Cleveland Ave W Street & Utility Improvements Project
Top
 

Home

Project Overview

Project Objectives

  • Improve street surface conditions
  • Reduce sewer inflow, infiltration, and obstructions
  • Increase water system flow capacity
  • Replace deteriorating infrastructure
  • Improve reliability and decrease maintenance
  • Improve surface drainage conditions

Proposed Improvements – Reconstruction

  • Street reconstruction: subsurface drains
  • Driveway aprons, curb & gutter
  • Sanitary sewer mains, pipes, and manholes
  • Storm sewer mains, pipes, and manholes
  • Replace watermain, hydrants, valves, and fittings
  • Water and sewer lines to property lines
  • Concrete sidewalk

Contractor


Ulland Brothers

Click below to sign up for project updates!


To sign up for project updates, please enter your contact information below.

Contact Us!


Dustin Meyer

On-site Construction Representative – Bolton & Menk, Inc.

Dustin.Meyer@bolton-menk.com

507-432-8103

Matthew Cole

City Engineer – Bolton & Menk, Inc.

Matthew.cole@bolton-menk.com

507-848-5208