{"id":330,"date":"2020-10-28T21:34:13","date_gmt":"2020-10-28T21:34:13","guid":{"rendered":"https:\/\/clients.bolton-menk.com\/waconiadowntown\/?page_id=330"},"modified":"2026-06-05T16:49:09","modified_gmt":"2026-06-05T16:49:09","slug":"projectupdates","status":"publish","type":"page","link":"https:\/\/clients.bolton-menk.com\/waconiadowntown\/projectupdates\/","title":{"rendered":"Project Updates"},"content":{"rendered":"<div class=\"wpb-content-wrapper\"><p>[vc_row][vc_column width=&#8221;2\/3&#8243;][vc_column_text css=&#8221;&#8221;]<\/p>\n<h3>Project Updates &#8211; June 5, 2026<\/h3>\n<p>This week in Stage 1, crews continued water and sanitary sewer installation work. Sidewalk removals, light and banner pole bases installations and watermain connections on Elm Street were completed.<\/p>\n<p>Next week, crews plan to continue installing light and banner pole bases. Work is also planned for storm sewer installations, street excavation and irrigation system installations.[\/vc_column_text][vc_column_text css=&#8221;&#8221;]Please contact our on-site project representative, Dalmas Omwoyo at <strong>651-728-0312<\/strong>, with any questions, property specific needs or accommodations.[\/vc_column_text][vc_empty_space height=&#8221;20&#8243;][vc_single_image image=&#8221;703&#8243; img_size=&#8221;full&#8221; add_caption=&#8221;yes&#8221; onclick=&#8221;img_link_large&#8221; img_link_target=&#8221;_blank&#8221; css=&#8221;&#8221;][vc_empty_space height=&#8221;60&#8243;][vc_column_text css=&#8221;&#8221;]<strong>May 29, 2026<\/strong><\/p>\n<p>This week crews continued sanitary sewer and water service work in Stage 1, and is expected to finish next week. As a reminder, water shutoffs may be necessary during this work. Properties will be notified in advance of any impacts. During the workday, crews will do their best to accommodate regular access.<\/p>\n<p>Next week, crews plan to work on storm sewer, sidewalk removals and light and banner pole base installation in Stage 1. <strong>Access to front doors will be limited during this work.<\/strong> Areas will be restored with temporary walking mats when complete. <strong>During the workday, crews will do their best to accommodate regular access.<\/strong>[\/vc_column_text][vc_empty_space height=&#8221;60&#8243;][vc_column_text css=&#8221;&#8221;]<strong>May 27, 2026<\/strong><\/p>\n<p>On <strong>Thursday, May 28 and Friday, May 29<\/strong>, crews will complete concrete maintenance work in the 2023 construction area (two blocks of Main Street and one block of Olive Street).<\/p>\n<p>During this time, some parking stalls and sidewalk segments will be temporarily blocked. Pedestrians will be directed to alternate routes.<\/p>\n<p>Once the work is completed, sidewalks and parking stalls will be restored to their original condition. However, any newly placed concrete will be marked off and remain closed for approximately 7 days to allow the concrete to harden.<\/p>\n<p>The time and day of concrete work is subject to change due to weather or contractor scheduling changes. Properties will receive further notice if such changes occur. We apologize for any inconvenience this may cause and appreciate your patience and understanding![\/vc_column_text][vc_empty_space height=&#8221;20&#8243;][vc_single_image image=&#8221;588&#8243; img_size=&#8221;full&#8221; add_caption=&#8221;yes&#8221; onclick=&#8221;img_link_large&#8221; img_link_target=&#8221;_blank&#8221; css=&#8221;&#8221;][vc_empty_space height=&#8221;60&#8243;][vc_column_text css=&#8221;&#8221;]<strong>May 22, 2026<\/strong><\/p>\n<p>This week crews finished installing the sewer and water mains on Stage 1. Late this week crews began installing sewer and water services on Stage 1. This work began on First Street at Olive Street and will continue to the east for all of next week.<\/p>\n<p><strong>Reminder<\/strong>: Water shutoffs may be necessary during this work. Properties will be notified in advance of any impacts. During the workday, crews will do their best to accommodate regular access.[\/vc_column_text][vc_empty_space height=&#8221;60&#8243;][vc_column_text css=&#8221;&#8221;]<strong>May 15, 2026<\/strong><\/p>\n<p>Stage 1 watermain work continued and is almost complete up to Pine Street. Watermain testing will occur in the coming days with water service work beginning late next week or the week of May 26.