{"id":1995,"date":"2025-10-17T20:22:54","date_gmt":"2025-10-17T20:22:54","guid":{"rendered":"https:\/\/clients.bolton-menk.com\/jordanengineering\/?page_id=1995"},"modified":"2026-07-10T20:34:53","modified_gmt":"2026-07-10T20:34:53","slug":"2026-infrastructure-improvements","status":"publish","type":"page","link":"https:\/\/clients.bolton-menk.com\/jordanengineering\/2026-infrastructure-improvements\/","title":{"rendered":"2026 Infrastructure Improvements"},"content":{"rendered":"<div class=\"wpb-content-wrapper\"><p>[vc_row][vc_column][vc_column_text css_animation=&#8221;fadeInUp&#8221; css=&#8221;&#8221;]<\/p>\n<h1 style=\"text-align: center\">2026 Infrastructure Improvements<\/h1>\n<p>[\/vc_column_text][vc_empty_space height=&#8221;30 px&#8221;][vc_row_inner][vc_column_inner width=&#8221;1\/5&#8243;][vc_empty_space height=&#8221;30 px&#8221;][\/vc_column_inner][vc_column_inner width=&#8221;3\/5&#8243;][vc_column_text css=&#8221;&#8221;]<\/p>\n<hr \/>\n<h3 style=\"text-align: left\">Construction Update<\/h3>\n<h4 style=\"text-align: left\">July 10, 2026<\/h4>\n<p style=\"text-align: left\"><em>Construction on the City of Jordan\u2019s 2026 Infrastructure Improvements project is ongoing, and the contractor is making great progress. Please see below for a summary of the work completed this week, what to expect next week, and some general information to be aware of.<\/em><\/p>\n<p style=\"text-align: left\"><strong><u>Week of July 6<\/u><\/strong><\/p>\n<p style=\"text-align: left\" align=\"left\">Milling took place at\u00a0<strong>Ervin Industrial Dr, Enterprise Dr, Corporate Dr, 185<sup>th<\/sup>\u00a0St, the East side of Timberline Neighborhood, and Bridle Creek\/Arbor View<\/strong>.<\/p>\n<p style=\"text-align: left\" align=\"left\">The bituminous patching crew placed new bituminous material (blacktop) in areas that were milled down to the aggregate base. They will also be completing trail paving in these same areas. They have completed this work in\u00a0<strong>Ervin Industrial Dr, Enterprise Dr, Corporate Dr, 185th\u00a0St and east side of Timberline neighborhood.\u00a0<\/strong><\/p>\n<ul style=\"text-align: left\">\n<li><strong>Please do not place heavy loads (Trailers, jacks, pallets, etc.) on the new asphalt pavement. While traveling on new asphalt, please keep speeds low and avoid sharp turning motions and spinning your tires in place. These will leave blemishes on the new asphalt.<\/strong><\/li>\n<li><strong>Avoid having children and animals on the new pavement until it cools down. The mix is installed at 275 &#8211; 350 degrees.\u00a0<\/strong><\/li>\n<\/ul>\n<p style=\"text-align: left\" align=\"left\">Paving crews have completed the overlay ton the milled roadways in\u00a0<strong>Ervin Industrial Dr, Enterprise Dr, Corporate Dr, and 185<sup>th<\/sup>\u00a0.<\/strong><\/p>\n<ul style=\"text-align: left\">\n<li><strong>Please do not place heavy loads (Trailers, jacks, pallets, etc.) on the new asphalt pavement. While traveling on new asphalt, please keep speeds low and avoid sharp turning motions and spinning your tires in place. These will leave blemishes on the new asphalt.<\/strong><\/li>\n<li><strong>Avoid having children and animals on the new pavement until it cools down. The mix is installed at 275 &#8211; 350 degrees.\u00a0<\/strong><\/li>\n<\/ul>\n<p style=\"text-align: left\" align=\"left\">Concrete crews have finished installing concrete curb and gutter along with pedestrian crossings in\u00a0<strong>Sawmill Woods and Bridle Creek\/Arbor View.<\/strong><\/p>\n<p style=\"text-align: left\" align=\"left\">The bituminous (blacktop) patching crew will install bituminous patches in front of the new curb and gutter in\u00a0<strong>Sawmill Woods\u00a0<\/strong>on Saturday, July 11<strong>.\u00a0<\/strong><\/p>\n<p style=\"text-align: left\" align=\"left\">Irrigation crews have continued repairing irrigation in\u00a0<strong>Bridle Creek\/Arbor View and Sawmill Woods.