{"id":1258,"date":"2023-09-27T17:32:57","date_gmt":"2023-09-27T17:32:57","guid":{"rendered":"https:\/\/clients.bolton-menk.com\/jordanengineering\/?page_id=1258"},"modified":"2025-07-11T14:48:56","modified_gmt":"2025-07-11T14:48:56","slug":"2025-190th-street-improvements","status":"publish","type":"page","link":"https:\/\/clients.bolton-menk.com\/jordanengineering\/2025-190th-street-improvements\/","title":{"rendered":"2025 190th Street Improvements"},"content":{"rendered":"<div class=\"wpb-content-wrapper\"><p>[vc_row][vc_column width=&#8221;1\/5&#8243;][\/vc_column][vc_column width=&#8221;3\/5&#8243;][vc_column_text css_animation=&#8221;none&#8221; css=&#8221;&#8221;]<\/p>\n<h1>2025 190th Street Reconstruction<\/h1>\n<p>[\/vc_column_text][vc_empty_space height=&#8221;30 px&#8221;][vc_column_text css=&#8221;&#8221;]<\/p>\n<h3 style=\"text-align: center\">Project Newsletter &#8211; June 2025<\/h3>\n<p>[\/vc_column_text][vc_empty_space height=&#8221;15 px&#8221;][vc_column_text css=&#8221;&#8221;]<\/p>\n<p style=\"text-align: left\"><strong>190<sup>th<\/sup> Street between CR 9 and Beaumont Avenue will be closed to thru traffic starting June 4th<\/strong>. Read the latest updates to traffic closures and construction in the <a href=\"https:\/\/clients.bolton-menk.com\/jordanengineering\/wp-content\/uploads\/sites\/44\/2025\/07\/190th-Street-Detour-Map_Newsletter3.pdf\">July Construction Newsletter<\/a>.<\/p>\n<p style=\"text-align: left\"><strong>Upcoming traffic control change at CR 9 and 190th Street for MnDOT\u2019s CR 9 Roundabout Construction:<\/strong> Starting the week of July 21, MnDOT intends to implement a traffic control change at the CR 9 and 190th Street\/Valley View Drive Intersection. Traffic will be switched over to the east side of CR 9 at the 190th Street \/ Valley View Drive intersection for construction of the west half of the roundabout that is part of the Highway 169 \/ TH 282 \/ CR 9 Interchange project. CR 9 through traffic will be maintained with one lane in each direction via the newly constructed eastern half of the roundabout. With this traffic control change,<strong> 190th Street will be closed at CR 9 for all motorists<\/strong>. All traffic, including local traffic with direct access off of 190th Street, will need to follow the detour along 185th Street and Beaumont Avenue as depicted on the <a href=\"https:\/\/clients.bolton-menk.com\/jordanengineering\/wp-content\/uploads\/sites\/44\/2025\/07\/190th-Street-Detour-Map_Newsletter3.pdf\">detour map<\/a>. This closure is expected to be in place through October 2025.<\/p>\n<p>[\/vc_column_text][vc_empty_space height=&#8221;15 px&#8221;][vc_btn title=&#8221;Sign up for construction updates!&#8221; color=&#8221;black&#8221; align=&#8221;center&#8221; css_animation=&#8221;fadeIn&#8221; css=&#8221;&#8221; link=&#8221;url:https%3A%2F%2Fpublic.govdelivery.com%2Faccounts%2FMNBOLTONMENK%2Fsubscriber%2Fnew%3Ftopic_id%3DMNBOLTONMENK_288|target:_blank&#8221;][vc_empty_space height=&#8221;15 px&#8221;][\/vc_column][vc_column width=&#8221;1\/5&#8243;][\/vc_column][\/vc_row][vc_row][vc_column width=&#8221;1\/5&#8243;][\/vc_column][vc_column width=&#8221;3\/5&#8243;][vc_column_text css=&#8221;&#8221;]<\/p>\n<h3 style=\"text-align: center\">Construction Access Map<\/h3>\n<p>[\/vc_column_text][vc_column_text css=&#8221;&#8221;]<em>Click image to view larger version.