sup> Street N) will be closed with some trenches left open overnight due to the depth of the sewer main. Any open trench left overnight will be safely contained and blocked\/barricaded off.<\/li>\n<\/ul>\n<\/li>\n<\/ul>\n<p>[\/vc_column_text][vc_empty_space height=&#8221;20px&#8221;][vc_column_text css=&#8221;&#8221;]<\/p>\n<h4>1st Street Detour and Phase 1D Closure Map<\/h4>\n<p>[\/vc_column_text][vc_empty_space height=&#8221;20px&#8221;][vc_single_image image=&#8221;1417&#8243; img_size=&#8221;large&#8221; onclick=&#8221;img_link_large&#8221; css=&#8221;&#8221;][vc_empty_space height=&#8221;20px&#8221;][vc_column_text css=&#8221;&#8221;]<\/p>\n<h4>July 11, 2025<\/h4>\n<p><strong>Phase 1D Construction Starts Next Week<\/strong><\/p>\n<p><u>Week of 7\/7\/2025<\/u><\/p>\n<ul>\n<li>Pouring concrete sidewalks and steps continued on Phase 1A (9<sup>th<\/sup> Avenue N)<\/li>\n<li>The first layer of asphalt was paved on Phase 1B (10<sup>th<\/sup> Avenue N)<\/li>\n<li>Grading for concrete sidewalks occurred on Phase 1B<\/li>\n<li>Sidewalk pouring started on phase 1B<\/li>\n<li>Utility work finished on Phase 1C (10<sup>th<\/sup> Avenue N and 4<sup>th<\/sup> Street N)<\/li>\n<li>Houses were taken off the temporary water system on Phase 1C<\/li>\n<li>Temporary water piping was placed on Phase 1D (11<sup>th<\/sup> Avenue N)<\/li>\n<\/ul>\n<ul>\n<li style=\"list-style-type: none\"><\/li>\n<\/ul>\n<p><u>Week of 7\/14\/25<\/u><\/p>\n<ul>\n<li>Pouring remaining concrete sidewalks and steps will wrap up on Phase 1A<\/li>\n<li>Pouring concrete sidewalks will continue on Phase 1B<\/li>\n<li>Road grading will start on Phase 1C<\/li>\n<li>Removals of the old roadway and sidewalks will occur on Phase 1D<\/li>\n<li>Houses will be set up on the temporary water system on phase 1D<\/li>\n<li>A dewatering system including drilling wells will occur on Phase 1D<\/li>\n<\/ul>\n<p><u>Please note the following:<\/u><\/p>\n<ul>\n<li>The intersection of 10<sup>th<\/sup> Avenue N. and 4<sup>th<\/sup> Street N. will be fully closed Friday, July 11 through Sunday, July 13 due to the road conditions and rain expected in the forecast over the weekend.<\/li>\n<\/ul>\n<p>[\/vc_column_text][vc_empty_space height=&#8221;20px&#8221;][vc_column_text css=&#8221;&#8221;]<\/p>\n<h4>July 3, 2025<\/h4>\n<p>[\/vc_column_text]<div class=\"mkd-accordion-holder clearfix mkd-toggle mkd-initial \">\n\t<h5 class=\"clearfix mkd-title-holder\">\n<span class=\"mkd-accordion-mark mkd-left-mark\">\n\t\t<span class=\"mkd-accordion-mark-icon\">\n\t\t\t<span class=\"icon_plus\"><\/span>\n\t\t\t<span class=\"icon_minus-06\"><\/span>\n\t\t<\/span>\n<\/span>\n<span class=\"mkd-tab-title\">\n\t\t<span class=\"mkd-tab-title-inner\">\n\t\tView July 2, 2025 Update\t<\/span>\n<\/span>\n<\/h5>\n<div class=\"mkd-accordion-content\">\n\t<div class=\"mkd-accordion-content-inner\">\n\t\t[vc_column_text css=&#8221;&#8221;]<strong>Phase 1B Paving Next Week<\/strong><\/p>\n<p><u>Week of 6\/30\/25<\/u><\/p>\n<ul>\n<li>Sidewalk grading was completed on phase 1A (9<sup>th<\/sup>\u00a0Avenue N)<\/li>\n<li>Sidewalk pouring began on phase 1A<\/li>\n<li>Remaining phase 1B (10<sup>th<\/sup>\u00a0Avenue N)\u00a0concrete curb was poured<\/li>\n<li>Utility work on phase 1C (10<sup>th<\/sup>\u00a0Avenue N and 4<sup>th<\/sup>Street N) continued<\/li>\n<li>Water shutdowns at 9th Ave N\/4th St N were completed on Wednesday, July 2<\/li>\n<li>Final roadway grading was completed on phase 1B in preparation for paving the first layer of asphalt<\/li>\n<li>Newsletter 3 was mailed out to all residents in the project area<\/li>\n<\/ul>\n<ul>\n<li style=\"list-style-type: none\">\n<ul>\n<li>Due the recent rainy weather, some delays are being encountered with the current phases. The phasing map in Newsletter 3 has been updated accordingly.<\/li>\n<\/ul>\n<\/li>\n<\/ul>\n<ul>\n<li>No work is scheduled to occur on the Independence Day Holiday, Friday July 4. There is also no planned work scheduled for the following holiday weekend.<\/li>\n<\/ul>\n<p><u>Week of 7\/7\/25<\/u><\/p>\n<ul>\n<li>Sidewalk pouring on phase 1A will continue<\/li>\n<li>First layer of asphalt on phase 1B will be getting paved<\/li>\n<li>Sidewalk grading will start on phase 1B<\/li>\n<li>Utility work on phase 1C will continue<\/li>\n<li>Houses will be taken off the temporary water system on phase 1C<\/li>\n<li>Road grading will start on phase 1C<\/li>\n<\/ul>\n<p><u>Please note the following:<\/u><\/p>\n<ul>\n<li>The intersection of 10<sup>th<\/sup>\u00a0Avenue N. and 4<sup>th<\/sup>\u00a0Street N. will be fully closed starting Friday, July 4 until Sunday, July 6 due to the road conditions and with the rain expected in the forecast over the weekend.<\/li>\n<\/ul>\n<p>[\/vc_column_text]\n\t\t\t<\/div>\n<\/div>\n<\/div>[vc_empty_space height=&#8221;20px&#8221;][vc_column_text css=&#8221;&#8221;]<\/p>\n<h4>June 27, 2025<\/h4>\n<p>[\/vc_column_text]<div class=\"mkd-accordion-holder clearfix mkd-toggle mkd-initial \">\n\t<h5 class=\"clearfix mkd-title-holder\">\n<span class=\"mkd-accordion-mark mkd-left-mark\">\n\t\t<span class=\"mkd-accordion-mark-icon\">\n\t\t\t<span class=\"icon_plus\"><\/span>\n\t\t\t<span class=\"icon_minus-06\"><\/span>\n\t\t<\/span>\n<\/span>\n<span class=\"mkd-tab-title\">\n\t\t<span class=\"mkd-tab-title-inner\">\n\t\tView June 27, 2025 Update\t<\/span>\n<\/span>\n<\/h5>\n<div class=\"mkd-accordion-content\">\n\t<div class=\"mkd-accordion-content-inner\">\n\t\t[vc_column_text css=&#8221;&#8221;]<\/p>\n<p class=\"xmsonormal\"><b><span style=\"font-size: 11.0pt\">Phase 1A Sidewalk Construction Begins Next Week<\/span><\/b><\/p>\n<p><span style=\"text-decoration: underline\">Week of 6\/23\/25<\/span><\/p>\n<ul>\n<li>Roadway