Project Overview
Project Objectives
- Improve street surface conditions
- Replace sewer and water infrastructure
- Improve sidewalk conditions
- Reconstruct curb and gutter
Proposed Improvements
- Street reconstruction; concrete pavement with subsurface drains
- Concrete driveway aprons, curb and gutter
- Water distribution system replacement
- Water and sewer lines to property lines
- Concrete sidewalk replacement to meet ADA standards
Anticipated Start Date
July 5, 2023
Contractor
Henning Construction
Contact Information
Travis Winter, Principal Engineer
Bolton & Menk, Inc.
612-247-5663
Travis.Winter@bolton-menk.com
Bridger Kraye, Project Representative
Bolton & Menk, Inc.
507-432-0030
Bridger.Kraye@bolton-menk.com
Justin Olson, Project Engineer
Bolton & Menk, Inc.
507-848-6927
Justin.Olson@bolton-menk.com