2023 Street & Utility Improvements

Top
 

Project Overview

Project Objectives

  • Improve street surface conditions
  • Replace sewer infrastructure
  • Improve sidewalk conditions
  • Reconstruct curb and gutter

Proposed Improvements

  • Street reconstruction; concrete pavement with subsurface drains
  • Concrete driveway aprons, curb and gutter
  • Sanitary sewer manhole replacement
  • Water and sewer lines to property lines
  • Concrete sidewalk replacement to meet ADA standards
Tentative Start Date

July 17th, 2023

Contractor

Hulstein Excavating

Contact Information

Justin Zechmeister, Project Representative
Bolton & Menk, Inc.
612-258-1460
Justin.Zechmeister@bolton-menk.com 

Travis Winter, Principal Engineer
Bolton & Menk, Inc.
612-247-5663
Travis.Winter@bolton-menk.com