Home
City Construction Projects
General Engineering
2021 Infrastructure Improvements Project
2023 Beaumont Bluffs: Phase 2
2023 TH 21 / CR 66 / Sawmill Roundabout
2023 Bluff Drive Area Grade Separation & Frontage/Backage Roads
2024 US 169 Resurfacing and Access Management; Jordan through Sand Creek Twp
2024 – 2025 MnDOT’s Jordan Truck Station
2024 US 169 / CR 59 (Delaware Ave) Grade Separation
2025 – 2026 US 169 / Hwy 282 / CR 9 Interchange
282 Creek Lane Roundabout
TH 282 Retaining Wall across from Mill Street
TH 282 Railroad Crossing
Sunset Drive Improvements
Pauly Park (Future Park Atop the Bluff)
Bidding Documents
Home
City Construction Projects
General Engineering
2021 Infrastructure Improvements Project
2023 Beaumont Bluffs: Phase 2
2023 TH 21 / CR 66 / Sawmill Roundabout
2023 Bluff Drive Area Grade Separation & Frontage/Backage Roads
2024 US 169 Resurfacing and Access Management; Jordan through Sand Creek Twp
2024 – 2025 MnDOT’s Jordan Truck Station
2024 US 169 / CR 59 (Delaware Ave) Grade Separation
2025 – 2026 US 169 / Hwy 282 / CR 9 Interchange
282 Creek Lane Roundabout
TH 282 Retaining Wall across from Mill Street
TH 282 Railroad Crossing
Sunset Drive Improvements
Pauly Park (Future Park Atop the Bluff)
Bidding Documents
Top
Welcome
to the home of the City of Jordan’s construction projects and general engineering information.
2023 TH 21 / CR 66 / Sawmill Roundabout
2023 Beaumont Bluffs Phase 2
2023 Bluff Drive Area Grade Separation & Frontage/Backage Roads
Pauly Park (Future Park Atop the Bluff)
2024 – 2025 MnDOT’s Jordan Truck Station
General City Engineering Information
2024 US 169 / CR 59 (Delaware Ave) Grade Separation
TH 282 Retaining Wall across from Mill Street
2024 US 169 Resurfacing and Access Management; Jordan through Sand Creek Township
2025 – 2026 US 169 / Hwy 282 / CR 9 Interchange
Sunset Drive Improvements
TH 282 Railroad Crossing