\u00a0<\/strong>They have completed repairs in these areas.<\/p>\n<p style=\"text-align: left\"><strong><u>Week of July 13<\/u><\/strong><\/p>\n<p style=\"text-align: left\" align=\"left\">Paving crews will begin to overlay the milled roadways on\u00a0<strong>the East side of Timberline Neighborhood.\u00a0<\/strong>Weather permitting, crews will plan to start overlaying new asphalt on Monday morning. Crews will then install overlay on the\u00a0<strong>Bridle Creek\/Arbor View,\u00a0<\/strong>starting as soon as Tuesday.<\/p>\n<ul style=\"text-align: left\">\n<li><strong>Please have all vehicle, trailers, and any items off of the roadways by 7 a.m. We will have to tow vehicles that are in the way of construction operations.\u00a0<\/strong><\/li>\n<\/ul>\n<p style=\"text-align: left\" align=\"left\">After areas are milled, a bituminous patching crew will place new bituminous material (blacktop) in areas that were milled down to the aggregate base. Once the areas are patched, then the new patch will match the grade of the milled roadway. Bituminous patching will take place in\u00a0<strong>Bridle Creek\/ArborView\u00a0<\/strong>area on Monday.<\/p>\n<ul style=\"text-align: left\">\n<li>These areas will be several inches lower than the existing pavement until the contractor begins patching the streets. Please be cautious while traveling in the area.<\/li>\n<\/ul>\n<p style=\"text-align: left\">Excavation of the new Hope Ave parking lot will begin mid-week.<\/p>\n<p style=\"text-align: left\" align=\"left\">Reclaim will take place at\u00a0<strong>Lincoln Ave\u00a0<\/strong>toward the end of the week, weather permitting. The day after reclaiming, crews will be paving\u00a0<strong>Lincoln Ave.\u00a0<\/strong><\/p>\n<p style=\"text-align: left\" align=\"left\">Crews will begin sawcutting curb and gutter along with sidewalks on\u00a0<strong>Hope Ave &amp; Park Drive,\u00a0<\/strong>starting as soon as Wednesday. The curb will not be removed until a later date.<\/p>\n<p style=\"text-align: left\"><strong><u>General Notes<\/u><\/strong><\/p>\n<p style=\"text-align: left\" align=\"left\">The contractor will be placing &#8220;No Parking&#8221; Signs in areas that will be getting milled and paved the night before the work takes place. Please be aware of these signs and do not park in these areas of roadway during this time. If you have questions, please reach out to the project team listed below.<\/p>\n<p style=\"text-align: left\" align=\"left\">The Project team will be putting out notices 1-2 days prior to paving activities with information regarding the new pavement. Please read and respect the recommendations listed on these notices.<\/p>\n<p style=\"text-align: left\" align=\"left\">If you need to drive over the fresh asphalt, please observe and listen to the directions given by the workers. Please keep your speed low to avoid spinning your tires and harsh turning motions. Please do not place heavy loads on new asphalt (including trailers and jacks) for 3 days.<\/p>\n<p>&nbsp;<\/p>\n<hr \/>\n<p>[\/vc_column_text][vc_column_text css=&#8221;.vc_custom_1777652138575{margin-top: 35px !important;}&#8221;]<\/p>\n<h3 style=\"text-align: center\">Sign Up for Project Updates<\/h3>\n<p>[\/vc_column_text][vc_raw_html css=&#8221;&#8221;]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[\/vc_raw_html][\/vc_column_inner][vc_column_inner width=&#8221;1\/5&#8243;][\/vc_column_inner][\/vc_row_inner][\/vc_column][\/vc_row][vc_row][vc_column][vc_single_image image=&#8221;2007&#8243; img_size=&#8221;large&#8221; alignment=&#8221;center&#8221; onclick=&#8221;custom_link&#8221; css_animation=&#8221;fadeInLeft&#8221; css=&#8221;.vc_custom_1760733213715{border-right-width: 0px !important;border-bottom-width: 0px !important;border-left-width: 0px !important;border-color: #ffffff !important;}&#8221; link=&#8221;https:\/\/clients.bolton-menk.com\/jordanengineering\/wp-content\/uploads\/sites\/44\/2025\/10\/JORD_Infrastructure_Improvements_ProjectArea_Overview_2026_11X17P.pdf&#8221;][vc_empty_space height=&#8221;20 px&#8221;][\/vc_column][\/vc_row][vc_row][vc_column width=&#8221;1\/5&#8243;][\/vc_column][vc_column width=&#8221;3\/5&#8243;][vc_column_text css=&#8221;&#8221;]<\/p>\n<hr \/>\n<h3 style=\"text-align: left\">Background<\/h3>\n<p class=\"BMIParagraphHeader\" style=\"text-align: left\">The City of Jordan is planning to make improvements to various streets and alleys during the summer of 2026 (see map above). The project design will be completed throughout the fall of 2025 and winter of 2026. The project is planned to go out for bid in the spring of 2026 and construction is expected to begin sometime after June 1st, 2026 and be completed by the fall of 2026. The project scope generally includes:<\/p>\n<p style=\"text-align: left\"><strong>Alleys<\/strong><\/p>\n<ul>\n<li style=\"text-align: left\">Grading\/drainage improvements<\/li>\n<li style=\"text-align: left\">The addition of storm sewers in areas where surface drainage cannot be achieved<\/li>\n<li style=\"text-align: left\">Concrete paving of the alley<\/li>\n<\/ul>\n<p style=\"text-align: left\"><strong>Street Resurfacing<\/strong><\/p>\n<ul>\n<li style=\"text-align: left\">Resurfacing of street pavement (method as noted in the map above)<\/li>\n<li style=\"text-align: left\">Spot removal and replacement of deficient curb and gutter segments<\/li>\n<li style=\"text-align: left\">Replacement of concrete pedestrian ramps for compliance with the Americans with Disabilities Act (ADA)<\/li>\n<\/ul>\n<p>[\/vc_column_text][vc_empty_space height=&#8221;20 px&#8221;][vc_column_text css=&#8221;&#8221;]<\/p>\n<hr \/>\n<h3 style=\"text-align: left\">Documents<\/h3>\n<ul>\n<li style=\"text-align: left\"><a href=\"https:\/\/clients.bolton-menk.com\/jordanengineering\/wp-content\/uploads\/sites\/44\/2026\/06\/2026_06_05_Construction-Newsletter-01_Start-of-Construction_2026-Infrastructure-Improvements.pdf\"><span data-olk-copy-source=\"MessageBody\">Project Newsletter (Start of Construction) &#8211; 6\/4\/26<\/span><\/a><\/li>\n<li style=\"text-align: left\"><span data-olk-copy-source=\"MessageBody\"><a href=\"https:\/\/jordan-mn.granicus.com\/GeneratedAgendaViewer.php?view_id=1&amp;clip_id=886\" target=\"_blank\" rel=\"noopener\">Council Meeting Content: 3A, 9A, 9B \u2013 Assessment Hearing, Adopting Assessments, Awarding Construction Contract &#8211; 5\/26\/26<\/a> <\/span><\/li>\n<li style=\"text-align: left\"><a href=\"https:\/\/youtu.be\/SqozAnS-24A\" target=\"_blank\" rel=\"noopener\">Pre-Recorded Public Information Presentation for 5\/19\/26 Public Info Meeting<\/a><\/li>\n<li style=\"text-align: left\"><a href=\"https:\/\/clients.bolton-menk.com\/jordanengineering\/wp-content\/uploads\/sites\/44\/2026\/05\/2026_05_09_Public-Info-Meeting-02_2026-Infrastructure-Improvements.pdf\">May 19<sup>th<\/sup>, 2026\u00a0Public Information Meeting invite<\/a><\/li>\n<li style=\"text-align: left\"><a href=\"https:\/\/jordan-mn.granicus.com\/GeneratedAgendaViewer.php?view_id=1&amp;event_id=2185\" target=\"_blank\" rel=\"noopener\">Council Meeting Content: 13D \u2013 Present Bids, Order Final Assessment Roll, Order Assessment Hearing &#8211; 4\/27\/26<\/a><\/li>\n<li style=\"text-align: left\"><a href=\"https:\/\/jordan-mn.granicus.com\/player\/clip\/789?view_id=1&amp;redirect=true\" target=\"_blank\" rel=\"noopener\">Council Meeting Content: 3A &#8211; Public Improvement Hearing and 9A \u2013 Order Final Plans &#8211; 01\/26\/2026<\/a><\/li>\n<li style=\"text-align: left\"><a href=\"https:\/\/clients.bolton-menk.com\/jordanengineering\/wp-content\/uploads\/sites\/44\/2026\/01\/2026_01_21_Public-Info-Meeting_2026-Infrastructure-Improvements.pdf\" target=\"_blank\" rel=\"noopener\">Public Information Meeting Invite &#8211; 