grading continued on phase 1B (10th Avenue N)<\/li>\n<li>Utility work continued on phase 1C (10th Avenue N and 4th Street N)<\/li>\n<li>Concrete curb work started on phase 1B<\/li>\n<li>Sidewalk grading started on phase 1A (9th Avenue N)<\/li>\n<li>Water shutdown was completed on Monday, June 23<sup>rd<\/sup><\/li>\n<\/ul>\n<p><span style=\"text-decoration: underline\">Week of 6\/30\/25<\/span><\/p>\n<ul>\n<li>Sidewalk grading will continue for phase 1A<\/li>\n<li>Utility work will continue on phase 1C<\/li>\n<li>Residences in phase 1C will be taken off the temporary water system<\/li>\n<li>Concrete curb construction will continue for phase 1B<\/li>\n<li>Sidewalk pouring will occur on phase 1A<\/li>\n<li>Final pavement grading will occur on phase 1B<\/li>\n<\/ul>\n<p><span style=\"text-decoration: underline\">Please Note The Following:<\/span><\/p>\n<ul>\n<li>The intersection of 10<sup>th<\/sup> Avenue N and 4<sup>th<\/sup>Street N will be fully closed this weekend, Saturday June 28<sup>th<\/sup> and Sunday June 29<sup>th<\/sup>,\u00a0due to poor road conditions and rain in the weather forecast.<\/li>\n<\/ul>\n<p>[\/vc_column_text]\n\t\t\t<\/div>\n<\/div>\n<\/div>[vc_empty_space height=&#8221;20px&#8221;][vc_column_text css=&#8221;&#8221;]<\/p>\n<h4>June 20, 2025<\/h4>\n<p>[\/vc_column_text]<div class=\"mkd-accordion-holder clearfix mkd-toggle mkd-initial \">\n\t<h5 class=\"clearfix mkd-title-holder\">\n<span class=\"mkd-accordion-mark mkd-left-mark\">\n\t\t<span class=\"mkd-accordion-mark-icon\">\n\t\t\t<span class=\"icon_plus\"><\/span>\n\t\t\t<span class=\"icon_minus-06\"><\/span>\n\t\t<\/span>\n<\/span>\n<span class=\"mkd-tab-title\">\n\t\t<span class=\"mkd-tab-title-inner\">\n\t\tView June 20, 2025 Update\t<\/span>\n<\/span>\n<\/h5>\n<div class=\"mkd-accordion-content\">\n\t<div class=\"mkd-accordion-content-inner\">\n\t\t[vc_column_text css=&#8221;&#8221;]<strong>Phase 1B Curb Construction Begins Next Week<\/strong><\/p>\n<p><span style=\"text-decoration: underline\">Week of 6\/16\/25<\/span><\/p>\n<ul>\n<li>Roadway grading was started on phase 1B (10th Avenue N and 3rd Street N)<\/li>\n<li>First layer of asphalt was paved on phase 1A (9th Avenue N)<\/li>\n<li>Utility work was completed on Phase 1B<\/li>\n<li>Utility work was started on phase 1C (10th Avenue N and 4th Street N)<\/li>\n<li>Houses on phase 1C were connected to the temporary water system<\/li>\n<li>Houses on phase 1B were taken off the temporary water system<\/li>\n<\/ul>\n<p><span style=\"text-decoration: underline\">Week of 6\/23\/25<\/span><\/p>\n<ul>\n<li>Roadway grading will continue for phase 1B<\/li>\n<li>Utility work will continue on phase 1C<\/li>\n<li>Concrete curb will be poured for phase 1B<\/li>\n<li>Sidewalk grading will occur on phase 1A<\/li>\n<li>Water shutdown will occur on Monday June 23, affected properties have been notified<\/li>\n<\/ul>\n<p>[\/vc_column_text]\n\t\t\t<\/div>\n<\/div>\n<\/div>[vc_empty_space height=&#8221;20px&#8221;][vc_column_text css=&#8221;&#8221;]<\/p>\n<h4>June 13, 2025<\/h4>\n<p>[\/vc_column_text]<div class=\"mkd-accordion-holder clearfix mkd-toggle mkd-initial \">\n\t<h5 class=\"clearfix mkd-title-holder\">\n<span class=\"mkd-accordion-mark mkd-left-mark\">\n\t\t<span class=\"mkd-accordion-mark-icon\">\n\t\t\t<span class=\"icon_plus\"><\/span>\n\t\t\t<span class=\"icon_minus-06\"><\/span>\n\t\t<\/span>\n<\/span>\n<span class=\"mkd-tab-title\">\n\t\t<span class=\"mkd-tab-title-inner\">\n\t\tView June 13, 2025 Update\t<\/span>\n<\/span>\n<\/h5>\n<div class=\"mkd-accordion-content\">\n\t<div class=\"mkd-accordion-content-inner\">\n\t\t[vc_column_text css=&#8221;&#8221;]<strong>Phase 1A Paving Begins Next Week<\/strong><\/p>\n<p><span style=\"text-decoration: underline\">Week of 6\/9\/25<\/span><\/p>\n<ul>\n<li>Project Newsletter #2 sent out to all properties in project area<\/li>\n<li>Concrete curb was poured on Phase 1A (9th Avenue N)<\/li>\n<li>Utility work continued on Phase 1B (10th Avenue N and 3rd Street N)<\/li>\n<li>Temporary water system was installed on Phase 1C (10th Avenue N and 4th Street N)<\/li>\n<li>Pavement removals occurred on Phase 1C<\/li>\n<\/ul>\n<p><span style=\"text-decoration: underline\">Week of 6\/16\/25<\/span><\/p>\n<ul>\n<li>Final roadway grading will occur on Phase 1A<\/li>\n<li>First layer of asphalt will be paved on Phase 1A<\/li>\n<li>Utility work will wrap up on Phase 1B<\/li>\n<li>Roadway grading work will start on Phase 1B<\/li>\n<li>Houses on Phase 1C will be connected to the temporary water system<\/li>\n<li>Utility work will start on Phase 1C<\/li>\n<\/ul>\n<p><span style=\"text-decoration: underline\">Additional Notes:<\/span><\/p>\n<ul>\n<li>With rainy weather in the forecast, please try to avoid\u00a0unpaved streets in the project area<\/li>\n<li>While paving asphalt, the material will be very hot and can cause burns. Please avoid walking pets on the newly paved roadways until the temperatures cool down later in the day.<\/li>\n<\/ul>\n<p>[\/vc_column_text]\n\t\t\t<\/div>\n<\/div>\n<\/div>[vc_empty_space height=&#8221;20px&#8221;][vc_column_text css=&#8221;&#8221;]<\/p>\n<h4>June 6, 2025<\/h4>\n<p>[\/vc_column_text]<div class=\"mkd-accordion-holder clearfix mkd-toggle mkd-initial \">\n\t<h5 class=\"clearfix mkd-title-holder\">\n<span class=\"mkd-accordion-mark mkd-left-mark\">\n\t\t<span class=\"mkd-accordion-mark-icon\">\n\t\t\t<span class=\"icon_plus\"><\/span>\n\t\t\t<span class=\"icon_minus-06\"><\/span>\n\t\t<\/span>\n<\/span>\n<span class=\"mkd-tab-title\">\n\t\t<span class=\"mkd-tab-title-inner\">\n\t\tView June 6, 2025 Update\t<\/span>\n<\/span>\n<\/h5>\n<div class=\"mkd-accordion-content\">\n\t<div class=\"mkd-accordion-content-inner\">\n\t\t[vc_column_text css=&#8221;&#8221;]<strong>Phase 1A Curb and Phase 1C Removals Begin Next Week!