Cleveland Ave W Street & Utility Improvements Project
Top
 

Home

Project Overview

Project Objectives

  • Improve street surface conditions
  • Reduce sewer inflow, infiltration, and obstructions
  • Increase water system flow capacity
  • Replace deteriorating infrastructure
  • Improve reliability and decrease maintenance
  • Improve surface drainage conditions

Proposed Improvements – Reconstruction

  • Street reconstruction: subsurface drains
  • Driveway aprons, curb & gutter
  • Sanitary sewer mains, pipes, and manholes
  • Storm sewer mains, pipes, and manholes
  • Replace watermain, hydrants, valves, and fittings
  • Water and sewer lines to property lines
  • Concrete sidewalk

Contractor


Ulland Brothers

Click below to sign up for project updates!


Sign up for project updates

To sign up for project updates, please enter your contact information below.

Contact Us!


Emma Sullivan

On-site Construction Representative – Bolton & Menk, Inc.

emma.sullivan@bolton-menk.com

507-810-9158

Matthew Cole

City Engineer – Bolton & Menk, Inc.

Matthew.cole@bolton-menk.com

507-848-5208