Project Overview
Project Objectives
The objective of this project is to conduct necessary street and utility improvements in the area south and west of Lake Fremont
Proposed Improvements
- Removal of the existing pavement.
- Removal of boulevard trees which interfere with the construction.
- Replacement of watermain, water services and curb stop.
- Construction of storm sewer to improve drainage.
- Rehabilitation of portions of the sanitary sewer main and manholes.
- Replacement of a sanitary sewer forcemain.
- Grading and construction of a new aggregate base roadbed.
- Construction of surmountable style concrete curb and gutter.
- Construction of a bituminous paved street.
- Replacement of driveways up to the right-of-way.
- Replacement of mailbox posts.
- Restoration and seeding of the boulevards.
Contractor
Larson Excavating
Click below to sign up for project updates!
Contact Us!
Kevin Bittner
Principal Engineer
Bolton & Menk
612-270-6926
Al Spilles
Construction Project Rep.
Bolton & Menk
alan.spilles@bolton-menk.com
612-756-3143