<\/p>\n<p>Water shutoffs may be necessary during this work. Properties will be notified in advance of any impacts. During the workday, crews will do their best to accommodate regular access.[\/vc_column_text][vc_empty_space height=&#8221;60&#8243;][vc_column_text css=&#8221;&#8221;]<strong>May 7, 2026<\/strong><\/p>\n<p>This week, crews completed roadway removals in the Stage 1 area and started sanitary sewer work between Olive Street and Pine Street. Over the coming week, crews will begin watermain installation in the Stage 1 area.<\/p>\n<p>Xcel Energy was also on site this week to remove and relocate poles on 1st Street and 2nd Street that conflict with future construction activities.<\/p>\n<p>During utility connection work, water may need to be turned off to some properties to connect it to the existing water system. The affected properties will be notified prior to these occurrences. During the workday, crews will work to accommodate regular access as much as possible.[\/vc_column_text][vc_empty_space height=&#8221;60&#8243;][\/vc_column][vc_column width=&#8221;1\/3&#8243;][vc_column_text css=&#8221;&#8221;]<\/p>\n<p style=\"margin-top: 0pt;margin-bottom: 19pt;font-family: Poppins;font-size: 10.5pt;color: #20345e\"><span style=\"font-weight: bold;background: #E0E0E0\">PROJECT EMAIL\/TEXT UPDATES<\/span><\/p>\n<p>[\/vc_column_text]<a href=\"https:\/\/public.govdelivery.com\/accounts\/MNBOLTONMENK\/subscriber\/new?topic_id=MNBOLTONMENK_99\"\n   target=\"_self\"  class=\"mkd-btn mkd-btn-solid mkd-btn-medium mkd-btn-hover-solid\"  >\n\t<span class=\"mkd-btn-text\">Sign me up!<\/span>\n\t\n\t\n\t<\/a>[vc_empty_space height=&#8221;62px&#8221;][vc_column_text css=&#8221;&#8221;]<\/p>\n<p style=\"margin-top: 0pt;margin-bottom: 19pt;font-family: Poppins;font-size: 10.5pt;color: #20345e\"><span style=\"font-weight: bold;background: #E0E0E0\">CONTACT<\/span><\/p>\n<p style=\"margin-top: 7pt;margin-bottom: 7pt;font-family: Roboto;font-size: 10.5pt;color: black\"><span style=\"font-weight: bold\">JON HAUKAAS, DIRECTOR OF PUBLIC SERVICES<\/span><\/p>\n<p style=\"margin-top: 7pt;margin-bottom: 7pt;font-family: Roboto;font-size: 10.5pt;color: black\">City of Waconia<\/p>\n<p style=\"margin-top: 7pt;margin-bottom: 7pt\"><a href=\"mailto:jhaukaas@waconia.org\"><span style=\"font-family: Roboto;font-size: 10.5pt\">jhaukaas@waconia.org<\/span><\/a><\/p>\n<p style=\"margin-top: 7pt;margin-bottom: 7pt;font-family: Roboto;font-size: 10.5pt;color: black\">952-442-4265<\/p>\n<p>&nbsp;<\/p>\n<p style=\"margin-top: 7pt;margin-bottom: 7pt;font-family: Roboto;font-size: 10.5pt;color: black\"><span style=\"font-weight: bold\">COLTON LEE, PROJECT MANAGER<\/span><\/p>\n<p style=\"margin-top: 7pt;margin-bottom: 7pt;font-family: Roboto;font-size: 10.5pt;color: black\">Bolton &amp; Menk, Inc.<\/p>\n<p style=\"margin-top: 7pt;margin-bottom: 7pt\"><a href=\"mailto:colton.lee@bolton-menk.com\"><span style=\"font-family: Roboto;font-size: 10.5pt\">colton.lee@bolton-menk.com<\/span><\/a><\/p>\n<p style=\"margin-top: 7pt;margin-bottom: 7pt;font-family: Roboto;font-size: 10.5pt;color: black\">612-346-6059<\/p>\n<p>&nbsp;<\/p>\n<p style=\"margin-top: 7pt;margin-bottom: 7pt;font-family: Roboto;font-size: 10.5pt;color: black\"><span style=\"font-weight: bold\">JAKE SAULSBURY, P.E., CITY ENGINEER<\/span><\/p>\n<p style=\"margin-top: 7pt;margin-bottom: 7pt;font-family: Roboto;font-size: 10.5pt;color: black\">Bolton &amp; Menk, Inc.<\/p>\n<p style=\"margin-top: 7pt;margin-bottom: 7pt\"><a href=\"mailto:jake.saulsbury@bolton-menk.com\"><span style=\"font-family: Roboto;font-size: 10.5pt\">jake.saulsbury@bolton-menk.com<\/span><\/a><\/p>\n<p style=\"margin-top: 7pt;margin-bottom: 7pt;font-family: Roboto;font-size: 10.5pt;color: black\">612-756-4319<\/p>\n<p>[\/vc_column_text][vc_empty_space][vc_column_text css=&#8221;&#8221;]<\/p>\n<p style=\"margin-top: 0pt;margin-bottom: 19pt;font-family: Poppins;font-size: 10.5pt;color: #20345e\"><span style=\"font-weight: bold;background: #E0E0E0\">PROJECT DOCUMENTS<\/span><\/p>\n<p style=\"margin-top: 7pt;margin-bottom: 0pt\"><a href=\"https:\/\/clients.bolton-menk.com\/waconiadowntown\/wp-content\/uploads\/sites\/137\/2022\/11\/Downtown-Reconstruction-Phase-1-Feasibility-Study-Reduced-Size.pdf\"><span style=\"font-weight: bold;font-family: