{"id":21,"date":"2021-01-29T03:25:07","date_gmt":"2021-01-29T03:25:07","guid":{"rendered":"https:\/\/clients.bolton-menk.com\/chaskaimprovements\/?page_id=21"},"modified":"2026-06-05T20:41:42","modified_gmt":"2026-06-05T20:41:42","slug":"home","status":"publish","type":"page","link":"https:\/\/clients.bolton-menk.com\/weaverlakeroad\/","title":{"rendered":"Home"},"content":{"rendered":"<div class=\"wpb-content-wrapper\"><p>[vc_row][vc_column width=&#8221;2\/3&#8243;][vc_column_text css=&#8221;&#8221;]<\/p>\n<h2>Project Update: June 5, 2026<\/h2>\n<h4>Completed Work<\/h4>\n<p><strong>Tarleton Crest to West Fish Lake Road<\/strong><\/p>\n<ul>\n<li>Completed removals on the westbound lanes.<\/li>\n<li>Completed spot utility work.<\/li>\n<li>Began pouring concrete curb and gutter.<\/li>\n<\/ul>\n<h4>What to Expect Next Week<\/h4>\n<p><strong>Tarleton Crest to West Fish Lake Road<\/strong><\/p>\n<ul>\n<li>Prepare and pave the westbound lanes.<\/li>\n<li>Sanitary sewer work will continue along West Fish Lake Road, which will require trenching and excavation.<\/li>\n<li>North side residents should continue using the first neighborhood entrance in their direction of travel to access the area:\n<ul>\n<li>Eastbound drivers should use Shadow Creek Road.<\/li>\n<li>Westbound drivers should use Niagara Lane.<\/li>\n<li>If one entrance is temporarily closed, the other will remain open. Please use caution when entering or leaving side streets, as a slight bump may be present.<\/li>\n<\/ul>\n<\/li>\n<\/ul>\n<p><strong>Reminder<\/strong>: Drivers may encounter flagging operations at times to help keep traffic moving safely. Please use caution and expect brief delays when traveling through the area.<\/p>\n<h4>Private Utility Work is Complete<\/h4>\n<p>Private utility work has concluded. Crews may still appear on site to finish restoring disturbed areas or for routine maintenance.[\/vc_column_text][vc_empty_space height=&#8221;15&#8243;][vc_single_image image=&#8221;788&#8243; img_size=&#8221;large&#8221; onclick=&#8221;img_link_large&#8221; img_link_target=&#8221;_blank&#8221; css=&#8221;&#8221;][vc_empty_space height=&#8221;15&#8243;][vc_single_image image=&#8221;773&#8243; img_size=&#8221;large&#8221; add_caption=&#8221;yes&#8221; onclick=&#8221;img_link_large&#8221; img_link_target=&#8221;_blank&#8221; css=&#8221;&#8221;][vc_empty_space height=&#8221;50&#8243;][vc_zigzag][vc_empty_space height=&#8221;30&#8243;][vc_column_text css=&#8221;&#8221;]<\/p>\n<h2>Project Overview<\/h2>\n<p>Weaver Lake Rd. between Maple Grove Pkwy. and E Fish Lake Rd. is scheduled for improvements in 2026 due to the pavement age and poor condition. It is anticipated that the project will involve completely removing (reclaiming) the existing pavement and paving a new roadway surface. <span class=\"comment-text\">Rehabilitating the roadway is part of the City&#8217;s ongoing pavement management strategy to maintain high