Project Objectives
- Improve street surface conditions
- Replace sewer infrastructure
- Improve sidewalk conditions
- Reconstruct curb and gutter
Proposed Improvements
- Street reconstruction; concrete pavement with subsurface drains
- Concrete driveway aprons, curb and gutter
- Sanitary sewer manhole replacement
- Water and sewer lines to property lines
- Concrete sidewalk replacement to meet ADA standards
Maps
Click on maps to enlarge
Contact Information
Travis Winter, Principal Engineer
Bolton & Menk, Inc.
612-247-5663
Travis.Winter@bolton-menk.com