01\/21\/2026<\/a><\/li>\n<li style=\"text-align: left\"><a href=\"https:\/\/clients.bolton-menk.com\/jordanengineering\/wp-content\/uploads\/sites\/44\/2026\/01\/Comment-Card_2026-Infrastructure-Imp.pdf\" target=\"_blank\" rel=\"noopener\">Public Information Meeting Comment Card &#8211; 01\/21\/2026<\/a><\/li>\n<li style=\"text-align: left\"><a href=\"https:\/\/youtu.be\/zed_2vT4mEc\" target=\"_blank\" rel=\"noopener\"><span data-olk-copy-source=\"MessageBody\">Pre-Recorded Public Information Presentation &#8211; 01\/21\/2026<\/span><\/a><\/li>\n<li style=\"text-align: left\"><a href=\"https:\/\/jordan-mn.granicus.com\/GeneratedAgendaViewer.php?view_id=1&amp;event_id=2138\" target=\"_blank\" rel=\"noopener\"><span data-olk-copy-source=\"MessageBody\">Council Meeting Content: 8A &#8211; Receive Feasibility Study and Order Public Improvement Hearing &#8211; 01\/12\/2026<\/span><\/a><\/li>\n<li style=\"text-align: left\"><a href=\"https:\/\/clients.bolton-menk.com\/jordanengineering\/wp-content\/uploads\/sites\/44\/2026\/01\/2026_Infrastructure-Improvements_Feasibility-Report.pdf\" target=\"_blank\" rel=\"noopener\">Feasibility Report<\/a><\/li>\n<li style=\"text-align: left\"><a href=\"https:\/\/clients.bolton-menk.com\/jordanengineering\/wp-content\/uploads\/sites\/44\/2025\/10\/JORD_Infrastructure_Improvements_ProjectArea_Overview_2026_11X17P.pdf\"><span data-olk-copy-source=\"MessageBody\">Overall Project Area map<\/span><\/a><\/li>\n<li class=\"x_MsoListParagraph\" style=\"text-align: left\"><a href=\"https:\/\/clients.bolton-menk.com\/jordanengineering\/wp-content\/uploads\/sites\/44\/2025\/10\/JORD_Infrastructure_Improvements_ProjectArea_Overview-Sub-Areas_2026_11X17L.pdf\">Project Sub-Areas Maps<\/a><\/li>\n<li class=\"x_MsoListParagraph\" style=\"text-align: left\"><a href=\"https:\/\/jordan-mn.granicus.com\/GeneratedAgendaViewer.php?view_id=1&amp;clip_id=773\" target=\"_blank\" rel=\"noopener\">Council Meeting Content: Authorization of Feasibility Study for 2026 Infrastructure Improvements &#8211; 10\/13\/2025 <\/a><\/li>\n<li class=\"x_MsoListParagraph\" style=\"text-align: left\"><a href=\"https:\/\/clients.bolton-menk.com\/jordanengineering\/wp-content\/uploads\/sites\/44\/2025\/10\/2026-Infrastructure-Improvements_Initiation-Letter-to-Residentsv2.pdf\">Project Initiation Letter to Residents<\/a><\/li>\n<li class=\"x_MsoListParagraph\" style=\"text-align: left\"><a href=\"https:\/\/clients.bolton-menk.com\/jordanengineering\/wp-content\/uploads\/sites\/44\/2025\/10\/2026-Questionairev2.pdf\">Preliminary Resident Questionnaire <em>(Print Version)<\/em><\/a><\/li>\n<li style=\"text-align: left\"><a href=\"https:\/\/tinyurl.com\/26infrastructure\" target=\"_blank\" rel=\"noopener\">Preliminary Resident Questionnaire <em>(Digital Version)<\/em><\/a><\/li>\n<\/ul>\n<p>[\/vc_column_text][vc_empty_space height=&#8221;20 px&#8221;][vc_column_text css=&#8221;&#8221;]<\/p>\n<hr \/>\n<h3 style=\"text-align: left\">Schedule<\/h3>\n<ul>\n<li style=\"text-align: left\"><strong>Fall 2025:<\/strong> Preliminary Data Collection<\/li>\n<li style=\"text-align: left\"><strong>November 2025 \u2013 January 2026:<\/strong> Preliminary Engineering<\/li>\n<li style=\"text-align: left\"><strong>January 2026:<\/strong> Public Open House #1<\/li>\n<li style=\"text-align: left\">J<strong>anuary \u2013 April 2026:<\/strong> Final Design<\/li>\n<li style=\"text-align: left\"><strong>April 2026:<\/strong> Bidding<\/li>\n<li style=\"text-align: left\"><strong>May 2026:<\/strong> Public Open House #2<\/li>\n<li style=\"text-align: left\"><strong>Summer 2026:<\/strong> Construction<\/li>\n<\/ul>\n<p>[\/vc_column_text][vc_empty_space height=&#8221;20 px&#8221;][vc_column_text css=&#8221;&#8221;]<\/p>\n<hr \/>\n<h3 style=\"text-align: left\">Contacts<\/h3>\n<p>[\/vc_column_text][vc_row_inner][vc_column_inner width=&#8221;1\/2&#8243;][vc_column_text css=&#8221;&#8221;]<\/p>\n<p