An open house meeting has been scheduled for the project to discuss the proposed improvements. The meeting will be open house format, so residents can come and go anytime during the meeting. A pre-recorded presentation with information on the project will be playing on a TV at the meeting. The recorded presentation is also available at the link below.

When: June 4, 2024, 4:30 PM – 6:30 PM

Where: Jordan City Council Chambers, 116 First Street E, Jordan, MN 55352

View the Pre-Recorded Presentation: CLICK HERE

2024 Infrastructure Improvements

Background

The City of Jordan is planning to make improvements to various streets and alleys during the summer of 2024 (see map above). The project was bid in April 2024 and construction is expected to begin sometime after July 1st, 2024. The project will be completed by the fall of 2024. The project scope generally includes:

Alleys:

  • Grading/drainage improvements
  • The addition of storm sewers in areas where surface drainage cannot be achieved
  • Concrete paving of the alley

Street Resurfacing

  • Resurfacing of street pavement (method as noted in the map above)
  • Spot removal and replacement of deficient curb and gutter segments
  • Replacement of concrete pedestrian ramps for compliance with the Americans with Disabilities Act (ADA)

Schedule

  • Fall 2023: Preliminary Data Collection
  • December 2023 – January 2024: Preliminary Engineering
  • February 2024: Public Open House
  • February – April 2024: Final Design
  • Spring 2024: Bidding
  • Summer 2024: Construction

Bids for the project were recently received, but the contract has not yet been awarded to a contractor. Once the project has been awarded, the contractor will supply the City with their proposed schedule. The City will then notify residents of the project schedule and update them as construction progresses. Generally, construction will start sometime around or after the beginning of July and will be completed by the fall of 2024. Resident will be notified of construction updates via mailings, project emails, and/or paper notices delivered to their front door. 