Roboto;font-size: 10.5pt;background: #E0E0E0\">September 2022 Downtown Reconstruction, Phase 1 Project Feasibility Study<\/span><\/a><\/p>\n<p><a href=\"https:\/\/clients.bolton-menk.com\/waconiadowntown\/wp-content\/uploads\/sites\/137\/2023\/12\/2023-08-15-Downtown-Recon-Ph-2-Feasibility-Report-reduced_compressed.pdf\" target=\"_blank\" rel=\"noopener\"><span style=\"font-weight: bold;font-family: Roboto;font-size: 10.5pt;background: #E0E0E0\">August 2023 Downtown Reconstruction, Phase 2 Project Feasibility Study<\/span><\/a><\/p>\n<p><a href=\"https:\/\/clients.bolton-menk.com\/waconiadowntown\/wp-content\/uploads\/sites\/137\/2025\/01\/133737-Downtown-Reconstruction-Phase-3-Feasibility-Study-Reduced.pdf\"><span style=\"font-weight: bold;font-family: Roboto;font-size: 10.5pt;background: #E0E0E0\">December 2024 Downtown Reconstruction, Phase 3 Project Feasibility Study<\/span><\/a><\/p>\n<p><a href=\"https:\/\/clients.bolton-menk.com\/waconiadowntown\/wp-content\/uploads\/sites\/137\/2025\/08\/2025-08-12-Downtown-Recon-Ph-4-Feasibility-Study-FINAL_compressed.pdf\" target=\"_blank\" rel=\"noopener\"><span style=\"font-weight: bold;font-family: Roboto;font-size: 10.5pt;background: #E0E0E0\">August 2025 Downtown Reconstruction, Phase 4 Project Feasibility Study<\/span><\/a><\/p>\n<p><span style=\"font-weight: bold;font-family: Roboto;font-size: 10.5pt;background: #E0E0E0\">Phase 4 Project Winter 2025\/26 Open House<\/span><\/p>\n<ul>\n<li style=\"list-style-type: none\">\n<ul>\n<li><a href=\"https:\/\/clients.bolton-menk.com\/wp-content\/uploads\/2026\/01\/2026-01-07-Project-Background-Info.pdf\" target=\"_blank\" rel=\"noopener\"><span style=\"font-weight: bold;font-family: Roboto;font-size: 10.5pt;background: #E0E0E0\">Project Background Information<\/span><\/a><\/li>\n<li><a href=\"https:\/\/clients.bolton-menk.com\/wp-content\/uploads\/2026\/01\/Overall-Staging-Board.pdf\" target=\"_blank\" rel=\"noopener\"><span style=\"font-weight: bold;font-family: Roboto;font-size: 10.5pt;background: #E0E0E0\">Overall Staging Board<\/span><\/a><\/li>\n<li><a href=\"https:\/\/clients.bolton-menk.com\/wp-content\/uploads\/2026\/01\/Overall-Street-Utility-Board.pdf\" target=\"_blank\" rel=\"noopener\"><span style=\"font-weight: bold;font-family: Roboto;font-size: 10.5pt;background: #E0E0E0\">Overall Street &amp; Utility Board<\/span><\/a><\/li>\n<\/ul>\n<\/li>\n<\/ul>\n<p>[\/vc_column_text][\/vc_column][\/vc_row]<\/p>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>[vc_row][vc_column width=&#8221;2\/3&#8243;][vc_column_text css=&#8221;&#8221;] Project Updates &#8211; June 5, 2026 This week in Stage 1, crews continued water and sanitary sewer installation work. Sidewalk removals, light and banner pole bases installations and watermain connections on Elm Street were completed. Next week, crews plan to continue installing&#8230;<\/p>\n","protected":false},"author":3,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"inline_featured_image":false,"footnotes":""},"class_list":["post-330","page","type-page","status-publish","hentry"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.7 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Project Updates - Waconia Downtown Reconstruction Project<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/clients.bolton-menk.com\/waconiadowntown\/projectupdates\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Project Updates - Waconia Downtown Reconstruction Project\" \/>\n<meta property=\"og:description\" content=\"[vc_row][vc_column width=&#8221;2\/3&#8243;][vc_column_text css=&#8221;&#8221;] Project Updates &#8211; June 5, 2026 This week in Stage 1, crews continued water and sanitary sewer installation work. Sidewalk removals, light and banner pole bases installations and watermain connections on Elm Street were completed. Next week, crews plan to continue installing...