Home
City Construction Projects
General Engineering
2021 Infrastructure Improvements Project
2023 Beaumont Bluffs: Phase 2
2023 TH 21 / CR 66 / Sawmill Roundabout
2023 Bluff Drive Area Grade Separation & Frontage/Backage Roads
2024 US 169 Resurfacing and Access Management; Jordan through Sand Creek Twp
2024 – 2025 MnDOT’s Jordan Truck Station
2024 US 169 / CR 59 (Delaware Ave) Grade Separation
2025 – 2026 US 169 / Hwy 282 / CR 9 Interchange
282 Creek Lane Roundabout
TH 282 Retaining Wall across from Mill Street
TH 282 Railroad Crossing
Sunset Drive Improvements
Pauly Park (Future Park Atop the Bluff)
Bidding Documents
Home
City Construction Projects
General Engineering
2021 Infrastructure Improvements Project
2023 Beaumont Bluffs: Phase 2
2023 TH 21 / CR 66 / Sawmill Roundabout
2023 Bluff Drive Area Grade Separation & Frontage/Backage Roads
2024 US 169 Resurfacing and Access Management; Jordan through Sand Creek Twp
2024 – 2025 MnDOT’s Jordan Truck Station
2024 US 169 / CR 59 (Delaware Ave) Grade Separation
2025 – 2026 US 169 / Hwy 282 / CR 9 Interchange
282 Creek Lane Roundabout
TH 282 Retaining Wall across from Mill Street
TH 282 Railroad Crossing
Sunset Drive Improvements
Pauly Park (Future Park Atop the Bluff)
Bidding Documents
Top
2020 Infrastructure Improvements
190
th
Street Trail Improvements