{"id":516,"date":"2024-03-19T18:29:56","date_gmt":"2024-03-19T18:29:56","guid":{"rendered":"https:\/\/clients.bolton-menk.com\/slwastewatermanagement\/?page_id=516"},"modified":"2026-06-02T21:43:50","modified_gmt":"2026-06-02T21:43:50","slug":"updates","status":"publish","type":"page","link":"https:\/\/clients.bolton-menk.com\/slwastewater\/updates\/","title":{"rendered":"Construction Updates"},"content":{"rendered":"<div class=\"wpb-content-wrapper\"><p>[vc_row][vc_column][vc_column_text]<\/p>\n<h2>Construction Updates<\/h2>\n<p>[\/vc_column_text]<div class=\"mkd-separator-holder clearfix  mkd-separator-center mkd-separator-full-width\">\n\t<div class=\"mkd-separator\" style=\"border-color: #f3a432;border-style: solid;border-bottom-width: 3px\"><\/div>\n<\/div>\n[vc_empty_space height=&#8221;15px&#8221;][vc_column_text css=&#8221;&#8221;]<\/p>\n<h2>June 2, 2026<\/h2>\n<p>King Construction has continued work on the Scout Park Lift Station building. Recently, crews have been installing and wiring electrical and control equipment inside the building. These systems will allow City staff to operate the lift station, monitor equipment performance, and receive alerts for any security or operational issues.<\/p>\n<p>Meanwhile, painting preparation is underway at the Scout Park wet well. A protective coating will be applied to the interior surface, which helps shield the concrete from the harsh conditions of wastewater and extends the structure\u2019s lifespan.<\/p>\n<p>Work at the Ice House site is expected to begin later this summer. The city is currently coordinating with MidAmerican Energy to reroute electrical lines prior to excavation. As work progresses, temporary road closures may be necessary. Please watch for updates and refer to the road closure map under the <a href=\"https:\/\/clients.bolton-menk.com\/slwastewater\/\">Traffic Notices<\/a> section of the <a href=\"https:\/\/clients.bolton-menk.com\/slwastewater\/\">Project Overview<\/a> page.[\/vc_column_text][vc_empty_space height=&#8221;15px&#8221;][vc_gallery interval=&#8221;0&#8243; images=&#8221;712,713,714&#8243; img_size=&#8221;large&#8221; css=&#8221;&#8221;][vc_empty_space height=&#8221;15px&#8221;][vc_column_text css=&#8221;&#8221;]<\/p>\n<h2>March 20, 2026<\/h2>\n<p>The Scout Park Lift Station building is progressing with installation of the face block, generator, and HVAC equipment. Sanitary sewer piping has been installed below grade to convey wastewater into the lift station wet well underground. Once the electrical and controls components of the lift are installed, started up, and tested, the final piping connections will be made.<\/p>\n<p>Work at the Ice House lift station will begin with electrical line adjustments in coordination with MidAmerican. Once they\u2019ve re-routed the electrical lines, they can begin excavation for the lift station installation. <strong>Note:<\/strong> The trail along the south side of Vista Drive will remain open during construction, despite the road closure on the southeast corner of Vista Drive.[\/vc_column_text][vc_empty_space height=&#8221;15px&#8221;][vc_gallery interval=&#8221;0&#8243; images=&#8221;696,698,699&#8243; img_size=&#8221;large&#8221; css=&#8221;&#8221;][vc_empty_space height=&#8221;15px&#8221;][vc_column_text css=&#8221;&#8221;]<\/p>\n<h2>March 2, 2026<\/h2>\n<p>The city will be completing critical work to the sanitary sewer infrastructure in the Vista Drive area. Construction has begun for the replacement of the sanitary sewer lift stations in Scout Park and on the southwest portion of Vista Drive. During construction, lane shifts and closures are planned for portions of Lighthouse Drive and Vista Drive. The new lift stations will improve the sanitary sewer capacity and prevent loss of service due to flood hazards. Thank you for your patience during construction.