Street Improvement Project – West

Eagle Ridge Drive W Area, 7TH Avenue NW Area, & 21ST Avenue SW Area

Proposed Improvements

The City of Willmar is planning to improve the Eagle Ridge Drive W Area, 7TH Avenue NW Area, & 21ST Avenue SW Area.

Improvements include:

  • Asphalt surfacing
  • Concrete curb and gutter spot repair

construction newsletter has been distributed to all residents within the project area. This newsletter outlines the general sequence of construction and provides estimated timeframes for each phase. Moving forward, all project updates will be posted on the project website and distributed electronically to subscribers via email and text message.

If you have any questions or concerns that are not addressed in the newsletter or with this update, please do not hesitate to reach out to the project contacts listed on the website.

Construction Updates

Aug 29, 2025

Phase 1 – Eagle Ridge Drive West Area (Full Depth Reclamation)

Week of August 29, 2025

  • Concrete cure

Week of September 2, 2025

  • No work on Labor Day (September 1)
  • Final grading of the street base in preparation for asphalt pavement

Week of September 8, 2025

  • Install asphalt base course
  • Topsoil backfill
  • Seeding/Mulching
  • Raise castings in street

Week of September 15, 2025

  • Install asphalt top course

Phase 2 – Fairway Drive (Mill & Overlay)

Week of September 2, 2025

  • No work on Labor Day (September 1)
  • Mill street pavement
  • Asphalt patching
  • Topsoil backfill
  • Seeding/Mulching

Phase 3 – 8th Avenue NW & 29th Street NW

Week of September 8, 2025

  • Reclamation of existing pavement and gravel base
  • Salvage reclaim material and excavate subgrade

Week of September 15, 2025

  • Install salvaged reclaim material
  • Concrete spot removals
  • Concrete spot replacement (7-day cure time)

Phase 4 – 7th Avenue NW

Week of September 8, 2025

  • Installation of temporary access road
    • 7th Avenue NW will be closed to traffic during construction and a temporary gravel road will be constructed connecting 33rd Street NW to Regency Mobile Home Park.  See 7th Avenue NW Temporary Access note below.
  • Reclamation of existing pavement and gravel base
  • Salvage reclaim material and excavate subgrade

Week of September 15, 2025

  • Install salvaged reclaim material
  • Concrete spot removals
  • Concrete spot replacement (7-day cure time)

Phase 5 – 20th Avenue SW, 21st Avenue SW, 24th Street SW

  • Construction is anticipated to start late September.  Additional updates will be provided as we approach that time frame.

Phase 6 – 21st Avenue SW, 22nd Street SW

  • Construction is anticipated to start late September.  Additional updates will be provided as we approach that time frame.

New Concrete Notice
Please avoid driving on newly poured concrete curbs and driveways for at least 7 days to allow proper curing and strength development.

7th Avenue NW Temporary Access

Since 7th Avenue NW provides the only access to County Road 5 from the 33rd Street NW development and Valleyside Townhomes, the City has provided a temporary access road through Valleyside Townhomes and the Regency Mobile Home Park properties. Prior to construction operations on 7th Avenue NW, detour signage will be installed to help drivers navigate to County Road 5 through the temporary access road. Please refer to the 7th Avenue NW Area phasing figure for a visual aid.

We appreciate your patience and understanding as we work to improve your streets.

Contractor

Duininck Incorporated

Prinsburg, MN

Documents

Construction Newsletter 01 – Revised

Construction Newsletter 01

Sign Up for Project Updates

Engineer Contacts

Nate Thein
On-site Construction Representative, Bolton & Menk, Inc.
(320)-979-9070
Nate.Thein@bolton-menk.com

Spencer Johnson
Project Manager, Bolton & Menk, Inc.
(320)-979-6136
Spencer.Johnson@bolton-menk.com

Contractor Contact

Crystal Swanson
Project Manager, Duininck Inc.
(320)-212-9384
crystalswanson@duininck.com