FAQ’s
Letters will be mailed in late winter/early spring 2024 to all homeowners that will have a tree removed in front of their property to identify which trees are to be removed and the reason why it is necessary. Preliminary tree removals will be shown in the proposed improvement figures under Project Documents on the project website when available. Such trees will be removed in the spring of 2024. Trees that are removed will be replaced with a 2” diameter tree in the fall of 2024. Homeowners will have the opportunity to send in their preference for the species of tree to be planted in front of their property from a list provided by the City.
Please reach out to Nick Amatuccio at nickam@bolton-menk.com or 612-965-3926 if you have any questions or concerns about a tree on your property.
• Concrete curb & gutter improves drainage along the roadway edge thereby reducing if not eliminating nuisance drainage issues. Streets in the neighborhood have varying topography, and some are relatively flat along their length. Concrete curb and gutter can be installed at relatively flat slopes, but still consistently draining in one direction. Roadways with bituminous asphalt or turf ditches cannot effectively be installed at flat slopes without also succumbing to nuisance drainage issues such as shallow ponding along the roadway edges and adjacent ditches.
• Concrete curb & gutter improves drainage along the roadway edge thereby keeping water out of the roadway pavement subgrade. Minnesota roadways are routinely subject to freeze/thaw cycles that greatly impact their lifespan. Eliminating water from the aggregate layers within the street pavement reduces the impact of the freeze/thaw cycle on pavement performance. The presence of concrete curb and gutter directs water more efficiently toward drainage inlets, not allowing that water time to soak into the pavement subgrade where it may become temporarily trapped and add to freeze/thaw impact, reduces maintenance costs, and improves efficiency in snow removal operations.
• Concrete curb & gutter provides a solid edge for the bituminous asphalt pavement. One of the keys to installing a long-lasting bituminous pavement is having it effectively compacted during installation. For this reason, heavy equipment such as a large steel drum roller is used on the pavement after it is placed. Where curb does not exist and the pavement is left unconfined at one edge, adequate density/compaction cannot be easily achieved. The steel drum roller can essentially squish the pavement outward at the unconfined edge, not achieving required densities and thereby decreasing the integrity and lifespan of that pavement. Having a concrete curbing along the roadway edge allows the bituminous pavement to be confined within the roadway and compressed against the curbing as it is rolled, improving pavement integrity through increased density/compaction. It is a goal of the City to cost effectively manage its infrastructure by maximizing its lifespan at reasonable cost. For this reason and the reasons listed above, it is City policy to install curb & gutter on all reconstructed roadways.
This project will apply special assessments to the individual properties within the project area to fund a portion of the project per City policy. The following improvements are funded separately and do not impact assessments: 1. City water mains (funded by the City’s water enterprise fund) 2. City sanitary sewer mains (funded by the City’s sanitary sewer enterprise fund) 3. City storm sewer mains (funded by the City’s storm sewer enterprise fund) 4. Concrete curb & gutter (funded by the City’s storm sewer enterprise fund) 5. Public Sidewalks (funded by the City’s general fund) 6. Other improvements completed above/beyond the assessment cap and/or assessment policy
Total assessment amounts for each property are calculated as the sum of each property’s street assessment amount and utility service assessment amount.
The street assessment for each property is generally applied at a cost per foot of property frontage. For single family residential properties, the street assessment amount is calculated as the LESSER of 70% of the street improvement cost or the cap rate of $106.14/front foot of property length for residential properties in this project. In almost all cases, the cap rate of $106.14/front foot is used for calculating the street assessment amount. The length of property frontage is also capped at 125 feet for residential properties.
Street assessments for commercial, multi-family residential, and institutional properties are calculated similar to this method, but without the use of capped footages or rates. The City also works with a third party to obtain special benefit appraisals for commercial, multi-family residential, and institutional properties and then the lower of the benefit appraisal or City policy is used for the special assessment to each property. Special conditions encountered at cul-de-sacs / dead ends for single family properties and a calculation of front footage is made to uniformly apply the cap rate to such properties which have similar benefit as properties outside of cul-de-sacs / dead ends. Questions regarding calculation of assessment amounts for special properties referenced in this paragraph should be directed to Nick Amatuccio at nickam@bolton-menk.com or 612-965-3926.
The utility service assessments are calculated as 50% of the as-bid, actual costs for replacement of the individual water and sewer service lines serving each property. These amounts will be determined in February/March 2024 once contractor bids are received.
Deferring assessments allows a property owner to pay the assessment at a later date, however the interest is accrued during the deferment. If an assessment is deferred, it must be paid at the sale of the property, death of the owner, or once any of the requirements above are no longer met. Most commonly, deferred assessments and accrued interest end up being paid in full at the sale of property.
*The dates for payment and the interest rate have yet to be determined and won’t be known until spring 2024, prior to construction.
The owner of each private property owns the entire length of their water and sewer service from the main in the street to the house, including the portion within the public right-of-way and under the street. In the event of a sewer or water service break, often the costliest location for a break is located under the street pavement as the cost of replacing the roadway can be substantial. Replacement of this portion of the service with the project therefore avoids those substantial costs from being incurred for some time.
If a property’s sewer service is made of orangeburg material or water service is made of lead material, State plumbing code also requires replacement of your service within one year of discovery. For these situations, the project team will provide an estimate to replace the remainder of the water or sewer service by the City’s Contractor. In this case, the property owner can choose to have this work completed by the City’s contractor and have the additional cost added to the original assessment. Owners can instead choose to use their own private plumber to have the work completed. Regardless of material, property owners can also choose to replace the remainder of their service using a private contractor. Replacement of sewer and water service lines will at some point become necessary for each property outside the City’s reconstruction limits. A convenient time to do this is in conjunction with the City project, while the street and parts of yards are already disturbed, but before the City project is complete. The project team can help coordinate timing of this with property owners during construction if notified of a property owner’s intent to have this work completed.
Finally, the project team will also work with property owners that are interested in trenchless replacement of their services, for special situations such as the existing service line traversing underneath a healthy, quality tree. The trenchless replacement under the tree will need to be completed through a private contractor, but the project team can coordinate the work with the City’s contractor. This may also be of interest to residents who currently have services that run under retaining walls, steps, or driveways.
Impacted hardscapes within the right-of-way that are critical to the function of the yard such as retaining walls, paver walkways, and fences will be salvaged and reinstalled as part of the project. Impacted decorative landscaping and plantings within the right-of-way will need to be salvaged and reinstalled by the homeowner if they are to be saved. These items can also be simply removed and disposed of by the project if the homeowner does not wish to salvage them. The project team will avoid impacts to landscaping when feasible but disturbances to landscaping within the right-of-way can often be difficult to avoid, especially if it’s near the street, driveway, or sewer/water service.
Landscaping impacts will be identified and coordinated when the project’s final design is complete in the winter of 2022-2023. Once landscaping impacts are identified, affected properties will be mailed letters in the late winter or early spring. Property owners can then meet with project team members to discuss the extent of the impacts and next steps.
During working hours, access may not be available if an excavation is occurring in front of or near your property. Workers will knock on doors or leave notices to ensure residents can get out of their driveways if needed prior to blocking off access.
The most significant direct property access restriction that residents will experience is when the concrete is poured in front of driveway accesses. Residents will need to be out of their driveway for about 7 days to let the concrete cure (harden). Notices will be delivered at least 24 hours in advance of this work with more detailed information.