<\/strong><\/p>\n<p><span style=\"text-decoration: underline\">Week of 6\/2\/25<\/span><\/p>\n<ul>\n<li>Remaining utility work on Phase 1A was completed<\/li>\n<li>Roadway grading work began on Phase 1A including the installation of the new roadway sand and gravel sections<\/li>\n<li>Utility work continued on Phase 1B<\/li>\n<li>The intersection of 10<sup>th<\/sup> Ave\/1<sup>st<\/sup> Street was closed in order to complete utility work within the intersection\n<ul>\n<li>Detour route was installed during the closure of 10th Ave\/1st Street utilizing 12th Ave, Mainstreet, &amp; 5th Ave<\/li>\n<li>Intersection is planned to be reopened sometime Friday (6\/6) afternoon<\/li>\n<\/ul>\n<\/li>\n<li>A water shutdown that affected multiple businesses along 10<sup>th<\/sup> Ave south of 1<sup>st<\/sup> Street occurred after typical working hours on Wednesday (6\/4)\n<ul>\n<li>The project team would like to thank everybody living near the night work operations for their patience and understanding!<\/li>\n<\/ul>\n<\/li>\n<\/ul>\n<p><span style=\"text-decoration: underline\">Week of 6\/9\/25<\/span><\/p>\n<ul>\n<li>Roadway grading will finish up early in the week on Phase 1A<\/li>\n<li>Concrete curbing and driveway aprons are planned for mid-week on Phase 1A, affected properties will be notified in advance<\/li>\n<li>Utility work will continue on Phase 1B with both utility crews working simultaneously on services and storm sewer<\/li>\n<li>Construction will begin on Phase 1C, including pavement removals and the setting up of the temporary water system<\/li>\n<\/ul>\n<p>[\/vc_column_text]\n\t\t\t<\/div>\n<\/div>\n<\/div>[vc_empty_space height=&#8221;20px&#8221;][vc_column_text css=&#8221;&#8221;]<\/p>\n<h4>May 30, 2025<\/h4>\n<p>[\/vc_column_text]<div class=\"mkd-accordion-holder clearfix mkd-toggle mkd-initial \">\n\t<h5 class=\"clearfix mkd-title-holder\">\n<span class=\"mkd-accordion-mark mkd-left-mark\">\n\t\t<span class=\"mkd-accordion-mark-icon\">\n\t\t\t<span class=\"icon_plus\"><\/span>\n\t\t\t<span class=\"icon_minus-06\"><\/span>\n\t\t<\/span>\n<\/span>\n<span class=\"mkd-tab-title\">\n\t\t<span class=\"mkd-tab-title-inner\">\n\t\tView May 30, 2025 Update\t<\/span>\n<\/span>\n<\/h5>\n<div class=\"mkd-accordion-content\">\n\t<div class=\"mkd-accordion-content-inner\">\n\t\t[vc_column_text css=&#8221;&#8221;]<strong>Closure and Detour for 10th Avenue and 1st Street Planned for Next Week<\/strong><\/p>\n<p><span style=\"text-decoration: underline\">Week of 5\/26\/25<\/span><\/p>\n<ul>\n<li>Utility work continued on both Phase 1A (9<sup>th<\/sup> Avenue N.) &amp; Phase 1B (10<sup>th<\/sup> Avenue N. and 3<sup>rd<\/sup> Street N.)<\/li>\n<li>CenturyLink\u2019s contractor worked on relocating a fiber optic duct bank for the new storm sewer at 9<sup>th<\/sup> Avenue N. &amp; 3<sup>rd<\/sup> Street N.<\/li>\n<\/ul>\n<p><span style=\"text-decoration: underline\">Week of 6\/2\/25<\/span><\/p>\n<ul>\n<li>Utility work will near completion on Phase 1A<\/li>\n<li>Road building work will begin on Phase 1A, which includes grading and installing of the sand and gravel sections<\/li>\n<li>Utility work will continue on Phase 1B<\/li>\n<li><strong>The intersection of 10<sup>th<\/sup> Ave\/1<sup>st<\/sup> Street <\/strong><strong>will be closed<\/strong> to complete utility work in the intersection, see the <a href=\"https:\/\/clients.bolton-menk.com\/hopkinsavenuesproject\/wp-content\/uploads\/sites\/296\/2025\/05\/Hopkins-Central-Ave_1st-St-Detour-Map-scaled.jpg\">1st Street Closure and Detour Map<\/a> below to learn more.\n<ul>\n<li>A detour route will be installed using 12<sup>th<\/sup> Avenue, Mainstreet, &amp; 5<sup>th<\/sup> Avenue<\/li>\n<li>The closure and detour will be in place from Tuesday, June 3<sup>rd<\/sup> to Friday, June 6<sup>th<\/sup><\/li>\n<\/ul>\n<\/li>\n<li>A water shutdown will occur the evening of Wednesday, June 4th that will affect businesses along 10<sup>th<\/sup> Avenue between Mainstreet &amp; 1<sup>st<\/sup> Street. This shutdown will occur after typical working hours to avoid affecting local business operations<\/li>\n<\/ul>\n<p>[\/vc_column_text][vc_single_image img_size=&#8221;large&#8221; css=&#8221;&#8221;]\n\t\t\t<\/div>\n<\/div>\n<\/div>[vc_empty_space height=&#8221;20px&#8221;][vc_column_text css=&#8221;&#8221;]<\/p>\n<h4>May 23, 2025<\/h4>\n<p>[\/vc_column_text]<div class=\"mkd-accordion-holder clearfix mkd-toggle mkd-initial \">\n\t<h5 class=\"clearfix mkd-title-holder\">\n<span class=\"mkd-accordion-mark mkd-left-mark\">\n\t\t<span class=\"mkd-accordion-mark-icon\">\n\t\t\t<span class=\"icon_plus\"><\/span>\n\t\t\t<span class=\"icon_minus-06\"><\/span>\n\t\t<\/span>\n<\/span>\n<span class=\"mkd-tab-title\">\n\t\t<span class=\"mkd-tab-title-inner\">\n\t\tView May 23, 2025 Update\t<\/span>\n<\/span>\n<\/h5>\n<div class=\"mkd-accordion-content\">\n\t<div class=\"mkd-accordion-content-inner\">\n\t\t[vc_column_text css=&#8221;&#8221;]<strong>No Work Over the Holiday Weekend<\/strong><\/p>\n<p><span style=\"text-decoration: underline\">Week of 5\/19\/25<\/span><\/p>\n<ul>\n<li>Centerpoint Energy finished their work on 2025 project streets<\/li>\n<li>Utility work continued on Phase 1A (9th Avenue N)<\/li>\n<li>Phase 1B (10th Avenue N and 3rd Street N) houses were connected to temporary water system<\/li>\n<li>Phase 1B utility work started<\/li>\n<li>Heavy rains impacted the unpaved roadways on both Phase 1A &amp; Phase 1B, temporary road closures were set up to manage vehicular traffic.