Project Overview
Project Objectives
- Reduce sanitary sewer inflow, infiltration, and obstructions
- Increase water system quality and fire flow
- Replace deteriorating storm sewer infrastructure
- Improve reliability and decrease maintenance
- Improve street surface conditions
Proposed Improvements – Reconstruction
- Sanitary sewer pipes and manholes
- Sanitary lift stations
- Treatment pond repairs
- Water system pipes, valves, and hydrants
- Water plant & water tower rehabilitation
- Storm sewer pipes, inlets, and manholes
- Sewer and water services to the property line
- Street reconstruction or spot repairs
- Concrete curb & gutter and driveways
Contractor
Ulland Brothers, Inc.
Click below to sign up for project updates!
Contact Us!
Bill Dunn
Resident Project Representative
507-508-6641
Travis Winter
Project Manager, Bolton & Menk, Inc.
Jason Zinter
Project Engineer, Bolton & Menk, Inc.
(507) 236-2371