Oneida Street Phase 2
Reconstruction Project

Overview

Project Overview

The City of Blue Earth is undertaking a street improvement project in the Riverside Heights neighborhood. This project is intended to enhance street surface conditions, decommission the failing septic system, cap private wells, connect Riverside Heights residents to the City’s water and sewer systems, improve surface drainage conditions, and increase system reliability while reducing maintenance requirements.

Proposed Improvements – Reconstruction

  • Street reconstruction and subsurface drains
  • Reconstuct driveway aprons, curb and gutter
  • Install forcemain from Riverside Heights development to wastewater treatment plant
  • New sanitary sewer mains, pipes, and manholes
  • New watermain, hydrants, valves and fittings
  • Install new water and sewer service lines to property lines
  • Install new storm sewer pipe and construct pond to aid in surface drainage of site

Contact Us!

Have any questions about construction? Email us and a member of the project team will get back to you as soon as possible. See contact info below.

Project Representatives

Kam Domeier, On-site Inspector

[email protected]
(507) 618-1484

Dustin Meyer, Project Engineer

[email protected]
(507) 432-8103

Ben Rosol, City Engineer

[email protected]
(507) 236-6357

Contractor

Matt Schneider, Holtmeier Construction, Inc.

(507) 389-9112