[\/vc_column_text][vc_empty_space height=&#8221;15px&#8221;][vc_column_text css=&#8221;&#8221;]<\/p>\n<h2>January 21, 2026<\/h2>\n<p>Have you been wondering what the greenhouse-like structure is at Scout Park? It&#8217;s the new lift station control building, and King Construction is pressing on through the winter months to complete construction. The greenhouse-like structure at the site is used to enclose the workspace and allow for climate control while the masons complete the walls. This building will house the generator and other electrical and controls components that are essential to operating the lift station. In the coming months, King Construction will be installing more underground piping at the Scout Park site.[\/vc_column_text][vc_empty_space height=&#8221;15px&#8221;][vc_gallery interval=&#8221;15&#8243; images=&#8221;686,684,685&#8243; img_size=&#8221;large&#8221; css=&#8221;&#8221;][vc_empty_space height=&#8221;15px&#8221;][vc_column_text css=&#8221;&#8221;]<\/p>\n<h2>September 25, 2025<\/h2>\n<p style=\"text-align: left\">Work on the Scout Park Lift Station continues! The lift station valve vault has been installed next to the wet well. This valve vault structure will house essential valves and piping for operating the lift station. As the valve vault concrete cures, King Construction works toward completion of footing and foundation installations at the electrical building. Alongside work on the below ground structures, King will begin installing underground piping connections to the new lift station.<\/p>\n<p>[\/vc_column_text][vc_empty_space height=&#8221;15px&#8221;][vc_gallery interval=&#8221;15&#8243; images=&#8221;681,680,679,678&#8243; img_size=&#8221;large&#8221; css=&#8221;&#8221;][vc_empty_space height=&#8221;15px&#8221;][vc_column_text css=&#8221;&#8221;]<\/p>\n<h2>August 12, 2025<\/h2>\n<p style=\"text-align: left\">The Lift Station at Scout Park is starting to take shape! The concrete wet well structure is nearly complete. This structure will receive sanitary flows from approximately 5,000 residents spread over almost 400 acres.<\/p>\n<p style=\"text-align: left\">After completing the wet well structure, King Construction will begin work on the valve vault, as well as piping installations throughout the site.<\/p>\n<p>[\/vc_column_text][vc_empty_space height=&#8221;15px&#8221;][vc_gallery interval=&#8221;15&#8243; images=&#8221;676,675,673&#8243; img_size=&#8221;large&#8221; css=&#8221;&#8221;][vc_empty_space height=&#8221;15px&#8221;][vc_column_text css=&#8221;&#8221;]<\/p>\n<h2>July 1, 2025<\/h2>\n<p>Construction is progressing on the Wastewater Infrastructure Mitigation Project! At Scout Park, excavation is complete for the lift station wet well structure. The contractor, King Construction, has installed the base slab and will continue with the rebar and concrete for the walls of the wet well. Once completed, this tank structure will house the pumps used to convey sanitary sewer downstream towards the wastewater treatment facility.<\/p>\n<p>At the Ice House site, concrete manhole structures are stored along Vista Drive, awaiting their installation in the coming months.[\/vc_column_text][vc_empty_space height=&#8221;15px&#8221;][vc_gallery interval=&#8221;15&#8243; images=&#8221;668,669,670,671&#8243; img_size=&#8221;large&#8221; css=&#8221;&#8221;][vc_empty_space height=&#8221;15px&#8221;][vc_column_text css=&#8221;&#8221;]<\/p>\n<h2>May 22, 2025<\/h2>\n<p>Construction has broken ground on the Scout Park and Ice House lift stations! King Construction has been staging materials on both sites and has begun excavation for portions of the new lift station structures. Road closures and lane closures are in place for portions of Vista Drive and Lighthouse Drive and will remain throughout construction. Erosion and pollution prevention materials have been installed around the site to protect surrounding areas from sediment runoff. These pollution prevention measures will be inspected and maintained throughout construction to protect our lake, homes, and park.