Broadway Avenue Reconstruction Project
Top
Broadway Ave, looking downtown from river bridge

What will construction look like?

Construction is anticipated to begin on Monday, April 19, weather permitting, and last through Fall 2022. Construction work will take place Monday – Friday, 7 a.m. – 7 p.m., with the possibility of some work taking place on Saturdays should construction fall behind schedule.

Drivers can expect major disruption when traveling through and around the corridor for the duration of the project. Please follow all detour signs throughout the project for the best navigation during this time.

Detour Maps

Click each map to open a pdf file that you can download and print!

Detour Map- Color

Detour Map- Black and White

Business Access Map

North Broadway Ave Pedestrian Detour

Traffic Impacts

April 19 – May 10 (dates are weather dependent)

  • Silver Lake Drive NE will be closed at the North Broadway intersection. This closure is for the construction of a bypass that will be used for the future project detour.
  • North Broadway traffic will be restricted to one lane northbound and one lane southbound between 11th St North and the Zumbro River bridge.
  • Sidewalks and Recreational Trails:
    • Access along and across North Broadway Avenue will be maintained at all times.
    • The Silver Lake Trail on the south side of the lake will be closed near 13th St/North Broadway Avenue. A signed pedestrian detour for trail users, including cyclists, will provide a path for crossing North Broadway.
  • Rochester Public Transit:
    • Some delays may occur on routes 21, 101, 102, and 150X due to traffic restrictions and potential backups.

Beginning May 10 (dates are weather dependent)

  • North Broadway will be closed to through traffic between Civic Center Drive and Silver Lake Drive NE. Thru traffic will detour to Silver Lake Drive NE. Local traffic and business access for North Broadway will utilize side streets (5th Street North to 13 1/2 Street North).
  • Sidewalks and Recreational Trails:
    • Access along and across North Broadway Avenue will be maintained at all times.
    • The Silver Lake Trail on the south side of the lake will re-open via a temporary pedestrian and bicycle path. This temporary route, for pedestrians and cyclists alike, will use 12th Street NE and North Broadway to connect trail users to the Cascade Creek Trail and the Silver Lake Trail on the north side of the lake. This temporary route will be in place for the first phases of the project and will be modified as the work locations shift throughout the 2021 construction season.
  • Rochester Public Transit
    • Routes 101, 102, and 21 will detour along Silver Lake Drive NE. Temporary bus stops will be installed along the detour routes. See rptride.com for more information.
  • Pedestrian access will be maintained throughout the project either on existing sidewalks or via temporary routes. Pedestrians and cyclists should pay close attention to any sidewalk/trail closures that direct individuals to a detour.

Sign up for emails

Project Updates
To sign up for construction updates, please enter your contact information below.

Project Goals

Address
• Aging pavement
• Safety
• Mobility for all users

Enhance
• Pedestrian and bike facilities
• Visual identity – Gateway to Downtown
• Transit facilities and access

Contacts

Cory Penz, Access Manager
Elcor Construction
507-735-0150
cory@elcorconstruction.com

Matt Smith, Project Manager
Elcor Construction
507-951-1062
matt@elcorconstruction.com


Josh Fjetland, Lead Inspector
City of Rochester
507-328-2434
jfjetland@rochestermn.gov

Jaymi Wilson, Business Liaison
City of Rochester
507-328-2023
jwilson@rochestermn.gov