<\/li>\n<li>The contractor worked to dry out the muddy streets and reopened streets in Phases 1A &amp; 1B. However, please continue to avoid travelling through construction zones if possible<\/li>\n<\/ul>\n<p><span style=\"text-decoration: underline\">Week of 5\/26\/25<\/span><\/p>\n<ul>\n<li>No work is planned for Memorial Day (5\/26), unless any unforeseen issues arise<\/li>\n<li>Utility work will continue on Phases 1A and 1B, including services on the 200 block of Phase 1A and sanitary sewer on Phase 1B<\/li>\n<\/ul>\n<p><strong><u>Please note the following:<\/u><\/strong><\/p>\n<ul>\n<li>Driveway access, sidewalk accessibility and on-street parking will be impacted during the working day (7 a.m. to 7 p.m.) and not readily accessible along Phase 1A (9th Avenue North) and Phase 1B (10<sup>th<\/sup> Avenue North up to 3<sup>rd<\/sup> Street North and 3<sup>rd<\/sup> Street North from 9<sup>th<\/sup> Avenue North to 11<sup>th<\/sup> Avenue North).<\/li>\n<li>Phase 1A intersections at 2<sup>nd<\/sup> Street North and 3<sup>rd<\/sup> Street North will be closed off to thru traffic. The intersection of 9<sup>th<\/sup> Avenue North and 1<sup>st<\/sup> Street North will remain accessible, as well as the alleys along Phase 1A but only from one end typically (refer to the Closure and Access Map).<\/li>\n<li>Phase 1B intersections at 2<sup>nd<\/sup> St North and 3<sup>rd<\/sup> Street North will be closed off to thru traffic. The intersection of 10<sup>th<\/sup> Avenue North and 1<sup>st<\/sup> Street North will be closed periodically for various construction activities including utility work, but a detour will be in place for 1<sup>st<\/sup> Street North traffic when the intersection is closed, directing traffic down to Mainstreet.\n<ul>\n<li>Alleys will remain accessible but only on one end typically, while the other end will be closed. Please refer to the <a href=\"https:\/\/clients.bolton-menk.com\/hopkinsavenuesproject\/wp-content\/uploads\/sites\/296\/2025\/05\/Hopkins-Central-Ave_Alley-Access-Map-scaled.jpg\">Closure and Access Map<\/a> for which direction you should access your alley from for the foreseeable future.<\/li>\n<li>Generally, the alley accesses off 3<sup>rd<\/sup> Street North will be closed during Phase 1B.<\/li>\n<li>The 2<sup>nd<\/sup> Street intersections at 9<sup>th<\/sup> Avenue and 10<sup>th<\/sup> Avenue will not be closed at the same time. If one of these intersections is closed, the other will be open to traffic to maintain access to those alleys while 3<sup>rd<\/sup> Street N is closed.<\/li>\n<\/ul>\n<\/li>\n<li>Please try to avoid work zones for the safety of the contractor and the public. Especially with rain in the forecast, roadway conditions can deteriorate quickly. Please avoid driving through any roads that appear wet and muddy.<\/li>\n<\/ul>\n<p><strong>Closure and Access Map:<\/strong>[\/vc_column_text][vc_single_image img_size=&#8221;large&#8221; css=&#8221;&#8221;]\n\t\t\t<\/div>\n<\/div>\n<\/div>[vc_empty_space height=&#8221;20px&#8221;][vc_column_text css=&#8221;&#8221;]<\/p>\n<h4>May 16, 2025<\/h4>\n<p>[\/vc_column_text]<div class=\"mkd-accordion-holder clearfix mkd-toggle mkd-initial \">\n\t<h5 class=\"clearfix mkd-title-holder\">\n<span class=\"mkd-accordion-mark mkd-left-mark\">\n\t\t<span class=\"mkd-accordion-mark-icon\">\n\t\t\t<span class=\"icon_plus\"><\/span>\n\t\t\t<span class=\"icon_minus-06\"><\/span>\n\t\t<\/span>\n<\/span>\n<span class=\"mkd-tab-title\">\n\t\t<span class=\"mkd-tab-title-inner\">\n\t\tView May 16, 2025 Update\t<\/span>\n<\/span>\n<\/h5>\n<div class=\"mkd-accordion-content\">\n\t<div class=\"mkd-accordion-content-inner\">\n\t\t[vc_column_text css=&#8221;&#8221;]<strong>Phase 1A &amp; 1B Utility Work Next Week<\/strong><\/p>\n<p><span style=\"text-decoration: underline\">Week of 5\/12\/25<\/span><\/p>\n<ul>\n<li>Centerpoint Energy\/Michels continued gas main work<\/li>\n<li>A scheduled water shutdown affecting businesses on 9<sup>th<\/sup> Avenue south of 1<sup>st<\/sup> Street occurred after normal working hours on Monday, May 12.\n<ul>\n<li>The project team would like to thank everyone living near 9<sup>th<\/sup> Avenue and 1<sup>st<\/sup> Street for their patience and understanding during the evening shutdown.<\/li>\n<\/ul>\n<\/li>\n<li>Utility work continued on Phase 1A, with some sanitary sewer mainline replacement on the 200 block of 9<sup>th<\/sup> Ave North and sewer and water service replacements on the 100 block of 9<sup>th<\/sup> Ave North.<\/li>\n<li>Traffic control devices were set up along Phase 1B (10<sup>th<\/sup> Avenue North and 3<sup>rd<\/sup> Street North). Properties on and along Phase 1B should have received a \u201c<a href=\"https:\/\/clients.bolton-menk.com\/hopkinsavenuesproject\/wp-content\/uploads\/sites\/296\/2025\/05\/Hopkins-Central-Ave_Alley-Access-Map-scaled.jpg\">Closure &amp; Access Map<\/a>\u201d to clarify access while phases 1A &amp; 1B are under construction simultaneously.<\/li>\n<li>For safety purposes, a detour of the Regional Trail was installed. This detour will be in place for the foreseeable future. The detour route utilizes 1<sup>st<\/sup> Street North and 14<sup>th<\/sup> Avenue North to avoid the construction zones.<\/li>\n<li>Pavement removals occurred on Phase 1B<\/li>\n<li>Temporary water system was installed on Phase 1B, connections to individual properties will occur starting on Monday, May 19th.<\/li>\n<\/ul>\n<p><span style=\"text-decoration: underline\">Week of 5\/19\/25<\/span><\/p>\n<ul>\n<li>Centerpoint Energy\/Michels should finish gas main work.<\/li>\n<li>Utility work on Phase 1A will continue.<\/li>\n<li>Phase 1B properties will be connected to the temporary water system.<\/li>\n<li>Phase 1B utility work will start.