quality roadways. <\/span><\/p>\n<p>The need for pavement rehabilitation is an opportunity to identify and address additional traffic flow and pedestrian\/bicycle safety concerns in the area. <span class=\"comment-text\">Throughout the duration of the project, <\/span>the project team will be collecting feedback from the people who live, work, and travel through the project area to understand what additional improvements the team should consider. More information will be provided as it is confirmed; to be notified of project updates including feedback opportunities, sign up for project email or text updates.[\/vc_column_text][vc_empty_space height=&#8221;50&#8243;][vc_single_image image=&#8221;702&#8243; img_size=&#8221;large&#8221; add_caption=&#8221;yes&#8221; onclick=&#8221;img_link_large&#8221; img_link_target=&#8221;_blank&#8221; css=&#8221;&#8221;][vc_empty_space height=&#8221;30&#8243;][\/vc_column][vc_column width=&#8221;1\/3&#8243; css=&#8221;.vc_custom_1649968586529{padding-left: 50px !important;}&#8221;][vc_column_text]<\/p>\n<h4>Contact<\/h4>\n<hr \/>\n<h4><\/h4>\n<p>[\/vc_column_text][vc_column_text css=&#8221;&#8221;]<strong>Tim Adler<\/strong><br \/>\nConstruction Engineer<br \/>\n952-679-0675<br \/>\n<a href=\"mailto:tim.adler@bolton-menk.com\" target=\"_blank\" rel=\"noopener\">tim.adler@bolton-menk.com<\/a><\/p>\n<p><strong>RJ Kakach<\/strong><br \/>\nCity Engineer<br \/>\n763-494-6350<br \/>\n<a href=\"mailto:rjkakach@maplegrovemn.gov\">rjkakach@maplegrovemn.gov<\/a><\/p>\n<p><strong>Eric Seaburg<\/strong><br \/>\nConsultant Design Engineer<br \/>\n763-732-8751<br \/>\n<a href=\"mailto:eric.seaburg@bolton-menk.com\">eric.seaburg@bolton-menk.com<\/a>[\/vc_column_text][vc_empty_space][vc_column_text css=&#8221;&#8221;]<\/p>\n<h4>Project Email and Text Updates<\/h4>\n<hr \/>\n<h4><\/h4>\n<p>[\/vc_column_text][vc_raw_html css=&#8221;&#8221;]JTNDc3R5bGUlMjB0eXBlJTNEJTIydGV4dCUyRmNzcyUyMiUzRSUwQS5tYXhidXR0b24lMjAlN0IlMEElMjAlMjBwb3NpdGlvbiUzQSUyMHJlbGF0aXZlJTNCJTBBJTIwJTIwdGV4dC1kZWNvcmF0aW9uJTNBJTIwbm9uZSUzQiUwQSUyMCUyMGRpc3BsYXklM0ElMjBpbmxpbmUtYmxvY2slM0IlMEElMjAlMjB2ZXJ0aWNhbC1hbGlnbiUzQSUyMG1pZGRsZSUzQiUwQSUyMCUyMHdpZHRoJTNBJTIwMTYwcHglM0IlMEElMjAlMjBoZWlnaHQlM0ElMjA1MHB4JTNCJTBBJTIwJTIwYm9yZGVyJTNBJTIwMnB4JTIwc29saWQlMjAlMjNlNzVhMjUlM0IlMEElMjAlMjBib3JkZXItcmFkaXVzJTNBJTIwNHB4JTIwNHB4JTIwNHB4JTIwNHB4JTNCJTBBJTIwJTIwYmFja2dyb3VuZC1jb2xvciUzQSUyMCUyM2U3NWEyNSUzQiUwQSUyMCUyMGJveC1zaGFkb3clM0ElMjAwcHglMjAwcHglMjAycHglMjAwcHglMjAlMjMzMzMzMzMlM0IlMEElN0QlMEEubWF4YnV0dG9uJTNBaG92ZXIlMjAlN0IlMEElMjAlMjBib3JkZXItY29sb3IlM0ElMjAlMjNlNzVhMjUlM0IlMEElMjAlMjBiYWNrZ3JvdW5kLWNvbG9yJTNBJTIwd2hpdGUlM0IlMEElMjAlMjBib3gtc2hhZG93JTNBJTIwMHB4JTIwMHB4JTIwMnB4JTIwMHB4JTIwJTIzMzMzMzMzJTNCJTBBJTdEJTBBLm1heGJ1dHRvbiUyMC5tYi10ZXh0JTIwJTdCJTBBJTIwJTIwY29sb3IlM0ElMjAlMjNmZmZmZmYlM0IlMEElMjAlMjBmb250LWZhbWlseSUzQSUyMFZlcmRhbmElM0IlMEElMjAlMjBmb250LXNpemUlM0ElMjAxNnB4JTNCJTBBJTIwJTIwdGV4dC1