style=\"text-align: left\"><strong>Luke Wheeler<br \/>\n<\/strong>City Engineer<br \/>\nBolton &amp; Menk<br \/>\n(612) 597-9105<br \/>\n<a href=\"mailto:Luke.Wheeler@bolton-menk.com\">Luke.Wheeler@bolton-menk.com<\/a><\/p>\n<p>[\/vc_column_text][\/vc_column_inner][vc_column_inner width=&#8221;1\/2&#8243;][vc_column_text css=&#8221;&#8221;][\/vc_column_text][\/vc_column_inner][\/vc_row_inner][\/vc_column][vc_column width=&#8221;1\/5&#8243;][\/vc_column][\/vc_row]<\/p>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>[vc_row][vc_column][vc_column_text css_animation=&#8221;fadeInUp&#8221; css=&#8221;&#8221;] 2026 Infrastructure Improvements [\/vc_column_text][vc_empty_space height=&#8221;30 px&#8221;][vc_row_inner][vc_column_inner width=&#8221;1\/5&#8243;][vc_empty_space height=&#8221;30 px&#8221;][\/vc_column_inner][vc_column_inner width=&#8221;3\/5&#8243;][vc_column_text css=&#8221;&#8221;] Construction Update July 10, 2026 Construction on the City of Jordan\u2019s 2026 Infrastructure Improvements project is ongoing, and the contractor is making great progress. Please see below for a summary of&#8230;<\/p>\n","protected":false},"author":31,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"inline_featured_image":false,"footnotes":""},"class_list":["post-1995","page","type-page","status-publish","hentry"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.0 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>2026 Infrastructure Improvements - City of Jordan MN Engineering<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/clients.bolton-menk.com\/jordanengineering\/2026-infrastructure-improvements\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"2026 Infrastructure Improvements - City of Jordan MN Engineering\" \/>\n<meta property=\"og:description\" content=\"[vc_row][vc_column][vc_column_text css_animation=&#8221;fadeInUp&#8221; css=&#8221;&#8221;] 2026 Infrastructure Improvements [\/vc_column_text][vc_empty_space height=&#8221;30 px&#8221;][vc_row_inner][vc_column_inner width=&#8221;1\/5&#8243;][vc_empty_space height=&#8221;30 px&#8221;][\/vc_column_inner][vc_column_inner width=&#8221;3\/5&#8243;][vc_column_text css=&#8221;&#8221;] Construction Update July 10, 2026 Construction on the City of Jordan\u2019s 2026 Infrastructure Improvements project is ongoing, and the contractor is making great progress. Please see below for a summary of...\" \/>\n<meta property=\"og:url\" content=\"https:\/\/clients.bolton-menk.com\/jordanengineering\/2026-infrastructure-improvements\/\" \/>\n<meta property=\"og:site_name\" content=\"City of Jordan MN Engineering\" \/>\n<meta property=\"article:modified_time\" content=\"2026-07-10T20:34:53+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"5 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/clients.bolton-menk.com\\\/jordanengineering\\\/2026-infrastructure-improvements\\\/\",\"url\":\"https:\\\/\\\/clients.bolton-menk.com\\\/jordanengineering\\\/2026-infrastructure-improvements\\\/\",\"name\":\"2026 Infrastructure Improvements - City of Jordan MN Engineering\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/clients.bolton-menk.com\\\/jordanengineering\\\/#website\"},\"datePublished\":\"2025-10-17T20:22:54+00:00\",\"dateModified\":\"2026-07-10T20:34:53+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/clients.bolton-menk.com\\\/jordanengineering\\\/2026-infrastructure-improvements\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/clients.bolton-menk.com\\\/jordanengineering\\\/2026-infrastructure-improvements\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/clients.bolton-menk.com\\\/jordanengineering\\\/2026-infrastructure-improvements\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/clients.bolton-menk.com\\\/jordanengineering\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"2026 Infrastructure