<\/li>\n<\/ul>\n<p>[\/vc_column_text]\n\t\t\t<\/div>\n<\/div>\n<\/div>[vc_empty_space height=&#8221;20px&#8221;][vc_column_text css=&#8221;&#8221;]<\/p>\n<h4>May 9, 2025<\/h4>\n<p>[\/vc_column_text]<div class=\"mkd-accordion-holder clearfix mkd-toggle mkd-initial \">\n\t<h5 class=\"clearfix mkd-title-holder\">\n<span class=\"mkd-accordion-mark mkd-left-mark\">\n\t\t<span class=\"mkd-accordion-mark-icon\">\n\t\t\t<span class=\"icon_plus\"><\/span>\n\t\t\t<span class=\"icon_minus-06\"><\/span>\n\t\t<\/span>\n<\/span>\n<span class=\"mkd-tab-title\">\n\t\t<span class=\"mkd-tab-title-inner\">\n\t\tView May 9, 2025 Update\t<\/span>\n<\/span>\n<\/h5>\n<div class=\"mkd-accordion-content\">\n\t<div class=\"mkd-accordion-content-inner\">\n\t\t[vc_column_text css=&#8221;&#8221;]<strong>Phase 1B Starts Next Week<\/strong><\/p>\n<p><strong><u>Week of May 5, 2025<\/u><\/strong><\/p>\n<ul>\n<li>CenterPoint Energy continued gas main work<\/li>\n<li>Phase 1A (9<sup>th<\/sup> Avenue North) utility work started with sanitary sewer and watermain installation on the 100 block of 9<sup>th<\/sup> Ave N, and sanitary sewer installation on the 200 block of 9<sup>th<\/sup> Ave N<\/li>\n<\/ul>\n<p><strong><u>Week of May 12, 2025<\/u><\/strong><\/p>\n<ul>\n<li>CenterPoint Energy should be wrapping up the remainder of their gas main work<\/li>\n<li>Traffic control devices and sidewalk closure signage will be installed along Phase 1B (10th Avenue North and 3<sup>rd<\/sup> Street North)\n<ul>\n<li>Please refer to the <a href=\"https:\/\/clients.bolton-menk.com\/hopkinsavenuesproject\/wp-content\/uploads\/sites\/296\/2025\/05\/Hopkins-Central-Ave_Alley-Access-Map-scaled.jpg\">closure and access map<\/a> for residential alley access while Phases 1A and 1B are under construction<\/li>\n<\/ul>\n<\/li>\n<li>Phase 1B removals including existing sidewalks, curbing, driveways, and street pavement will occur throughout the week<\/li>\n<li>The temporary water system will be installed for Phase 1B and hookups to individual properties will occur later in the week or early the following week. Affected residents will be notified.<\/li>\n<li>A scheduled water shutdown will occur on Monday evening from 7 p.m. to 9 p.m. that will affect the block of 9<sup>th<\/sup> Avenue N between Mainstreet and 1<sup>st<\/sup> Street N. Notices were provided to affected properties on Friday, May 9.\n<ul>\n<li>Please note that this work will occur after normal working hours.<\/li>\n<li>As part of Monday\u2019s water shutdown, construction activity and excavation will occur on the north side of the 9<sup>th<\/sup> Avenue North and 1<sup>st<\/sup> Street North intersection to install a new water valve on Phase 1A. Please be cautious and try to avoid driving through this intersection on Monday, May 12.<\/li>\n<\/ul>\n<\/li>\n<li>Utility work will continue on Phase 1A, with water and sewer service replacements on the 100 block of 9<sup>th<\/sup> Ave North and utility main work on the 200 block of 9<sup>th<\/sup> Ave North.<\/li>\n<\/ul>\n<p>[\/vc_column_text]\n\t\t\t<\/div>\n<\/div>\n<\/div>[vc_empty_space height=&#8221;20px&#8221;][vc_column_text css=&#8221;&#8221;]<\/p>\n<h4>May 2, 2025<\/h4>\n<p>[\/vc_column_text]<div class=\"mkd-accordion-holder clearfix mkd-toggle mkd-initial \">\n\t<h5 class=\"clearfix mkd-title-holder\">\n<span class=\"mkd-accordion-mark mkd-left-mark\">\n\t\t<span class=\"mkd-accordion-mark-icon\">\n\t\t\t<span class=\"icon_plus\"><\/span>\n\t\t\t<span class=\"icon_minus-06\"><\/span>\n\t\t<\/span>\n<\/span>\n<span class=\"mkd-tab-title\">\n\t\t<span class=\"mkd-tab-title-inner\">\n\t\tView May 2, 2025 Update\t<\/span>\n<\/span>\n<\/h5>\n<div class=\"mkd-accordion-content\">\n\t<div class=\"mkd-accordion-content-inner\">\n\t\t[vc_column_text css=&#8221;&#8221;]<\/p>\n<p align=\"left\"><strong>Phase 1A Utility Work Starts Next Week<\/strong><\/p>\n<p align=\"left\"><span style=\"text-decoration: underline\">Week of 4\/28\/25<\/span><\/p>\n<ul>\n<li>Centerpoint Energy continued gas main work<\/li>\n<li>Traffic control devices and sidewalk closure signage were installed along Phase 1A<\/li>\n<li>Phase 1A (9th Avenue North) removals including existing sidewalks, curbing, driveways, and street pavement were completed<\/li>\n<li>Phase 1A temporary water system was installed<\/li>\n<li>Phase 1A residences were connected to temporary water<\/li>\n<li>Due to rain from Thursday and poor surface soils, vehicle traffic should be avoided on 9<sup>th<\/sup>\u00a0Avenue North (Phase 1A) this weekend. Signage has been adjusted to minimize any thru traffic. The contractor is also trying to dry out the surface to the best of their ability.<\/li>\n<\/ul>\n<p align=\"left\"><span style=\"text-decoration: underline\">Week of 5\/5\/25<\/span><\/p>\n<ul>\n<li>Centerpoint Energy should be wrapping up the remainder of their gas main work.<\/li>\n<li>A scheduled water shutdown will occur early in the week that will affect the 300 block of 9<sup>th<\/sup>\u00a0Avenue N. Notices were provided to affected properties on Friday, May 2.<\/li>\n<li>As part of Monday\u2019s water shutdown, construction activity and excavation will occur on the Northeast section of 9<sup>th<\/sup>\u00a0Avenue North and 3<sup>rd<\/sup>\u00a0Street North to disconnect the existing water main on Phase 1A. Please be cautious and try to avoid driving through this intersection on Monday, May 5.<\/li>\n<li>Utility work will start on Phase 1A, beginning with sanitary sewer replacements. This work will start at 2<sup>nd<\/sup>\u00a0Street North and move south towards 1<sup>st<\/sup>\u00a0Street North along 9<sup>th<\/sup>\u00a0Avenue North.<\/li>\n<li>Advanced notice signage will be placed for the upcoming Phase 1B (10th Avenue North and 3rd Street North) construction starting May 12, and pavement removals will be painted out for limits.