13th St, Grace Ave & Rice Ave Improvements
Proposed Improvements
- asphalt streets with concrete curb and gutter
- concrete driveway aprons
- sanitary sewer system
- water main, hydrants and water services
- storm sewer system
Construction is anticipated to begin May 2024!
Project Update – December 11, 2024
Construction for the 13th Street SW, Grace Avenue SW, and Rice Avenue SW Improvement Project is complete for the 2024 construction season. The final layer of bituminous street pavement will be paved in the spring of 2025.
Seeding: Dormant seeding was completed in the majority of the project areas. This seed will act as newly planted seed when air and ground temperatures begin to rise in the spring. Once temperatures are consistently above freezing in the spring, residents are advised to follow the Newly Seeded Lawn Maintenance Guide. Topsoil settlement and turf establishment will be monitored in the spring. Regrading and reseeding will be completed as necessary.
Winter Concrete Care: New concrete is more susceptible to the freeze and thaw cycles in its first year, which causes cracking. Residents can help reduce the possibility of damage by reducing or eliminating salt usage on the new concrete. Please refer to the Winter Concrete Care Guide for information on alternatives to salt.
Remaining Items: If there are any items that you believe need to be addressed, please contact Nate Thein at 320-979-9070 or Nate.Thein@bolton-menk.com.
Project Contacts
On-Site Construction Project Representative
Nate Thein
Bolton & Menk, Inc.
320-979-9070
Nate.Thein@bolton-menk.com
Project Engineer
Mitchell Lease
Bolton & Menk, Inc.
320-441-9146
Mitchell.Lease@bolton-menk.com