Improvements\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/clients.bolton-menk.com\\\/jordanengineering\\\/#website\",\"url\":\"https:\\\/\\\/clients.bolton-menk.com\\\/jordanengineering\\\/\",\"name\":\"Marine on St. Croix Comp Plan\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/clients.bolton-menk.com\\\/jordanengineering\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"2026 Infrastructure Improvements - City of Jordan MN Engineering","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/clients.bolton-menk.com\/jordanengineering\/2026-infrastructure-improvements\/","og_locale":"en_US","og_type":"article","og_title":"2026 Infrastructure Improvements - City of Jordan MN Engineering","og_description":"[vc_row][vc_column][vc_column_text css_animation=&#8221;fadeInUp&#8221; css=&#8221;&#8221;] 2026 Infrastructure Improvements [\/vc_column_text][vc_empty_space height=&#8221;30 px&#8221;][vc_row_inner][vc_column_inner width=&#8221;1\/5&#8243;][vc_empty_space height=&#8221;30 px&#8221;][\/vc_column_inner][vc_column_inner width=&#8221;3\/5&#8243;][vc_column_text css=&#8221;&#8221;] Construction Update July 10, 2026 Construction on the City of Jordan\u2019s 2026 Infrastructure Improvements project is ongoing, and the contractor is making great progress. Please see below for a summary of...","og_url":"https:\/\/clients.bolton-menk.com\/jordanengineering\/2026-infrastructure-improvements\/","og_site_name":"City of Jordan MN Engineering","article_modified_time":"2026-07-10T20:34:53+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"5 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/clients.bolton-menk.com\/jordanengineering\/2026-infrastructure-improvements\/","url":"https:\/\/clients.bolton-menk.com\/jordanengineering\/2026-infrastructure-improvements\/","name":"2026 Infrastructure Improvements - City of Jordan MN Engineering","isPartOf":{"@id":"https:\/\/clients.bolton-menk.com\/jordanengineering\/#website"},"datePublished":"2025-10-17T20:22:54+00:00","dateModified":"2026-07-10T20:34:53+00:00","breadcrumb":{"@id":"https:\/\/clients.bolton-menk.com\/jordanengineering\/2026-infrastructure-improvements\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/clients.bolton-menk.com\/jordanengineering\/2026-infrastructure-improvements\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/clients.bolton-menk.com\/jordanengineering\/2026-infrastructure-improvements\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/clients.bolton-menk.com\/jordanengineering\/"},{"@type":"ListItem","position":2,"name":"2026 Infrastructure Improvements"}]},{"@type":"WebSite","@id":"https:\/\/clients.bolton-menk.com\/jordanengineering\/#website","url":"https:\/\/clients.bolton-menk.com\/jordanengineering\/","name":"Marine on St. Croix Comp Plan","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/clients.bolton-menk.com\/jordanengineering\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"}]}},"_links":{"self":[{"href":"https:\/\/clients.bolton-menk.com\/jordanengineering\/wp-json\/wp\/v2\/pages\/1995","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/clients.bolton-menk.com\/jordanengineering\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/clients.bolton-menk.com\/jordanengineering\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/clients.bolton-menk.com\/jordanengineering\/wp-json\/wp\/v2\/users\/31"}],"replies":[{"embeddable":true,"href":"https:\/\/clients.bolton-menk.com\/jordanengineering\/wp-json\/wp\/v2\/comments?post=1995"}],"version-history":[{"count":70,"href":"https:\/\/clients.bolton-menk.com\/jordanengineering\/wp-json\/wp\/v2\/pages\/1995\/revisions"}],"predecessor-version":[{"id":2191,"href":"https:\/\/clients.bolton-menk.com\/jordanengineering\/wp-json\/wp\/v2\/pages\/1995\/revisions\/2191"}],"wp:attachment":[{"href":"https:\/\/clients.bolton-menk.com\/jordanengineering\/wp-json\/wp\/v2\/media?parent=1995"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}