hbGlnbiUzQSUyMGNlbnRlciUzQiUwQSUyMCUyMGZvbnQtc3R5bGUlM0ElMjBub3JtYWwlM0IlMEElMjAlMjBmb250LXdlaWdodCUzQSUyMG5vcm1hbCUzQiUwQSUyMCUyMGxpbmUtaGVpZ2h0JTNBJTIwMWVtJTNCJTBBJTIwJTIwYm94LXNpemluZyUzQSUyMGJvcmRlci1ib3glM0IlMEElMjAlMjBkaXNwbGF5JTNBJTIwYmxvY2slM0IlMEElMjAlMjBiYWNrZ3JvdW5kLWNvbG9yJTNBJTIwdW5zZXQlM0IlMEElMjAlMjBwb3NpdGlvbiUzQSUyMHJlbGF0aXZlJTNCJTBBJTIwJTIwcGFkZGluZyUzQSUyMDEzcHglMjAwcHglMjAwcHglMjAwcHglM0IlMEElN0QlMEEubWF4YnV0dG9uJTNBaG92ZXIlMjAubWItdGV4dCUyMCU3QiUwQSUyMCUyMGNvbG9yJTNBJTIwJTIzZTc1YTI1JTNCJTBBJTdEJTBBJTNDJTJGc3R5bGUlM0UlMEElM0NhJTIwY2xhc3MlM0QlMjJtYXhidXR0b24lMjIlMjB0YXJnZXQlM0QlMjJfYmxhbmslMjIlMjByZWwlM0QlMjJub29wZW5lciUyMiUyMGhyZWYlM0QlMjJodHRwcyUzQSUyRiUyRnB1YmxpYy5nb3ZkZWxpdmVyeS5jb20lMkZhY2NvdW50cyUyRk1OQk9MVE9OTUVOSyUyRnN1YnNjcmliZXIlMkZuZXclM0Z0b3BpY19pZCUzRE1OQk9MVE9OTUVOS18zMDAlMjZwb3AlM0R0JTIyJTIwZGF0YS1tYXhidXR0b25jb3VudGVyJTNEJTIyJTdCJTI2cXVvdCUzQmJ1dHRvbl9pZCUyNnF1b3QlM0IlM0E3MDcxNDUlMkMlMjZxdW90JTNCdXJsJTI2cXVvdCUzQiUzQSUyNnF1b3QlM0JodHRwcyUzQSU1QyUyRiU1QyUyRnB1YmxpYy5nb3ZkZWxpdmVyeS5jb20lNUMlMkZhY2NvdW50cyU1QyUyRk1OQk9MVE9OTUVOSyU1QyUyRnN1YnNjcmliZXIlNUMlMkZuZXclM0Z0b3BpY19pZCUzRE1OQk9MVE9OTUVOS18zMDAlMjklMjZxdW90JTNCJTJDJTI2cXVvdCUzQmNoZWNrJTI2cXVvdCUzQiUzQSUyNnF1b3QlM0JpYUVLLWdFSSUyNnF1b3QlM0IlN0QlMjIlMjBkYXRhLW1heGJ1dHRvbnBhZ2UlM0QlMjIlN0IlMjZxdW90JTNCaWQlMjZxdW90JTNCJTNBZmFsc2UlMkMlMjZxdW90JTNCdHlwZSUyNnF1b3QlM0IlM0FmYWxzZSU3RCUyMiUzRSUzQ3NwYW4lMjBjbGFzcyUzRCUyN21iLXRleHQlMjclMjAlM0VTaWduJTIwbWUlMjB1cCUyMSUzQyUyRnNwYW4lM0UlM0MlMkZhJTNF[\/vc_raw_html][vc_empty_space][vc_column_text css=&#8221;&#8221;]<\/p>\n<h4>Open House Materials<\/h4>\n<hr \/>\n<h4><\/h4>\n<p>[\/vc_column_text][vc_column_text css=&#8221;&#8221;]<strong>January 2026<\/strong><\/p>\n<ul>\n<li><a href=\"https:\/\/clients.bolton-menk.com\/wp-content\/uploads\/2026\/01\/2026-01-07_OH-Weaver-Boards.pdf\">Informational boards<\/a><\/li>\n<li><a href=\"https:\/\/clients.bolton-menk.com\/wp-content\/uploads\/2026\/01\/2026-01-07-134687-Open-House-Project-Figure.pdf\">Open house project figure<\/a><\/li>\n<li><a href=\"https:\/\/clients.bolton-menk.com\/weaverlakeroad\/wp-content\/uploads\/sites\/278\/2025\/06\/2025-03-24-134687-Weaver-Lake-Road-Proposed-Improvements_compressed.pdf\" target=\"_blank\" rel=\"noopener\">Approved design<\/a><\/li>\n<\/ul>\n<p>[\/vc_column_text][vc_column_text css=&#8221;&#8221;]<strong>February 2025<\/strong><\/p>\n<ul>\n<li><a href=\"https:\/\/clients.bolton-menk.com\/weaverlakeroad\/wp-content\/uploads\/sites\/278\/2025\/02\/2025-02-25_OH-Boards_FINAL-Reduced.pdf\" target=\"_blank\" rel=\"noopener\">Informational boards<\/a><\/li>\n<li><a href=\"https:\/\/gis.bolton-menk.com\/inputid\/?app=WeaverLakeRd\" target=\"_blank\" rel=\"noopener\">Comment Map<\/a><\/li>\n<li><a href=\"https:\/\/clients.bolton-menk.com\/weaverlakeroad\/wp-content\/uploads\/sites\/278\/2025\/04\/Weaver-Lake-OH-Summary.pdf\" target=\"_blank\" rel=\"noopener\">Summary of feedback