<\/li>\n<\/ul>\n<p align=\"left\">Please note:<\/p>\n<ul>\n<li>Driveway access, sidewalk accessibility and on-street parking will be impacted\u00a0during the working day (7 a.m. to 7 p.m.) and not readily accessible along Phase 1A (9th Avenue North).<\/li>\n<li>Phase 1A intersections at 2<sup>nd<\/sup>\u00a0Street North and 3<sup>rd<\/sup>\u00a0Street North will be closed off to thru traffic. The intersection of 9<sup>th<\/sup>\u00a0Avenue North and 1<sup>st<\/sup>\u00a0Street North will remain accessible, as well as the alleys along Phase 1A.<\/li>\n<li>Please try to avoid work zones for the safety of the contractor and the public.<\/li>\n<li>Multiple school bus companies have been contacted by members of the project team, if you experience any issues with bus stop locations not being updated, please contact a member of the project team.<\/li>\n<\/ul>\n<p>[\/vc_column_text]\n\t\t\t<\/div>\n<\/div>\n<\/div>[vc_empty_space height=&#8221;20px&#8221;][vc_column_text css=&#8221;&#8221;]<\/p>\n<h4>April 25, 2025<\/h4>\n<p>[\/vc_column_text]<div class=\"mkd-accordion-holder clearfix mkd-toggle mkd-initial \">\n\t<h5 class=\"clearfix mkd-title-holder\">\n<span class=\"mkd-accordion-mark mkd-left-mark\">\n\t\t<span class=\"mkd-accordion-mark-icon\">\n\t\t\t<span class=\"icon_plus\"><\/span>\n\t\t\t<span class=\"icon_minus-06\"><\/span>\n\t\t<\/span>\n<\/span>\n<span class=\"mkd-tab-title\">\n\t\t<span class=\"mkd-tab-title-inner\">\n\t\tView April 25, 2025 Update\t<\/span>\n<\/span>\n<\/h5>\n<div class=\"mkd-accordion-content\">\n\t<div class=\"mkd-accordion-content-inner\">\n\t\t[vc_column_text css=&#8221;&#8221;]<strong>Phase 1A (9th Avenue North) Removals &amp; Temp Water Next Week<\/strong><\/p>\n<p><span style=\"text-decoration: underline\">Week of 4\/21\/25<\/span><\/p>\n<ul>\n<li>Centerpoint Energy continued gas main work on multiple streets within the project area<\/li>\n<li>Tree removals occurred on all 2025 phases<\/li>\n<li>Residents should have received the first monthly project newsletter<\/li>\n<li>Contractor began mobilizing equipment and traffic control items in preparation for starting Phase 1A (See phasing map below for more details)<\/li>\n<\/ul>\n<p><span style=\"text-decoration: underline\">Week of 4\/28\/25<\/span><\/p>\n<ul>\n<li>Centerpoint Energy should finish up any remaining gas main work<\/li>\n<li>Traffic control devices and sidewalk closure signage will be installed along Phase 1A (9th Avenue North)<\/li>\n<li>Phase 1A removals such as existing sidewalks, curbing, driveways, and street pavement will occur<\/li>\n<li>Phase 1A temporary water system will be installed<\/li>\n<li>Phase 1A temporary water connections to houses will occur later in the week<\/li>\n<\/ul>\n<p><span style=\"text-decoration: underline\"><em>Starting on 4\/28\/25, please note the following:<\/em><\/span><\/p>\n<ul>\n<li>Driveway access, sidewalk accessibility and on-street parking during the working day (7 am to 7 pm) will be impacted and not readily accessible along Phase 1A.<\/li>\n<li>Phase 1A intersections at 2<sup>nd<\/sup>\u00a0Street North and 3<sup>rd<\/sup>\u00a0Street North will be closed off to through-traffic. The intersection of 9<sup>th<\/sup>\u00a0Avenue North and 1<sup>st<\/sup>\u00a0Street North will remain accessible, as well as the alleys along Phase 1A.<\/li>\n<li>Please try to avoid work zones as much as possible for your safety and the contractor&#8217;s.<\/li>\n<li>Multiple school bus companies have been contacted by members of the project team, if you experience any issues with bus stop locations not being updated, please contact a member of the project team<\/li>\n<\/ul>\n<p><span style=\"text-decoration: underline\">Week of 5\/5\/25<\/span><\/p>\n<ul>\n<li>A scheduled water shutdown will occur early in the week that will affect some areas around Phase 1A, affected properties will be notified in advance<\/li>\n<li>Utility work will start on Phase 1A with the sanitary sewer replacements. This work will start at 1<sup>st<\/sup>\u00a0Street North and progress to the north along 9<sup>th<\/sup>\u00a0Avenue (Phase 1A)<\/li>\n<\/ul>\n<p>[\/vc_column_text]\n\t\t\t<\/div>\n<\/div>\n<\/div>[vc_empty_space height=&#8221;20px&#8221;][vc_column_text css=&#8221;&#8221;]<\/p>\n<h4>April 18, 2025<\/h4>\n<p>[\/vc_column_text]<div class=\"mkd-accordion-holder clearfix mkd-toggle mkd-initial \">\n\t<h5 class=\"clearfix mkd-title-holder\">\n<span class=\"mkd-accordion-mark mkd-left-mark\">\n\t\t<span class=\"mkd-accordion-mark-icon\">\n\t\t\t<span class=\"icon_plus\"><\/span>\n\t\t\t<span class=\"icon_minus-06\"><\/span>\n\t\t<\/span>\n<\/span>\n<span class=\"mkd-tab-title\">\n\t\t<span class=\"mkd-tab-title-inner\">\n\t\tView April 18, 2025 Update\t<\/span>\n<\/span>\n<\/h5>\n<div class=\"mkd-accordion-content\">\n\t<div class=\"mkd-accordion-content-inner\">\n\t\t[vc_column_text css=&#8221;&#8221;]<strong>Tree Removals Start Next Week!<\/strong><\/p>\n<p><span style=\"text-decoration: underline\">Week of 4\/21\/25<\/span><\/p>\n<ul>\n<li>Trees within 2025 Phases will be marked for removal (Phase 1A trees were marked on April 18).<\/li>\n<li>Residents will be receiving the first project newsletter early in the week.<\/li>\n<li>Centerpoint Energy\u2019s gas main work will continue progressing on multiple project streets.<\/li>\n<li>Tree removals on 2025 phases will begin on April 24.<\/li>\n<\/ul>\n<p><span style=\"text-decoration: underline\">Week of 4\/28\/25<\/span><\/p>\n<ul>\n<li>Tree removals on 2025 phases will wrap up if not already completed.<\/li>\n<li>Gas main work will continue.