2020 Street Improvements
The City of Windsor Heights is undergoing street reconstruction on the following streets:
- 69th Street – between University Avenue and School Street
- Allision Avenue – between 64th Street and 66th Street
- College Drive – between Harbach Boulevard and 73rd Street
The proposed construction includes sanitary sewer spot repair, storm sewer improvements and complete street reconstruction. A new watermain is proposed to be constructed on 69th Street. Both College Drive and 69th Street will have the existing sidewalks replaced with new sidewalks on the same side of the street as they currently are. The project will be constructed in the 2020 and 2021.