<\/em>[\/vc_column_text][vc_empty_space height=&#8221;15 px&#8221;][vc_single_image image=&#8221;1924&#8243; img_size=&#8221;large&#8221; alignment=&#8221;center&#8221; onclick=&#8221;custom_link&#8221; img_link_target=&#8221;_blank&#8221; css_animation=&#8221;none&#8221; css=&#8221;.vc_custom_1752165541033{border-right-width: 0px !important;border-bottom-width: 0px !important;border-left-width: 0px !important;border-color: #ffffff !important;}&#8221; link=&#8221;https:\/\/clients.bolton-menk.com\/jordanengineering\/wp-content\/uploads\/sites\/44\/2025\/07\/190th-Street-Detour-Map_Newsletter3.pdf&#8221;][vc_empty_space height=&#8221;15 px&#8221;][vc_column_text css=&#8221;&#8221;]<\/p>\n<h3 style=\"text-align: center\">Project area map<\/h3>\n<p>[\/vc_column_text][vc_column_text css=&#8221;&#8221;]<em>Click image to view larger version.<\/em>[\/vc_column_text][vc_empty_space height=&#8221;15 px&#8221;][vc_single_image image=&#8221;1276&#8243; img_size=&#8221;large&#8221; alignment=&#8221;center&#8221; onclick=&#8221;img_link_large&#8221; img_link_target=&#8221;_blank&#8221; css_animation=&#8221;none&#8221; css=&#8221;.vc_custom_1735924085266{border-right-width: 0px !important;border-bottom-width: 0px !important;border-left-width: 0px !important;border-color: #ffffff !important;}&#8221;][vc_empty_space height=&#8221;30 px&#8221;][vc_column_text css=&#8221;&#8221;]<\/p>\n<h3 style=\"text-align: center\">Final design layout<\/h3>\n<p>[\/vc_column_text][vc_column_text css=&#8221;&#8221;]<em>Click image to view larger version.<\/em>[\/vc_column_text][vc_empty_space height=&#8221;15 px&#8221;][vc_single_image image=&#8221;1497&#8243; img_size=&#8221;large&#8221; alignment=&#8221;center&#8221; onclick=&#8221;custom_link&#8221; img_link_target=&#8221;_blank&#8221; css_animation=&#8221;none&#8221; css=&#8221;.vc_custom_1735923984577{border-right-width: 0px !important;border-bottom-width: 0px !important;border-left-width: 0px !important;border-color: #ffffff !important;}&#8221; link=&#8221;https:\/\/clients.bolton-menk.com\/jordanengineering\/wp-content\/uploads\/sites\/44\/2024\/07\/FIGR_131398_Large-Layout-3-Lane_7-9-24.pdf&#8221;][vc_empty_space height=&#8221;30 px&#8221;][vc_column_text css_animation=&#8221;none&#8221; css=&#8221;&#8221;]<\/p>\n<hr \/>\n<h3 style=\"text-align: left\">Project background<\/h3>\n<p style=\"text-align: left\">These improvements will replace the deteriorating pavement and prepare the corridor for future growth and development in the area. Key improvements include:<\/p>\n<ul style=\"text-align: left\">\n<li>Addition of center left-turn lane and right-turn lanes<\/li>\n<li>Addition of concrete curb and gutter and storm sewer<\/li>\n<li>Improved stormwater management<\/li>\n<li>Preparing the south side of the roadway for a future multi-use trail<\/li>\n<\/ul>\n<p style=\"text-align: left\">This construction will align with the Hwy 169 \/ Hwy 282 \/ Co. Rd. 9 interchange construction which includes a roundabout at the Co. Rd. 9 \/ 190th St. \/ Valley View Dr. intersection. More information about that project can be found on the <a href=\"https:\/\/clients.bolton-menk.com\/jordanengineering\/us169-hwy282-cr9interchange\/\">project website<\/a>.<\/p>\n<p>[\/vc_column_text][vc_column_text css=&#8221;&#8221;]<\/p>\n<hr \/>\n<h3 style=\"text-align: left\">Documents<\/h3>\n<ul>\n<li style=\"text-align: left\"><a href=\"https:\/\/clients.bolton-menk.com\/jordanengineering\/wp-content\/uploads\/sites\/44\/2025\/07\/190th-Street-Detour-Map_Newsletter3.pdf\">Project Newsletter 03 (July 2025)<\/a><\/li>\n<li style=\"text-align: left\"><a href=\"https:\/\/clients.bolton-menk.com\/jordanengineering\/wp-content\/uploads\/sites\/44\/2025\/05\/Newsletter_02.pdf\">Project Newsletter 02 (June 2025)<\/a><\/li>\n<li style=\"text-align: left\"><a href=\"https:\/\/clients.bolton-menk.com\/jordanengineering\/wp-content\/uploads\/sites\/44\/2025\/04\/Newsletter_01.pdf\">Project Newsletter 01 (May 