Construction Updates

Construction Updates

Week of May 13 – 17

This week, the contractor installed watermain in the intersection of Memorial Road and Lakeshore Dr. Work extended through the entire week due to inclement weather.

Next week the contractor plans to finish the water main work in the intersection, though no service interruptions are anticipated. Following completion of the watermain, sanitary work will begin in the intersection and continue north along Memorial Road. The gas company also plans to finish their gas main relocation along both Lakeshore Drive and Memorial Road by Friday of next week, barring weather or unforeseen circumstances.

Week of May 6 – 10

Last week, the contractor installed sanitary casing pipe in the central portion of Memorial Road. Inclement weather caused the expected work to take the entirety of the week. Preparations were also made to begin pavement removal at the south end of Memorial.

For this week, the contractor plans to perform watermain work with a service interruption Monday between 2 p.m. and 5 p.m. They will also be closing the south half of Memorial Road to all traffic for pavement removal. Another water service interruption is scheduled for Wednesday between 1 p.m. and 5 p.m. to facilitate watermain work within the intersection of Memorial and Lakeshore Dr due to rain delays from last week. Notices for both service interruptions have been distributed to the affected business. Sanitary sewer work is tentatively planned for Thursday depending on weather conditions and material availability.

April 29, 2024

Beginning Thursday, May 2, the westbound right lane of Lakeshore Drive will be closed to traffic as the contractor prepares to begin work at the intersection of Lakeshore Drive and Memorial Road. The south end of Memorial Road will be closed for the duration of the project starting Thursday as well. Access will still be maintained off Lakeshore Drive to local businesses and from the north end of Memorial Road.

Due to watermain work in this area, water service will be temporarily suspended on Monday, May 6 between 1 p.m. and 5 p.m. Affected residents and business will be notified via doorhangers prior to the shutdown. If you do not receive a doorhanger and experience water pressure loss, please contact Luke Vander Horst at (712) 232-5941.

The timing and duration of the water service suspension and road closure is subject to change. Property owners will receive updates regarding any deviations to contractor’s plans. Thank you for your continual patience and cooperation.

April 26, 2024

As the contractor prepares to perform utility work the week of April 29, the central portion of Memorial Road from Marshall Ave to Rolloff Dumpster and Rental will be closed to through traffic. With this closure in effect, please be aware that businesses near the closure are still open and access is available from Lakeshore Dr on the south end of Memorial Rd and from 3rd St on the north end.

If there are any specific question or concerns regarding access to businesses or location near the closure area, please reach out to Luke Vander Horst (712-232-5941). Thank you for your continual patience and cooperation throughout the process of improving our community!

April 19, 2024

Due to watermain work along Memorial Road, water service will be temporarily suspended on Wednesday, April 24 between 8 a.m. and 12 p.m. and on Thursday, April 25 between 12 p.m. and 4 p.m. Affected residents and business will be notified via doorhangers prior to the shutdown.

If you do not receive a doorhanger and experience water pressure loss, please contact Luke Vander Horst at (712) 232-5941.