Project Overview
Project Objectives
- Reduce sanitary sewer inflow, infiltration, and obstructions
- Increase water system quality and fire flow
- Replace deteriorating storm sewer infrastructure
- Improve reliability and decrease maintenance
- Improve street surface conditions
Proposed Improvements – Reconstruction
- Sanitary sewer pipes and manholes
- Sanitary lift stations
- Treatment pond repairs
- Water system pipes, valves, and hydrants
- Water plant & water tower rehabilitation
- Storm sewer pipes, inlets, and manholes
- Sewer and water services to the property line
- Street reconstruction or spot repairs
- Concrete curb & gutter and driveways
Contractor
Ulland Brothers, Inc.
Click below to sign up for project updates!
Contact Us!
PJ Christensen
Resident Project Representative, Bolton & Menk Inc.
- (507) 848-1643
- [email protected]
Travis Winter
Project Manager, Bolton & Menk, Inc.
- [email protected]
- (612) 247-5663
Dustin Meyer
Project Engineer, Bolton & Menk, Inc.
- (507) 432-8103
- [email protected]