Street and Utility Improvement

Top
 

Home

Project Overview

Project Objectives

  • Reduce sanitary sewer inflow, infiltration, and obstructions
  • Increase water system quality and fire flow
  • Replace deteriorating storm sewer infrastructure
  • Improve reliability and decrease maintenance
  • Improve street surface conditions

Proposed Improvements – Reconstruction

  • Sanitary sewer pipes and manholes
  • Sanitary lift stations
  • Treatment pond repairs
  • Water system pipes, valves, and hydrants
  • Water plant & water tower rehabilitation
  • Storm sewer pipes, inlets, and manholes
  • Sewer and water services to the property line
  • Street reconstruction or spot repairs
  • Concrete curb & gutter and driveways

Contractor


Ulland Brothers, Inc.

Click below to sign up for project updates!


Sign up for project updates

To sign up for project updates, please enter your contact information below.

Contact Us!


Bill Dunn

Resident Project Representative

507-508-6641

bill.dunn@bolton-menk.com

Travis Winter

Project Manager, Bolton & Menk, Inc.

Travis.Winter@bolton-menk.com

Jason Zinter

Project Engineer, Bolton & Menk, Inc.

(507) 236-2371

jason.zinter@bolton-menk.com