2025)<\/a><\/li>\n<li style=\"text-align: left\"><a href=\"https:\/\/youtu.be\/u9WXw3UWPSo\">Public Meeting Presentation Video (March 2025)<\/a><\/li>\n<li style=\"text-align: left\"><a href=\"https:\/\/youtu.be\/u9WXw3UWPSo\">Project overview video (Feb. 2025)<\/a><\/li>\n<li style=\"text-align: left\"><a href=\"https:\/\/clients.bolton-menk.com\/jordanengineering\/wp-content\/uploads\/sites\/44\/2024\/11\/FIGR_131398_Large-Layout-3-Lane_9.03.24.pdf\" target=\"_blank\" rel=\"noopener\">Approved roadway design layout (Sept. 2024)<\/a><\/li>\n<li style=\"text-align: left\"><a href=\"https:\/\/clients.bolton-menk.com\/jordanengineering\/wp-content\/uploads\/sites\/44\/2024\/11\/FIGR_131398_Large-Layout-3-Lane_9.03.24.pdf\" target=\"_blank\" rel=\"noopener\">Preliminary roadway design layout (July 2024)<\/a><\/li>\n<li style=\"text-align: left\"><a href=\"https:\/\/clients.bolton-menk.com\/jordanengineering\/wp-content\/uploads\/sites\/44\/2024\/03\/3-Lane-Typical-Section.png\">Proposed typical section (March 2024)<\/a><\/li>\n<li style=\"text-align: left\"><a href=\"https:\/\/clients.bolton-menk.com\/jordanengineering\/wp-content\/uploads\/sites\/44\/2024\/03\/Jordan-190th-Open-House-Invite.pdf\">Open house invite (March 2024)<\/a><\/li>\n<li style=\"text-align: left\"><a href=\"https:\/\/youtu.be\/JUl-LPzeLCw\" target=\"_blank\" rel=\"noopener\">Project overview video (March 2024)<\/a><\/li>\n<\/ul>\n<p>[\/vc_column_text][vc_empty_space height=&#8221;20 px&#8221;][vc_column_text css=&#8221;&#8221;]<\/p>\n<hr \/>\n<h3 style=\"text-align: left\">Project milestones<\/h3>\n<ul>\n<li style=\"text-align: left\"><strong>February 2025:\u00a0<\/strong>Bidding<\/li>\n<li style=\"text-align: left\"><b>March 5th, 2025:\u00a0<\/b>Public Info Meeting<\/li>\n<li style=\"text-align: left\"><strong>March 10th, 2025:\u00a0<\/strong>Public Hearing on Assessments<\/li>\n<li style=\"text-align: left\"><strong>Late March 2025:\u00a0<\/strong>Tree Removals<\/li>\n<li style=\"text-align: left\"><strong>Spring 2025:\u00a0<\/strong>Private Utility Relocations<\/li>\n<li style=\"text-align: left\"><strong>Spring &#8211; Fall 2025:\u00a0<\/strong>Construction<\/li>\n<\/ul>\n<p>[\/vc_column_text][vc_empty_space height=&#8221;20 px&#8221;][vc_column_text css=&#8221;&#8221;]<\/p>\n<hr \/>\n<h3 style=\"text-align: left\">Related Projects<\/h3>\n<ul>\n<li style=\"text-align: left\"><a href=\"https:\/\/clients.bolton-menk.com\/jordanengineering\/us169-hwy282-cr9interchange\/\">US 169 \/ Hwy 282 \/ CR 9 Interchange<\/a><\/li>\n<li style=\"text-align: left\"><a href=\"https:\/\/clients.bolton-menk.com\/jordanengineering\/2024-us-169-cr-59-delaware-ave-grade-separation\/\">US 169 \/ Cr 59 (Delaware Ave) Grade Separation<\/a><\/li>\n<\/ul>\n<p>[\/vc_column_text][vc_empty_space height=&#8221;20 px&#8221;][vc_column_text css=&#8221;&#8221;]<\/p>\n<hr \/>\n<h3 style=\"text-align: left\">Contacts<\/h3>\n<p style=\"text-align: left\"><strong>Project phone hotline<\/strong>: 952-698-0378<\/p>\n<p>[\/vc_column_text][vc_empty_space height=&#8221;20 px&#8221;][vc_row_inner][vc_column_inner width=&#8221;1\/2&#8243;][vc_column_text css=&#8221;&#8221;]<\/p>\n<p style=\"text-align: left\"><strong>Alex Madson<br \/>\n<\/strong>On-Site Construction Manager<br \/>\nBolton &amp; Menk<br \/>\n(952) 256-3222<br \/>\n<a href=\"Alex.Madson@bolton-menk.com\">Alex.Madson@bolton-menk.com<\/a><\/p>\n<p>[\/vc_column_text][\/vc_column_inner][vc_column_inner width=&#8221;1\/2&#8243;][vc_column_text css=&#8221;&#8221;]<\/p>\n<p style=\"text-align: left\"><strong>Luke Wheeler<br \/>\n<\/strong>Assistant City Engineer<br \/>\nBolton &amp; Menk<br \/>\n(612) 597-9105<br \/>\n<a