[\/vc_column_text][vc_empty_space height=&#8221;15px&#8221;][vc_gallery interval=&#8221;10&#8243; images=&#8221;657,656&#8243; img_size=&#8221;large&#8221; css=&#8221;&#8221;][vc_empty_space height=&#8221;15px&#8221;][vc_column_text css=&#8221;&#8221;]<\/p>\n<h2>May 7, 2025<\/h2>\n<p>The Scout Park neighborhood meeting was rescheduled due to inclement weather, and was held on May 6 from 4-6 p.m.<\/p>\n<p>Construction has begun for the replacement of the sanitary sewer lift stations in Scout Park and on the southwest portion of Vista Drive. A portion of Vista Drive will be closed for the duration of the project (see closure map below). The bike path along Vista Drive will remain open.[\/vc_column_text][vc_empty_space height=&#8221;10px&#8221;][vc_single_image image=&#8221;646&#8243; img_size=&#8221;medium&#8221; css=&#8221;&#8221;][vc_empty_space height=&#8221;15px&#8221;][vc_column_text css=&#8221;&#8221;]<\/p>\n<h2>April 23, 2025<\/h2>\n<p>Construction will begin on the Storm Lake Wastewater Infrastructure Mitigation project.[\/vc_column_text][vc_empty_space height=&#8221;15px&#8221;][vc_column_text css=&#8221;&#8221;]<\/p>\n<h2>November 13, 2024<\/h2>\n<p>A neighborhood meeting was hosted to introduce the project and answer any questions. <strong><a href=\"https:\/\/clients.bolton-menk.com\/slwastewater\/wp-content\/uploads\/sites\/300\/2024\/11\/2024.11.13_NeighborhoodMeeting.pdf\">View the presentation slides<\/a><\/strong>.[\/vc_column_text][vc_empty_space height=&#8221;30px&#8221;][\/vc_column][\/vc_row]<\/p>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>[vc_row][vc_column][vc_column_text] Construction Updates [\/vc_column_text][vc_empty_space height=&#8221;15px&#8221;][vc_column_text css=&#8221;&#8221;] June 2, 2026 King Construction has continued work on the Scout Park Lift Station building. Recently, crews have been installing and wiring electrical and control equipment inside the building. These systems will allow City staff to operate the lift&#8230;<\/p>\n","protected":false},"author":3,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"inline_featured_image":false,"footnotes":""},"class_list":["post-516","page","type-page","status-publish","hentry"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.7 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Construction Updates - Storm Lake Wastewater Infrastructure Mitigation<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/clients.bolton-menk.com\/slwastewater\/updates\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Construction Updates - Storm Lake Wastewater Infrastructure Mitigation\" \/>\n<meta property=\"og:description\" content=\"[vc_row][vc_column][vc_column_text] Construction Updates [\/vc_column_text][vc_empty_space height=&#8221;15px&#8221;][vc_column_text css=&#8221;&#8221;] June 2, 2026 King Construction has continued work on the Scout Park Lift Station building. Recently, crews have been installing and wiring electrical and control equipment inside the building. These systems will allow City staff to operate the lift...\" \/>\n<meta property=\"og:url\" content=\"https:\/\/clients.bolton-menk.com\/slwastewater\/updates\/\" \/>\n<meta property=\"og:site_name\" content=\"Storm Lake Wastewater Infrastructure Mitigation\" \/>\n<meta property=\"article:modified_time\" content=\"2026-06-02T21:43:50+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"9 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/clients.bolton-menk.com\\\/slwastewater\\\/updates\\\/\",\"url\":\"https:\\\/\\\/clients.bolton-menk.com\\\/slwastewater\\\/updates\\\/\",\"name\":\"Construction Updates - Storm Lake Wastewater Infrastructure