received<\/a><\/li>\n<\/ul>\n<p>[\/vc_column_text][\/vc_column][vc_column][\/vc_column][vc_column][\/vc_column][\/vc_row]<\/p>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>[vc_row][vc_column width=&#8221;2\/3&#8243;][vc_column_text css=&#8221;&#8221;] Project Update: June 5, 2026 Completed Work Tarleton Crest to West Fish Lake Road Completed removals on the westbound lanes. Completed spot utility work. Began pouring concrete curb and gutter. What to Expect Next Week Tarleton Crest to West Fish Lake Road&#8230;<\/p>\n","protected":false},"author":3,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"inline_featured_image":false,"footnotes":""},"class_list":["post-21","page","type-page","status-publish","hentry"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.7 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Home - Maple Grove - Weaver Lake Road Improvements<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/clients.bolton-menk.com\/weaverlakeroad\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Home - Maple Grove - Weaver Lake Road Improvements\" \/>\n<meta property=\"og:description\" content=\"[vc_row][vc_column width=&#8221;2\/3&#8243;][vc_column_text css=&#8221;&#8221;] Project Update: June 5, 2026 Completed Work Tarleton Crest to West Fish Lake Road Completed removals on the westbound lanes. Completed spot utility work. Began pouring concrete curb and gutter. What to Expect Next Week Tarleton Crest to West Fish Lake Road...\" \/>\n<meta property=\"og:url\" content=\"https:\/\/clients.bolton-menk.com\/weaverlakeroad\/\" \/>\n<meta property=\"og:site_name\" content=\"Maple Grove - Weaver Lake Road Improvements\" \/>\n<meta property=\"article:modified_time\" content=\"2026-06-05T20:41:42+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/clients.bolton-menk.com\\\/weaverlakeroad\\\/\",\"url\":\"https:\\\/\\\/clients.bolton-menk.com\\\/weaverlakeroad\\\/\",\"name\":\"Home - Maple Grove - Weaver Lake Road Improvements\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/clients.bolton-menk.com\\\/weaverlakeroad\\\/#website\"},\"datePublished\":\"2021-01-29T03:25:07+00:00\",\"dateModified\":\"2026-06-05T20:41:42+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/clients.bolton-menk.com\\\/weaverlakeroad\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/clients.bolton-menk.com\\\/weaverlakeroad\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/clients.bolton-menk.com\\\/weaverlakeroad\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/clients.bolton-menk.com\\\/weaverlakeroad\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Home\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/clients.bolton-menk.com\\\/weaverlakeroad\\\/#website\",\"url\":\"https:\\\/\\\/clients.bolton-menk.com\\\/weaverlakeroad\\\/\",\"name\":\"Marine on St. Croix Comp Plan\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/clients.bolton-menk.com\\\/weaverlakeroad\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Home - Maple Grove - Weaver Lake Road Improvements","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/clients.bolton-menk.com\/weaverlakeroad\/","og_locale":"en_US","og_type":"article","og_title":"Home - Maple Grove - Weaver Lake Road Improvements","og_description":"[vc_row][vc_column width=&#8221;2\/3&#8243;][vc_column_text css=&#8221;&#8221;] Project Update: June 5, 2026 Completed Work Tarleton Crest to West Fish Lake Road Completed removals on the westbound lanes. Completed spot utility work. Began pouring concrete curb and gutter. What to Expect Next Week Tarleton Crest to West Fish Lake Road...","og_url":"https:\/\/clients.bolton-menk.com\/weaverlakeroad\/","og_site_name":"Maple Grove - Weaver Lake Road Improvements","article_modified_time":"2026-06-05T20:41:42+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/clients.bolton-menk.com\/weaverlakeroad\/","url":"https:\/\/clients.bolton-menk.com\/weaverlakeroad\/","name":"Home - Maple Grove - Weaver Lake Road Improvements","isPartOf":{"@id":"https:\/\/clients.bolton-menk.com\/weaverlakeroad\/#website"},"datePublished":"2021-01-29T03:25:07+00:00","dateModified":"2026-06-05T20:41:42+00:00","breadcrumb":{"@id":"https:\/\/clients.bolton-menk.com\/weaverlakeroad\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/clients.bolton-menk.com\/weaverlakeroad\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/clients.bolton-menk.com\/weaverlakeroad\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/clients.bolton-menk.com\/weaverlakeroad\/"},{"@type":"ListItem","position":2,"name":"Home"}]},{"@type":"WebSite","@id":"https:\/\/clients.bolton-menk.com\/weaverlakeroad\/#website","url":"https:\/\/clients.bolton-menk.com\/weaverlakeroad\/","name":"Marine on St. Croix Comp Plan","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/clients.bolton-menk.com\/weaverlakeroad\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"}]}},"_links":{"self":[{"href":"https:\/\/clients.bolton-menk.com\/weaverlakeroad\/wp-json\/wp\/v2\/pages\/21","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/clients.bolton-menk.com\/weaverlakeroad\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/clients.bolton-menk.com\/weaverlakeroad\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/clients.bolton-menk.com\/weaverlakeroad\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/clients.bolton-menk.com\/weaverlakeroad\/wp-json\/wp\/v2\/comments?post=21"}],"version-history":[{"count":211,"href":"https:\/\/clients.bolton-menk.com\/weaverlakeroad\/wp-json\/wp\/v2\/pages\/21\/revisions"}],"predecessor-version":[{"id":789,"href":"https:\/\/clients.bolton-menk.com\/weaverlakeroad\/wp-json\/wp\/v2\/pages\/21\/revisions\/789"}],"wp:attachment":[{"href":"https:\/\/clients.bolton-menk.com\/weaverlakeroad\/wp-json\/wp\/v2\/media?parent=21"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}