Construction Updates

July 26, 2024

Sod on Phase 1A next week!

Work Completed Week of July 22

  • Topsoil and retaining wall installation on Phase 1A
  • First layer of asphalt was paved on Phase 1B & Phase 3A
  • Grading behind the curb for sidewalks on Phase 1B
  • Sewer and water services completed on Phase 2
  • Storm sewer installation began on Phase 2

Work Anticipated Week of July 29

  • Sod installation on Phase 1A
  • Sidewalks on Phase 1B to be poured later in the week
  • Turf restoration on Phase 3A
  • Utility work will be finished on Phase 2
  • Road excavation to begin on Phase 2 later in the week
  • The asphalt alley pavement between 6th Ave N and 7th Ave N, north of Mainstreet, will be removed in preparation for a new concrete sidewalk to connect the two streets