Mitigation\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/clients.bolton-menk.com\\\/slwastewater\\\/#website\"},\"datePublished\":\"2024-03-19T18:29:56+00:00\",\"dateModified\":\"2026-06-02T21:43:50+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/clients.bolton-menk.com\\\/slwastewater\\\/updates\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/clients.bolton-menk.com\\\/slwastewater\\\/updates\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/clients.bolton-menk.com\\\/slwastewater\\\/updates\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/clients.bolton-menk.com\\\/slwastewater\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Construction Updates\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/clients.bolton-menk.com\\\/slwastewater\\\/#website\",\"url\":\"https:\\\/\\\/clients.bolton-menk.com\\\/slwastewater\\\/\",\"name\":\"Marine on St. Croix Comp Plan\",\"description\":\"Home for the City of Chaska Downtown Highway 41 Project\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/clients.bolton-menk.com\\\/slwastewater\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Construction Updates - Storm Lake Wastewater Infrastructure Mitigation","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/clients.bolton-menk.com\/slwastewater\/updates\/","og_locale":"en_US","og_type":"article","og_title":"Construction Updates - Storm Lake Wastewater Infrastructure Mitigation","og_description":"[vc_row][vc_column][vc_column_text] Construction Updates [\/vc_column_text][vc_empty_space height=&#8221;15px&#8221;][vc_column_text css=&#8221;&#8221;] June 2, 2026 King Construction has continued work on the Scout Park Lift Station building. Recently, crews have been installing and wiring electrical and control equipment inside the building. These systems will allow City staff to operate the lift...","og_url":"https:\/\/clients.bolton-menk.com\/slwastewater\/updates\/","og_site_name":"Storm Lake Wastewater Infrastructure Mitigation","article_modified_time":"2026-06-02T21:43:50+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"9 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/clients.bolton-menk.com\/slwastewater\/updates\/","url":"https:\/\/clients.bolton-menk.com\/slwastewater\/updates\/","name":"Construction Updates - Storm Lake Wastewater Infrastructure Mitigation","isPartOf":{"@id":"https:\/\/clients.bolton-menk.com\/slwastewater\/#website"},"datePublished":"2024-03-19T18:29:56+00:00","dateModified":"2026-06-02T21:43:50+00:00","breadcrumb":{"@id":"https:\/\/clients.bolton-menk.com\/slwastewater\/updates\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/clients.bolton-menk.com\/slwastewater\/updates\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/clients.bolton-menk.com\/slwastewater\/updates\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/clients.bolton-menk.com\/slwastewater\/"},{"@type":"ListItem","position":2,"name":"Construction Updates"}]},{"@type":"WebSite","@id":"https:\/\/clients.bolton-menk.com\/slwastewater\/#website","url":"https:\/\/clients.bolton-menk.com\/slwastewater\/","name":"Marine on St. Croix Comp Plan","description":"Home for the City of Chaska Downtown Highway 41 Project","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/clients.bolton-menk.com\/slwastewater\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"}]}},"_links":{"self":[{"href":"https:\/\/clients.bolton-menk.com\/slwastewater\/wp-json\/wp\/v2\/pages\/516","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/clients.bolton-menk.com\/slwastewater\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/clients.bolton-menk.com\/slwastewater\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/clients.bolton-menk.com\/slwastewater\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/clients.bolton-menk.com\/slwastewater\/wp-json\/wp\/v2\/comments?post=516"}],"version-history":[{"count":61,"href":"https:\/\/clients.bolton-menk.com\/slwastewater\/wp-json\/wp\/v2\/pages\/516\/revisions"}],"predecessor-version":[{"id":715,"href":"https:\/\/clients.bolton-menk.com\/slwastewater\/wp-json\/wp\/v2\/pages\/516\/revisions\/715"}],"wp:attachment":[{"href":"https:\/\/clients.bolton-menk.com\/slwastewater\/wp-json\/wp\/v2\/media?parent=516"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}