<\/li>\n<li>Phase 1A temporary water system will be installed (notice will be provided to affected properties)<\/li>\n<li>Roadway, curb, driveways and sidewalks in phase 1A will be removed.<\/li>\n<\/ul>\n<p><span style=\"text-decoration: underline\">Week of 5\/5\/24<\/span><\/p>\n<ul>\n<li>Utility work will start on Phase 1A.<\/li>\n<\/ul>\n<p><em>Please note, all schedules are subject to change due to weather and other unforeseen circumstances, please visit the project website for updates throughout construction.<\/em>[\/vc_column_text]\n\t\t\t<\/div>\n<\/div>\n<\/div>[vc_empty_space height=&#8221;20px&#8221;][vc_column_text css=&#8221;&#8221;]<\/p>\n<h4>April 11, 2025<\/h4>\n<p>[\/vc_column_text]<div class=\"mkd-accordion-holder clearfix mkd-toggle mkd-initial \">\n\t<h5 class=\"clearfix mkd-title-holder\">\n<span class=\"mkd-accordion-mark mkd-left-mark\">\n\t\t<span class=\"mkd-accordion-mark-icon\">\n\t\t\t<span class=\"icon_plus\"><\/span>\n\t\t\t<span class=\"icon_minus-06\"><\/span>\n\t\t<\/span>\n<\/span>\n<span class=\"mkd-tab-title\">\n\t\t<span class=\"mkd-tab-title-inner\">\n\t\tView April 11, 2025 Update\t<\/span>\n<\/span>\n<\/h5>\n<div class=\"mkd-accordion-content\">\n\t<div class=\"mkd-accordion-content-inner\">\n\t\t[vc_column_text css=&#8221;&#8221;]<\/p>\n<p style=\"text-align: left\">Thank you to everyone who attended the neighborhood meeting on April 9<sup>th<\/sup>. Street and utilities construction\u00a0is tentatively scheduled to begin later this month. Project updates and further information will be coming soon. If you missed the meeting, check out the <a href=\"https:\/\/clients.bolton-menk.com\/hopkinsavenuesproject\/#:~:text=NEIGHBORHOOD%20MEETING%20%234%20%E2%80%93%20HOPKINS%20CENTRAL%20AVENUES%20IMPROVEMENTS%20PROJECT\">recorded presentation on the project website<\/a>!<\/p>\n<p style=\"text-align: left\">Centerpoint Energy and Michels Corp. will be continuing to conduct gas main replacements and relocations on 9<sup>th<\/sup> Ave, 10<sup>th<\/sup> Ave, 11<sup>th<\/sup> Ave, and 3<sup>rd<\/sup> St N. You can learn more on <a href=\"https:\/\/www.centerpointenergy.com\/en-us\/InYourCommunity\/Pages\/ConstructionZoneProjectSites\/Natural-Gas-Line-Upgrades-in-Hopkins.aspx?sa=mn&amp;au=res\">Centerpoint\u2019s project website<\/a>.<\/p>\n<p>[\/vc_column_text]\n\t\t\t<\/div>\n<\/div>\n<\/div>[vc_empty_space height=&#8221;20px&#8221;][vc_column_text css=&#8221;&#8221;]<\/p>\n<h4>March 28, 2025<\/h4>\n<p>[\/vc_column_text]<div class=\"mkd-accordion-holder clearfix mkd-toggle mkd-initial \">\n\t<h5 class=\"clearfix mkd-title-holder\">\n<span class=\"mkd-accordion-mark mkd-left-mark\">\n\t\t<span class=\"mkd-accordion-mark-icon\">\n\t\t\t<span class=\"icon_plus\"><\/span>\n\t\t\t<span class=\"icon_minus-06\"><\/span>\n\t\t<\/span>\n<\/span>\n<span class=\"mkd-tab-title\">\n\t\t<span class=\"mkd-tab-title-inner\">\n\t\tView March 28, 2025 Update\t<\/span>\n<\/span>\n<\/h5>\n<div class=\"mkd-accordion-content\">\n\t<div class=\"mkd-accordion-content-inner\">\n\t\t[vc_column_text css=&#8221;&#8221;]<u>Week of March 31<sup>st<\/sup><\/u><\/p>\n<ul>\n<li>Michels Corp. and Centerpoint Energy will begin gas main replacements and relocations starting on the 200 block of 9<sup>th<\/sup> Avenue N.<\/li>\n<li>Find project updates and contact information on <a href=\"https:\/\/www.centerpointenergy.com\/en-us\/InYourCommunity\/Pages\/ConstructionZoneProjectSites\/Natural-Gas-Line-Upgrades-in-Hopkins.aspx?sa=mn&amp;au=res\">Centerpoint Energy\u2019s Hopkins project website.<\/a> You can also learn more on <a href=\"https:\/\/clients.bolton-menk.com\/hopkinsavenuesproject\/wp-content\/uploads\/sites\/296\/2025\/03\/115519677-Hopkins-Letter.pdf\">the project flyer.<\/a><\/li>\n<li>Letters (not related to Centerpoint Energy\u2019s work) will be mailed to individual properties regarding potential construction related impacts to items such as retaining walls, landscaping, railings, and trees.\n<ul>\n<li>Please note, these letters are only being mailed to properties affected by 2025 construction activity (9<sup>th<\/sup> Ave N, 10<sup>th<\/sup> Ave N, and 11<sup>th<\/sup> Ave N) including properties that may fall within the 2025 \u201cflex\u201d phases (11<sup>th<\/sup> Ave N).<\/li>\n<li>Letters regarding potential construction impacts in front of properties along 12<sup>th<\/sup> Ave N and 13<sup>th<\/sup> Ave N will be mailed to those properties closer to the start of construction in 2026.<\/li>\n<\/ul>\n<\/li>\n<\/ul>\n<p><u>Week of April 5<sup>th<\/sup><\/u><\/p>\n<ul>\n<li>Gas main replacements and relocations will continue for the foreseeable future, staying ahead of the City\u2019s contractor.<\/li>\n<li><strong>APRIL 9<sup>th<\/sup> \u2013 Join us for the final project open house at 5:30 pm at Hopkins City Hall (1010 1st St S, Hopkins, MN 55343). <\/strong>You can also register to join the meeting online.<\/li>\n<\/ul>\n<p>[\/vc_column_text]\n\t\t\t<\/div>\n<\/div>\n<\/div>[\/vc_column][\/vc_row]<\/p>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>[vc_row][vc_column][vc_column_text css=&#8221;&#8221;] Project Updates [\/vc_column_text][vc_empty_space height=&#8221;20px&#8221;][vc_column_text css=&#8221;&#8221;] May 29, 2026 12th Avenue Detour Adjustment Next Week Week of May 25 Sidewalks on Phases 2A (11th Ave N from 3rd St N to Minnetonka Mills Rd and 4th St N from 12th Ave N to 11th&#8230;<\/p>\n","protected":false},"author":3,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"inline_featured_image":false,"footnotes":""},"class_list":["post-1140","page","type-page","status-publish","hentry"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.7 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Project Updates - City of Hopkins - Central Avenues Improvements Project<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/clients.bolton-menk.com\/hopkinsavenuesproject\/updates\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Project Updates - City of Hopkins - Central Avenues Improvements Project\" \/>\n<meta property=\"og:description\" content=\"[vc_row][vc_column][vc_column_text css=&#8221;&#8221;] Project Updates [\/vc_column_text][vc_empty_space height=&#8221;20px&#8221;][vc_column_text css=&#8221;&#8221;] May 29, 2026 12th Avenue Detour Adjustment Next Week Week of May 25 Sidewalks on Phases 2A (11th Ave N from 3rd St N to Minnetonka Mills Rd and 4th St N from 12th Ave N to 11th...