href=\"mailto:Luke.Wheeler@bolton-menk.com\">Luke.Wheeler@bolton-menk.com<\/a><\/p>\n<p>[\/vc_column_text][\/vc_column_inner][\/vc_row_inner][\/vc_column][vc_column width=&#8221;1\/5&#8243;][\/vc_column][\/vc_row]<\/p>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>[vc_row][vc_column width=&#8221;1\/5&#8243;][\/vc_column][vc_column width=&#8221;3\/5&#8243;][vc_column_text css_animation=&#8221;none&#8221; css=&#8221;&#8221;] 2025 190th Street Reconstruction [\/vc_column_text][vc_empty_space height=&#8221;30 px&#8221;][vc_column_text css=&#8221;&#8221;] Project Newsletter &#8211; June 2025 [\/vc_column_text][vc_empty_space height=&#8221;15 px&#8221;][vc_column_text css=&#8221;&#8221;] 190th Street between CR 9 and Beaumont Avenue will be closed to thru traffic starting June 4th. Read the latest updates to traffic&#8230;<\/p>\n","protected":false},"author":31,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"inline_featured_image":false,"footnotes":""},"class_list":["post-1258","page","type-page","status-publish","hentry"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>2025 190th Street Improvements - City of Jordan MN Engineering<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/clients.bolton-menk.com\/jordanengineering\/2025-190th-street-improvements\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"2025 190th Street Improvements - City of Jordan MN Engineering\" \/>\n<meta property=\"og:description\" content=\"[vc_row][vc_column width=&#8221;1\/5&#8243;][\/vc_column][vc_column width=&#8221;3\/5&#8243;][vc_column_text css_animation=&#8221;none&#8221; css=&#8221;&#8221;] 2025 190th Street Reconstruction [\/vc_column_text][vc_empty_space height=&#8221;30 px&#8221;][vc_column_text css=&#8221;&#8221;] Project Newsletter &#8211; June 2025 [\/vc_column_text][vc_empty_space height=&#8221;15 px&#8221;][vc_column_text css=&#8221;&#8221;] 190th Street between CR 9 and Beaumont Avenue will be closed to thru traffic starting June 4th. Read the latest updates to traffic...\" \/>\n<meta property=\"og:url\" content=\"https:\/\/clients.bolton-menk.com\/jordanengineering\/2025-190th-street-improvements\/\" \/>\n<meta property=\"og:site_name\" content=\"City of Jordan MN Engineering\" \/>\n<meta property=\"article:modified_time\" content=\"2025-07-11T14:48:56+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"4 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/clients.bolton-menk.com\\\/jordanengineering\\\/2025-190th-street-improvements\\\/\",\"url\":\"https:\\\/\\\/clients.bolton-menk.com\\\/jordanengineering\\\/2025-190th-street-improvements\\\/\",\"name\":\"2025 190th Street Improvements - City of Jordan MN Engineering\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/clients.bolton-menk.com\\\/jordanengineering\\\/#website\"},\"datePublished\":\"2023-09-27T17:32:57+00:00\",\"dateModified\":\"2025-07-11T14:48:56+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/clients.bolton-menk.com\\\/jordanengineering\\\/2025-190th-street-improvements\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/clients.bolton-menk.com\\\/jordanengineering\\\/2025-190th-street-improvements\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/clients.bolton-menk.com\\\/jordanengineering\\\/2025-190th-street-improvements\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/clients.bolton-menk.com\\\/jordanengineering\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"2025 190th Street Improvements\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/clients.bolton-menk.com\\\/jordanengineering\\\/#website\",\"url\":\"https:\\\/\\\/clients.bolton-menk.com\\\/jordanengineering\\\/\",\"name\":\"Marine on St. Croix