\" \/>\n<meta property=\"og:url\" content=\"https:\/\/clients.bolton-menk.com\/waconiadowntown\/projectupdates\/\" \/>\n<meta property=\"og:site_name\" content=\"Waconia Downtown Reconstruction Project\" \/>\n<meta property=\"article:modified_time\" content=\"2026-06-05T16:49:09+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"4 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/clients.bolton-menk.com\\\/waconiadowntown\\\/projectupdates\\\/\",\"url\":\"https:\\\/\\\/clients.bolton-menk.com\\\/waconiadowntown\\\/projectupdates\\\/\",\"name\":\"Project Updates - Waconia Downtown Reconstruction Project\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/clients.bolton-menk.com\\\/waconiadowntown\\\/#website\"},\"datePublished\":\"2020-10-28T21:34:13+00:00\",\"dateModified\":\"2026-06-05T16:49:09+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/clients.bolton-menk.com\\\/waconiadowntown\\\/projectupdates\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/clients.bolton-menk.com\\\/waconiadowntown\\\/projectupdates\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/clients.bolton-menk.com\\\/waconiadowntown\\\/projectupdates\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/clients.bolton-menk.com\\\/waconiadowntown\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Project Updates\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/clients.bolton-menk.com\\\/waconiadowntown\\\/#website\",\"url\":\"https:\\\/\\\/clients.bolton-menk.com\\\/waconiadowntown\\\/\",\"name\":\"Marine on St. Croix Comp Plan\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/clients.bolton-menk.com\\\/waconiadowntown\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Project Updates - Waconia Downtown Reconstruction Project","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/clients.bolton-menk.com\/waconiadowntown\/projectupdates\/","og_locale":"en_US","og_type":"article","og_title":"Project Updates - Waconia Downtown Reconstruction Project","og_description":"[vc_row][vc_column width=&#8221;2\/3&#8243;][vc_column_text css=&#8221;&#8221;] Project Updates &#8211; June 5, 2026 This week in Stage 1, crews continued water and sanitary sewer installation work. Sidewalk removals, light and banner pole bases installations and watermain connections on Elm Street were completed. Next week, crews plan to continue installing...","og_url":"https:\/\/clients.bolton-menk.com\/waconiadowntown\/projectupdates\/","og_site_name":"Waconia Downtown Reconstruction Project","article_modified_time":"2026-06-05T16:49:09+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"4 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/clients.bolton-menk.com\/waconiadowntown\/projectupdates\/","url":"https:\/\/clients.bolton-menk.com\/waconiadowntown\/projectupdates\/","name":"Project Updates - Waconia Downtown Reconstruction Project","isPartOf":{"@id":"https:\/\/clients.bolton-menk.com\/waconiadowntown\/#website"},"datePublished":"2020-10-28T21:34:13+00:00","dateModified":"2026-06-05T16:49:09+00:00","breadcrumb":{"@id":"https:\/\/clients.bolton-menk.com\/waconiadowntown\/projectupdates\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/clients.bolton-menk.com\/waconiadowntown\/projectupdates\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/clients.bolton-menk.com\/waconiadowntown\/projectupdates\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/clients.bolton-menk.com\/waconiadowntown\/"},{"@type":"ListItem","position":2,"name":"Project Updates"}]},{"@type":"WebSite","@id":"https:\/\/clients.bolton-menk.com\/waconiadowntown\/#website","url":"https:\/\/clients.bolton-menk.com\/waconiadowntown\/","name":"Marine on St. Croix Comp Plan","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/clients.bolton-menk.com\/waconiadowntown\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"}]}},"_links":{"self":[{"href":"https:\/\/clients.bolton-menk.com\/waconiadowntown\/wp-json\/wp\/v2\/pages\/330","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/clients.bolton-menk.com\/waconiadowntown\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/clients.bolton-menk.com\/waconiadowntown\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/clients.bolton-menk.com\/waconiadowntown\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/clients.bolton-menk.com\/waconiadowntown\/wp-json\/wp\/v2\/comments?post=330"}],"version-history":[{"count":172,"href":"https:\/\/clients.bolton-menk.com\/waconiadowntown\/wp-json\/wp\/v2\/pages\/330\/revisions"}],"predecessor-version":[{"id":718,"href":"https:\/\/clients.bolton-menk.com\/waconiadowntown\/wp-json\/wp\/v2\/pages\/330\/revisions\/718"}],"wp:attachment":[{"href":"https:\/\/clients.bolton-menk.com\/waconiadowntown\/wp-json\/wp\/v2\/media?parent=330"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}