\" \/>\n<meta property=\"og:url\" content=\"https:\/\/clients.bolton-menk.com\/hopkinsavenuesproject\/updates\/\" \/>\n<meta property=\"og:site_name\" content=\"City of Hopkins - Central Avenues Improvements Project\" \/>\n<meta property=\"article:modified_time\" content=\"2026-05-29T18:43:14+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"53 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/clients.bolton-menk.com\\\/hopkinsavenuesproject\\\/updates\\\/\",\"url\":\"https:\\\/\\\/clients.bolton-menk.com\\\/hopkinsavenuesproject\\\/updates\\\/\",\"name\":\"Project Updates - City of Hopkins - Central Avenues Improvements Project\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/clients.bolton-menk.com\\\/hopkinsavenuesproject\\\/#website\"},\"datePublished\":\"2023-05-30T16:47:06+00:00\",\"dateModified\":\"2026-05-29T18:43:14+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/clients.bolton-menk.com\\\/hopkinsavenuesproject\\\/updates\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/clients.bolton-menk.com\\\/hopkinsavenuesproject\\\/updates\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/clients.bolton-menk.com\\\/hopkinsavenuesproject\\\/updates\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/clients.bolton-menk.com\\\/hopkinsavenuesproject\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Project Updates\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/clients.bolton-menk.com\\\/hopkinsavenuesproject\\\/#website\",\"url\":\"https:\\\/\\\/clients.bolton-menk.com\\\/hopkinsavenuesproject\\\/\",\"name\":\"Marine on St. Croix Comp Plan\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/clients.bolton-menk.com\\\/hopkinsavenuesproject\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Project Updates - City of Hopkins - Central Avenues Improvements Project","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/clients.bolton-menk.com\/hopkinsavenuesproject\/updates\/","og_locale":"en_US","og_type":"article","og_title":"Project Updates - City of Hopkins - Central Avenues Improvements Project","og_description":"[vc_row][vc_column][vc_column_text css=&#8221;&#8221;] Project Updates [\/vc_column_text][vc_empty_space height=&#8221;20px&#8221;][vc_column_text css=&#8221;&#8221;] May 29, 2026 12th Avenue Detour Adjustment Next Week Week of May 25 Sidewalks on Phases 2A (11th Ave N from 3rd St N to Minnetonka Mills Rd and 4th St N from 12th Ave N to 11th...","og_url":"https:\/\/clients.bolton-menk.com\/hopkinsavenuesproject\/updates\/","og_site_name":"City of Hopkins - Central Avenues Improvements Project","article_modified_time":"2026-05-29T18:43:14+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"53 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/clients.bolton-menk.com\/hopkinsavenuesproject\/updates\/","url":"https:\/\/clients.bolton-menk.com\/hopkinsavenuesproject\/updates\/","name":"Project Updates - City of Hopkins - Central Avenues Improvements Project","isPartOf":{"@id":"https:\/\/clients.bolton-menk.com\/hopkinsavenuesproject\/#website"},"datePublished":"2023-05-30T16:47:06+00:00","dateModified":"2026-05-29T18:43:14+00:00","breadcrumb":{"@id":"https:\/\/clients.bolton-menk.com\/hopkinsavenuesproject\/updates\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/clients.bolton-menk.com\/hopkinsavenuesproject\/updates\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/clients.bolton-menk.com\/hopkinsavenuesproject\/updates\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/clients.bolton-menk.com\/hopkinsavenuesproject\/"},{"@type":"ListItem","position":2,"name":"Project Updates"}]},{"@type":"WebSite","@id":"https:\/\/clients.bolton-menk.com\/hopkinsavenuesproject\/#website","url":"https:\/\/clients.bolton-menk.com\/hopkinsavenuesproject\/","name":"Marine on St. Croix Comp Plan","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/clients.bolton-menk.com\/hopkinsavenuesproject\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"}]}},"_links":{"self":[{"href":"https:\/\/clients.bolton-menk.com\/hopkinsavenuesproject\/wp-json\/wp\/v2\/pages\/1140","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/clients.bolton-menk.com\/hopkinsavenuesproject\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/clients.bolton-menk.com\/hopkinsavenuesproject\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/clients.bolton-menk.com\/hopkinsavenuesproject\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/clients.bolton-menk.com\/hopkinsavenuesproject\/wp-json\/wp\/v2\/comments?post=1140"}],"version-history":[{"count":119,"href":"https:\/\/clients.bolton-menk.com\/hopkinsavenuesproject\/wp-json\/wp\/v2\/pages\/1140\/revisions"}],"predecessor-version":[{"id":1505,"href":"https:\/\/clients.bolton-menk.com\/hopkinsavenuesproject\/wp-json\/wp\/v2\/pages\/1140\/revisions\/1505"}],"wp:attachment":[{"href":"https:\/\/clients.bolton-menk.com\/hopkinsavenuesproject\/wp-json\/wp\/v2\/media?parent=1140"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}