Comp Plan\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/clients.bolton-menk.com\\\/jordanengineering\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"2025 190th Street Improvements - City of Jordan MN Engineering","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/clients.bolton-menk.com\/jordanengineering\/2025-190th-street-improvements\/","og_locale":"en_US","og_type":"article","og_title":"2025 190th Street Improvements - City of Jordan MN Engineering","og_description":"[vc_row][vc_column width=&#8221;1\/5&#8243;][\/vc_column][vc_column width=&#8221;3\/5&#8243;][vc_column_text css_animation=&#8221;none&#8221; css=&#8221;&#8221;] 2025 190th Street Reconstruction [\/vc_column_text][vc_empty_space height=&#8221;30 px&#8221;][vc_column_text css=&#8221;&#8221;] Project Newsletter &#8211; June 2025 [\/vc_column_text][vc_empty_space height=&#8221;15 px&#8221;][vc_column_text css=&#8221;&#8221;] 190th Street between CR 9 and Beaumont Avenue will be closed to thru traffic starting June 4th. Read the latest updates to traffic...","og_url":"https:\/\/clients.bolton-menk.com\/jordanengineering\/2025-190th-street-improvements\/","og_site_name":"City of Jordan MN Engineering","article_modified_time":"2025-07-11T14:48:56+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"4 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/clients.bolton-menk.com\/jordanengineering\/2025-190th-street-improvements\/","url":"https:\/\/clients.bolton-menk.com\/jordanengineering\/2025-190th-street-improvements\/","name":"2025 190th Street Improvements - City of Jordan MN Engineering","isPartOf":{"@id":"https:\/\/clients.bolton-menk.com\/jordanengineering\/#website"},"datePublished":"2023-09-27T17:32:57+00:00","dateModified":"2025-07-11T14:48:56+00:00","breadcrumb":{"@id":"https:\/\/clients.bolton-menk.com\/jordanengineering\/2025-190th-street-improvements\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/clients.bolton-menk.com\/jordanengineering\/2025-190th-street-improvements\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/clients.bolton-menk.com\/jordanengineering\/2025-190th-street-improvements\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/clients.bolton-menk.com\/jordanengineering\/"},{"@type":"ListItem","position":2,"name":"2025 190th Street Improvements"}]},{"@type":"WebSite","@id":"https:\/\/clients.bolton-menk.com\/jordanengineering\/#website","url":"https:\/\/clients.bolton-menk.com\/jordanengineering\/","name":"Marine on St. Croix Comp Plan","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/clients.bolton-menk.com\/jordanengineering\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"}]}},"_links":{"self":[{"href":"https:\/\/clients.bolton-menk.com\/jordanengineering\/wp-json\/wp\/v2\/pages\/1258","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/clients.bolton-menk.com\/jordanengineering\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/clients.bolton-menk.com\/jordanengineering\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/clients.bolton-menk.com\/jordanengineering\/wp-json\/wp\/v2\/users\/31"}],"replies":[{"embeddable":true,"href":"https:\/\/clients.bolton-menk.com\/jordanengineering\/wp-json\/wp\/v2\/comments?post=1258"}],"version-history":[{"count":112,"href":"https:\/\/clients.bolton-menk.com\/jordanengineering\/wp-json\/wp\/v2\/pages\/1258\/revisions"}],"predecessor-version":[{"id":1931,"href":"https:\/\/clients.bolton-menk.com\/jordanengineering\/wp-json\/wp\/v2\/pages\/1258\/revisions\/1931"}],"wp:attachment":[{"href":"https:\/\/clients.bolton-menk.com\/jordanengineering\/wp-json\/wp\/v2\/media?parent=1258"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}